Professional Documents
Culture Documents
MAJLIS DAERAH
YONG PENG
12,680 Hektar
MAJLIS PERBANDARAN
BATU PAHAT
187,702 Hektar
PETA PERSEMPADANAN PARLIMEN
PARLIMEN
PARLIMEN AYER HITAM
PARIT SULONG
PARLIMEN
BATU PAHAT
- DUN PENGGARAM
- DUN SENGGARANG
- DUN RENGIT
PETA PERSEMPADANAN DUN
P 147 PT. SULONG P 148 AYER HITAM
AHLI PARLIMEN
16
14
12
10
0
Ramalan Dan
Pengurusan
Amaran Sungai Dan
Banjir Sumber Air & Saliran Bandar Pantai
Banjir/Kemara Koridor
Alam Sekitar
u
2008 8 4 3 2 4 6
2009 15 3 3 2 3 6
2010 17 5 4 3 5 6
KUMULATIF ADUAN 2008-2010
18%
Banjir
12% 40% Pengurusan Sumber
Air Dan Alam Sekitar
Saliran Bandar
7% Ramalan Dan Amaran
10% 13%
Banjir/Kemarau
Sungai Dan Koridor
Rumusan Aduan
1. Majoriti aduan adalah berkenaan banjir iaitu 40%.
2. Aduan kedua tertinggi adalah berkaitan pantai iaitu
18%.
TABURAN ADUAN AWAM
PETUNJUK
Banjir (40)
Kejuruteraan (18)
Pantai
2 Tajul, Ho & Ng Consultants Sdn. Bhd. Master plan study for kajian pelan induk tebatan Ogos 2009
banjir bagi lembangan Sungai Batu Pahat, Johor. Final
Report. Jilid I.
3 Tajul, Ho & Ng Consultants Sdn. Bhd. Master plan study for kajian pelan induk tebatan Ogos 2009
banjir bagi lembangan Sungai Batu Pahat, Johor. Final
Report. Jilid II.
4 Tajul, Ho & Ng Consultants Sdn. Bhd. Master plan study for kajian pelan induk tebatan Ogos 2009
banjir bagi lembangan Sungai Batu Pahat, Johor. Final
Report. Jilid III.
5 Tajul, Ho & Ng Consultants Sdn. Bhd. Flood mitigation master plan for Batu Pahat river Ogos 2009
basin, Johor. Final Report. Volume 1. Executive
summary.
6 Tajul, Ho & Ng Consultants Sdn. Bhd. Flood mitigation master plan for Batu Pahat river Ogos 2009
basin, Johor. Final Report. Volume 2. Main Report.
MAKLUMAT RANCANGAN STRUKTUR & TEMPATAN
7 Tajul, Ho & Ng Consultants Sdn. Flood mitigation master plan for Batu Pahat Ogos 2009
Bhd. river basin, Johor. Final Report. Volume 3.
Technical Report I.
8 Tajul, Ho & Ng Consultants Sdn. Flood mitigation master plan for Batu Pahat Ogos 2009
Bhd. river basin, Johor. Final Report. Volume 4.
Technical Report II.
9 Tajul, Ho & Ng Consultants Sdn. Flood mitigation master plan for Batu Pahat Ogos 2009
Bhd. river basin, Johor. Final Report. Volume 5.
Appendices.
10 Tajul, Ho & Ng Consultants Sdn. Flood mitigation master plan for Batu Pahat Ogos 2009
Bhd. river basin, Johor. Final Report. Volume 6. GIS
and preliminary engineering drawings.
11 Lee&Ooi Perunding Sdn. Bhd. Kajian pelan induk saliran Bandar Yong Peng November 2005
Negeri Johor Darul Takzim. Final Report.
Executive Summary. Volume 1.
MAKLUMAT RANCANGAN STRUKTUR & TEMPATAN
12 Lee&Ooi Perunding Sdn. Bhd. Kajian pelan induk saliran Bandar Yong Peng November 2005
Negeri Johor Darul Takzim. Final Report. Main
Report. Volume 2.
13 HYDEC Engineering Sdn. Bhd. The study and investigation on the siltation of Ogos 2004
gated drainage outlet channels in the western
Johore agriculture development project.
Inception Report.
14 A.I. & Associates Drainage master plan for Bnadar Penggaram, Disember 1997
Johor Darul Takzim. Volume 3 : Alignment &
longitudinal plans of proposed improvement.
15 A.I & Associates Drainage master plan for Bandar Penggaram, Jun 1997
Johor Darul takzim. Volume I : Main Report.
16 Sepakat Setia Perunding Sdn. Bhd Batu Pahat river basin flood mitigation and Oktober 1985
dengan kerjasama Snowy Mountains intergrated agricultural development study
Engineering Corporation dan Planmac (Western Johore Integratetd Agricultural
Management Services Sdn. Bhd Development Project Phase II). Phase II - Final
Report Volume 7. Annexes (Agriculture)
MAKLUMAT KERJA UKUR
BIL NAMA JURUUKUR TAJUK KERJA TAHUN
Warta
Bil. Perkara Pengambilan Pelan No. JPTP. P.H.T. No.
No. Tarikh
1 Pusat Kemajuan Peladang Peserai 3/A/103 BP : 31/79 3 03/01/1980
2 Pusat Kemajuan Peladang Sg. Balang 3/A/101A PTM : 30/79 482 22/05/1980
3 Pusat Kemajuan Tg. Laboh 3/A/102A BP : 30/79 114 31/01/1980
4 Pusat Kemajuan Pt. Raja 3/A/104 BP : 41/79 163 28/02/1980
5 Pusat Kemajuan Tongkang Pechah 3/A/105 BP : 42/79 116 31/01/1980
6 Pusat Kemajuan Parit Sulong 3/A/106A BP : 40/79 227 13/03/1980
7 Workshop R.J.B. Batu Pahat 2/A/1041 BP : 58/79 308 13/03/1980
8 Access Road Sg. Sembrong Dam 3/A/107B BP : 34/80 633 03/07/1980
9 Kawasan Tadahan Empangan Sg. Sembrong 3/A/110A BP : 17/80 1057 06/11/1980
10 Jalan Masuk Empangan Bekok 3/A/114 BP : 11/81 22 23/12/1985
11 Empangan Bekok 3/A/117,118,119 BP : 16/85 592 22/05/1986
12 Sungai Simpang Kiri 3/A/120 - 125 BP : 33/86 612 23/04/1987
13 Sungai Simpang Kanan 3/A/126,127,128 BP : 34/86 348 12/03/1987
14 Pusat Kemajuan Parit Raja 3/A/122 BP : 30/86 610 23/04/1987
15 Sungai Sembrong 3/A/136,137,138 BP : 26/87 1995 31/12/1987
16 Sungai Bekok (Lower) 3/A/132 BP : 52/86 862 07/07/1988
17 Sungai Bekok (Upper) 3/A/132 -135 BP : 21/87 864 07/07/1988
18 Jambatan 3/A/139 BP : 41/87 935 21/07/1988
MAKLUMAT PEWARTAAN SUNGAI /BANGUNAN/INFRASTRUKTUR
SUB LEMBANGAN
SUB LEMBANGAN
SUNGAI SIMPANG KIRI
SUNGAI BEKOK
SUB LEMBANGAN
SUNGAI SEMBRONG
3 Sungai 152 km
4 Parit 1,900 km
6 Benteng Laut 73 km
2 JURUTERA (J41) 1
JUMLAH 26
JURUTERA DAERAH
Sukemi Bin Hj Sidek
JURUTERA
Cik Juliana Bt Abdullah
PENOLONG
PENOLONG PENOLONG PENOLONG
JURUTERA
JURUTERA JURUTERA JURUTERA
Cik Farah Nabilah bt
Hj Jamain b Bahari Hjh Selamah Bt Yamin Hjh Saleha bt Bachok
Zulkifli