You are on page 1of 12

Final Assignment

Presentation

“Squeeze Cement To
Eliminate Water Zone

Carmellius Petrus Depa-1401314


STT Migas Balikpapan

CONFIDENTIAL AND PROPRIETARY


Any use of this material without specific permission of Pertamina is strictly prohibited
Outline

1 Background

2 Objective
Basic
Theory
3
Analysis Case &
4 Calculation

5 Conclusion
Background

01. Challenge 03. Innovation

Oil and Gas Industry is Innovation should be taken


faced with an increasingly in place to aiming for better
difficult challenge, the performances and efficient
found the right solution to optimization.
every problem production

02.
Investments 04. Optimization
High investments and a very
One of the significant
much-needed strong focus on
optimization is on the well
safety
architecture aspect.
Objective

1. To investigate why
squeeze cement are doing in
this well

2. Calculate cement
composition

3. To ensure the cement at well


can hold pressure formation .
Basic Theory

Squeeze Cementing : The functions of


Secondary
cementing :
Squeeze cementing adalah
penyemenan ulang yang
• Formation loss
dilakukan sebagai salah satu
langkah perawatan sumur, • repair improper
dengan cara menempatkan zone isolation
cement slurry dengan volume • Eliminate Intrusion
yang relative sedikit di posisi of unwanted fluids
yang diinginkan, salah satunya • repair casing leaks
untuk meutup zone perfrasi. • abandon non
productive or
depleted zones
Case
Production Before Squeeze Cementing
1200 0.14

0.12
1000

0.1
Daily Gross, Oil & Water (BPD)

800

Daily Gas (MMSCF)


0.08

600
OIL
0.06 WATER
GAS
400
0.04

200
0.02

0 0

Date
Well Architecture

Existing Well Design C-23


Geology

TVD

CP @ 2460
ft
Analysis & Calculation
Conclusion

1. The Well Architecture has been designed safely

2. Kick Tolerance for 8-1/2” hole size is 51.73 bbl (> 25 bbl)

3. Casing Depth for Casing 9-5/8”, 47 ppf, L-80 at 2,437 ft and Dual
Tubing 3-1/2”, 9.2 ppf N-80 at 8275 ft

4. Burst, Collapse, Tension and Biaxial Casing are greater than


Design Load

5. Cost saving is 169,885.56 USD (casing only)


Back Up Slide