The document discusses the process of laying out and staking a building site, which involves establishing the perimeter outlines and foundation plan measurements on the ground. This is done by driving stakes into the ground and attaching horizontal batter boards to serve as a reference plane. A level transit instrument is used to transfer points and establish boundaries, while plastic hoses filled with water and strings or cords connect points to lay out horizontal lines.
The document discusses the process of laying out and staking a building site, which involves establishing the perimeter outlines and foundation plan measurements on the ground. This is done by driving stakes into the ground and attaching horizontal batter boards to serve as a reference plane. A level transit instrument is used to transfer points and establish boundaries, while plastic hoses filled with water and strings or cords connect points to lay out horizontal lines.
The document discusses the process of laying out and staking a building site, which involves establishing the perimeter outlines and foundation plan measurements on the ground. This is done by driving stakes into the ground and attaching horizontal batter boards to serve as a reference plane. A level transit instrument is used to transfer points and establish boundaries, while plastic hoses filled with water and strings or cords connect points to lay out horizontal lines.
• The process of establishing the point of building outlines or perimeters on the ground or site where the building is to be constructed.
• The process of transferring the measurement of
building foundation plan to the ground or site of construction. stake Are wooden sticks used as posts sharpened at one end and driven into the ground to serve as boundaries or support of the horizontal batter boards. Batter boards Are wood stick nailed horizontally to the stake to serves as the horizontal plane where the building technical measurements are established. Normally, batter boards are installed horizontally to an elevation parallel with the ground floor line. Level transit Is the instrument used in relocating and establishing all reference point, lines and boundaries of construction of instruction. Plastic water hose Is a transparent plastic tube having a diameter of ¼ to ½” filled with water used to establish horizontal lines. This is a simple but accurate instrument conveniently used in establishing horizontal planes. String or chord Is any medium of materials such as steel, wire, cotton, plastic of nylon chord used in connecting established points or lines in the batter board.