Maximizing NAR TSR

Pre and Co-processing concept


(Proposal)

HIL / CE
© Holcim Group Support Ltd 2011
HIL TSR Journey 2006 – 2012 and Aspiration

Target 2016 :
TSR NAR-1 : 24.13%
Actual Projection TSR NAR-2 : 19.81%
TSR CIL-2 : 7.35%
Actual 2011 TSR HIL : 16.12%
TSR NAR-1 : 10.7%
TSR NAR-2 : 9.4%
TSR CIL-2 : 1.4%
TSR HIL : 7.0 %

Geocycle Asia Network Meeting, Singapore, 29 Feb 2008 © 2012 Legal entity 2
Way forward : 2012 to 2016 HIL Journey planned

© 2012 Legal entity 3


Summary Capex Finplan Road Map 2012 – 2016
Related with Increasing Waste Utilization in Kiln

© 2012 Legal entity


AFR Preparation – Waste and AFR
Solid
Solid
ISW
Coarse ILC fuel
NAR-1
Consumer
Products

Incoming waste/AFR
Fine solid SLC

Ready to burn AFR


fuel NAR-2
Sorted Plastic
Waste from
MSW
ILC fuel NAR-2
(ISD)
Sludge
KI fuel NAR-2
(Non CV AF)
low viscosity Oil sludge
sludge Liquid waste

- Oil sludge Pumpable


Pasty & - Paint sludge sludge
Solid sludge - Other sludge

- Drilling cuttings
KI fuel NAR-2
- Contaminated Soil
AR with - WWT Sludge
Organic - Foundry Sand
- Fly ash 5
© Holcim Group Support Ltd 2011 26.09.2011/SCE
AFR Preparation Sites – Basic Concept
Solid

ISW
Solid
Shredding line
Consumer phase 3 Coarse ILC fuel
Products NAR-1

Sorted Plastic
Waste from Fine solid SLC
MSW fuel NAR-2

Sludge ILC fuel NAR-2


(ISD)

low viscosity Oil sludge KI fuel NAR-2


sludge Liquid waste (Non CV AF)

- Oil sludge Sludge platform


Pasty & - Paint sludge
Solid sludge - Other sludge Pumpable
sludge
- Drilling cuttings
- Contaminated Soil
AR with - WWT Sludge
Organic - Foundry Sand KI fuel NAR-2
- Fly ash 6
© Holcim Group Support Ltd 2011 26.09.2011/SCE
AFR Feeding installations – Basic Concept
NAR-1
Solid

Coarse ILC fuel


NAR-1
Shredding line Coarse ILC fuel
phase 3 feeding
Fine Solid SLC
Fuel NAR-2

ILC fuel NAR-2 Fine SLC Fuel


(ISD) Feeding

KI fuel NAR-2
NAR-2
(non CV AF)

ILC / Kiln Inlet


Feeding
Sludge platform Pumpable
sludge
Putzmeister
Pump
KI fuel NAR-2

7
© Holcim Group Support Ltd 2011 26.09.2011/SCE
Platform Capacity
• Solid preparation plant: 135’000 t/a
• Sludge preparation plant: 25’000 t/a (Sludge 18’000 t/a
and AR with Organic 7’000 t/a)
• Total Capacity : 160’000 t/a

8
© Holcim Group Support Ltd 2011 AFR Turntable India 2011 04.08.2011/MAI
Location
(proposal)

Solid & Sludge AFR Platform

9
© Holcim Group Support Ltd 2011
Proposed new location Solid and Sludge Platform

New proposed
location for
AFR platform

10
© Holcim Group Support Ltd 2011
Proposed new location Solid and Sludge Platform

New
proposed
location for
AFR
platform

Geocycle Platform IDR 129 Bio


1 Solid waste Pre-processing Facility (waste shredding, sorting, blending equipment and facilities)
2 Sludge waste Pre-processing facilities (waste preparation, sorting, blending equipment and facilities)
Utility facilities (Secure access, fire safety, waste water treatment, water catchment basin, customer center for vendor
3
audits , witness process, etc.)
4 Fully complaint with design safety criteria
11
© Holcim Group Support Ltd 2011
Solid AFR Platform

12
© Holcim Group Support Ltd 2011
New shredding line
• Phase 3: Production of ILC fuel (<150mm) for NAR1&2
and SLC fuel (<30mm) for NAR2
 67‘500t/y ISW/RDF (<150mm)
 67‘500t/y ISW/RDF (<30mm)
400k

Primary Second.
Table Screen Air SLC fuel (2D
Shredding Fe Shredding 2D
Feeder (50 mm) Classifier <30mm)
< 150mm <30mm

ILC fuel (2.5D


ILC fuel <150mm)
(<50mm)

Manual sorting of
heavy fraction

13
© Holcim Group Support Ltd 2011 Inert 26.09.2011/SCE
Flow sheet Solid AFR Platform

14
© Holcim Group Support Ltd 2011
Lay out Solid AFR Platform

SOLID AFR platform : Future:


- Walking floor Belt conveyor system
- Primary shreeder to preheater NAR 1 &
- Star Screen 2
- Magnetic separator
- Air classifier
- Secondary shreeder
- Conveyor systems

15
© Holcim Group Support Ltd 2011
Lay out Solid AFR Platform

Product size <30mm

Star screen

Primary shreeder
Air Classifier
Secondary shreeder

Product size 30 – 150 mm

Walking floor Feeder

16
© Holcim Group Support Ltd 2011
Solid AFR Platform – Basic Design

Basic design :
 Roofed Storage cap. for receiving material 525 t
 Dimension 60x25x4, eff storage 60%  3500 m2
 Est. BD : 0.15 t/m3

 Main equipment
 Walking floor feeder
 Primary shredder (Max capacity 30 tph)
 Star Screen
 Magnetic separator
 Air classifier
 Secondary shredder (Max Cap 15 tph)
 Conveyor systems
 Facilities :
 Water pond for fire suppression : 1000 m3
 Water pond for rain polluted water (roofed): 300 m3
 AFR Office
 Access concrete road (wide 10 m)
17
© Holcim Group Support Ltd 2011
Sludge AFR Platform

18
© Holcim Group Support Ltd 2011
Flow sheet Sludge AFR Platform

Sludge Platform
74x38 = 2812m2

19
© Holcim Group Support Ltd 2011
Basic design Sludge AFR Platform

Storage capacity :
• Total est receiving 17.875 t/y
• Receiving area 2430 m2 (450 t)
• Total drum 900 (180t); jumbo bag 270
(270t)
• Stock capacity 7 day operation

Production capacity :
• Max production 2.5 tph (60 tpd)

Handling material :
Static crane Jonsered
Mixer
Sludge Pump (existing)
Shreeder (M&J 1000)

20
© Holcim Group Support Ltd 2011
Lay out Sludge AFR Platform

Mixer

Existing
Sluge pump

Shreeder

21
© Holcim Group Support Ltd 2011
2013
Sludge platform
• Operating principle of the sludge platform: Production of
pumpable sludge
Hydraulic arm for
Four unloading pits for material handling
low viscosity sludge
and pasty material in
drums, jumbo bags Collection pit or
and bulk container for solids

Mixing pit (no screen)

Movable shredder for Shredding of screen rejects


opening of bags, until size is ok for concrete
mixer -> impregnation ->
drums, containers etc. contam. soil or RDF feeding
(M&J 1000-6)

Post shredding pit (no Piston pump with


screen) tiltable screen
(50mm)
22
Ready to pump pit
(100mm screen)
© Holcim Group Support Ltd 2011
2013
Sludge platform
• Operating principle of the sludge platform: Production of
contaminated soil
Feedhopper and
belt weight feeder
in PH tower

Contaminated
soil
Material transport
into PH tower by
contruction elevator
Pasty material

Double shaft batch


Storage and packing of
concrete mixer for
impregnated material in
impregnation of
the neighbouring building
pasty material
23
© Holcim Group Support Ltd 2011
End of Slides

24
© Holcim Group Support Ltd 2011 AFR Turntable India 2011 04.08.2011/MAI
Roadmap – NAR-2
2013

• Improvement of
existing solid feeding
installation at NAR-2
for contaminated soil
feeding
• Mixing of cont. soil
and pasty/solid oil
sludge by loader

Sludge
TSR (sludge): <2%
2013

Total sludge to NAR-2:


41t/d

25
© Holcim Group Support Ltd 2011
2013
AFR feeding NAR-2
• As light (RDF) and heavy (solid sludge & contaminated
soil) material shall be dosed with the same system, it is
suggested to install a belt weigh feeder which contorls
the speed of the extractor.
• The density of the two materials differ by factor 10. This
cannot be handled with the same belt weigh feeder.
• Design of extraction hopper and belt weigh feeder shall
be for RDF.
• In case of feeding of heavy material, only one extraction
screw shall be running and the signal of the belt weigh
feeder shall be ignored (only volumetric dosing as feed
rate is small).
26
© Holcim Group Support Ltd 2011
2013
AFR feeding NAR-2
• Flowsheet

27
© Holcim Group Support Ltd 2011
2013
AFR feeding NAR-2 – Screw Extraction Hopper
• Double screw extration hopper design
„Funnel“ to
facilitate jumbo Length of hopper:
bag emptying 4000mm
Height of hopper:
2000mm
Pitch of screw at Pitch of screw at Pitch of screw at
beginning of hopper: end of hopper: after hopper:
200mm (cont. 300mm 350mm (avoid
increasing) blockages)

Width of hopper:
1000mm

Shaft diameter: Outer screw diameter:


2 x 300mm 2 x 500mm
28
© Holcim Group Support Ltd 2011
2013
AFR feeding NAR-2 - Screw Extraction Hopper
• Capacity estimation for one extraction screw (RDF)

29
© Holcim Group Support Ltd 2011
2013
AFR feeding NAR-2 - Screw Extraction Hopper
• Capacity estimation for one extraction screw (CS)

30
© Holcim Group Support Ltd 2011
2013
AFR feeding NAR-2 - Screw Extraction Hopper
• Feeding capacities and buffer time estimation
 Light Material (0.1t/m3, both screws running): 0.3 – 1.8t/h
 Buffer time in case of 1.8t/h RDF: 20min*
 Heavy Material (1.2t/m3, one screw running): 1.8 – 11t/h

• If heavy material is fed, the 1.8t/h is still well below the


max. recommended coarse ash input of 2% based on
clinker.
• For transportation of light and heavy material to the PH
tower of NAR-2, the hoist currently used at NAR-1 shall
be moved to NAR-2 as soon as the construction
elevator is installed at NAR-1.
*Hopper volume 8m3, usable 75% -> 0.6t, density 0.1t/m3
31
© Holcim Group Support Ltd 2011