ADEQUACY

EVALUATION OF WIND
POWER GENERATION
SYSTEMS
GUIDED BY : DR. R. EDWIN RAJ
TEAM : ASHISH ASSISI.W (601429)
DAIN DANIEL (601435)
ASHWIN M (601430)
FERIN RAJ (601444)
WORK DONE
(POWER OUTPUT OF A WIND TURBINE)

Formulas Where,
• 𝑉𝐼 - 3m/s
Used • 𝑉𝑅 - 10m/s
• 𝑉𝐼 - Is the cut-in speed • 𝑉𝑂 - 25m/s
• 𝑉𝑅 - Is the rated speed
• Generally, the cut-in
• 𝑉𝑂 - is the cut-out speed
speed of the a wind
turbine is in the range
of 2.5-3.5 m/s and cut-
out speed in the range
of 20-25 m/s.
CONT..

• (𝐴 + 𝐵𝑉 + 𝐶𝑉 2 ) 𝑃𝑅
• The constant A, B and C are found out using the following
equations:
ADEQUACY EVALUATION OF
WIND FARMS (ANALYSIS)

Month Of January
120000

100000

80000
Power(W)

60000

40000 Series1

20000

0
0 5 10 15 20 25
Hours
Month Of March
Month Of February 120000
120000
100000
100000

Power (W)
80000
Power(W)

80000
60000
60000
40000 40000 Series1
Series1
20000 20000
0 0
0 5 10 15 20 25 0 5 10 15 20 25
Hours Hours

150000
Month of April Month Of May
150000
Power (w)

100000

Power (W)
100000
S…
50000 50000
Series1
0
-50000 0 5 10 15 20 25
0 Hours
0 5 10 Hours 15 20 25
Month Of August
Month Of July 200000
250000
200000
Power(W)

150000
150000 Power (W)
100000 100000
50000 Series1 50000 Series1
0
0 5 10 15 20 25 0
0 5 10 15 20 25
Hours
Hours
• We use 250 kw wind turbine for calculation,
• The wind speed is taken from our college weather station,
and demand details (required) is taken from the college
transformer.