PROJECT DEVELOPMENT

SOLAR PHOTOVOLTAICS
POWER PLANT

Project Summary
2019

1
PROJECT PROFILE

Project Tittle : Solar power plant 14.7 MW

Produck/Service : Power/Electricity

Location : Central Java Province & East Jawa Province

Project system : On-Grid (Nett Mettering / Export-Import)

Project description : Development, EPC, Investment, Operation


and Maintenance, and supply electricity.

Business Scheme :
1. Supply and sell power/electricity per kWh
for 20 years (Power purchasing agreement -
PPA)
2. Excess power can export to grid (PLN) as
much as PLN selling price to costumers.
PACKAGE OF PROJECT FISRT PHASE
LOCATION
NO COMPANY NAME PROJECT CAPACITY (Kw) DESCRIPTION
CITY PROVINCE Lattitude Longitude

Factory plastic woven


1 PT. Dasaplast Nusantara 1.500 Jepara Central Java -6.690.622 110.707.056 ON-GRID (Rooftop Installment)
bag & Warring

2 PT. Delta Surya Textile Textile Factory 2.100 Pekalongan Central Java -6.889.465 109.693251 ON-GRID (Rooftop Installment)

3 PT. Delta Surya Textile Textile Factory 2.100 Pasuruan East Java -780.862 112.732.237 ON-GRID (Rooftop Installment)

4 PT. Sumber Yala Samudra Sardines Factory 500 Banyuwangi East Java -8.441.241 114.340.971 ON-GRID (Rooftop Installment)

5 PT. Sumber Yala Samudra Sardines Factory 1.500 Denpasar Bali -8.326.353 114.546.149 ON-GRID (Rooftop Installment)

6 PT. Admira Wood Factory 1.000 Trenggalek East Java -8.050.551 111.642.008 ON-GRID (Rooftop Installment)

7 PT. Pandatex Garment Factory 3.000 Magelang Central Java -754.102 110.166.653 ON-GRID (Rooftop Installment)

8 PT. Meshindo Alloy Wheel Metal Factory 3.000 Surabaya east Java -7.245.567 112.675.889 ON-GRID (Rooftop Installment)

Total Capacity 14.700

*Base on average load peak on each location


Project Status
- Project progress
1. Signed memorandum of undertanding
2. Agreed for selling price with costumers
3. On process to pre contract and preperation to do study

- EPC
Find the best manufacturer of solar panel system and EPC to support
the implementation of the project (complete system).

- Financing
- Find the best financing partner of solar panel system.
LEGAL PERMIT

Permit to do construction of solar power plant


after signing contract/PPA

1. Principle permit by the regional government

2. Environmental permit by the regional government

3. Interconnection permit (for nett mettering system export

import.
PACKAGE OF PROJECT SECOND PHASE
EXISTING LOCATION LONGITUDE
NO COMPANY NAME PROJECT DESCRIPTION
CAPACITY (Kw) CITY PROVINCE Lattitude Longitude
OFF-GRID (Landing Installment)
1 PT. Kapuas Prima Coal Smelter 7.500 Pangkalan Bun Central Kalimantan -2.637.789 111.800.658
Existing Generator Diesel)

2 PT. Unilever Indonesia. Tbk Skin care Factory 1000 Cikarang West Java -6.270.644 107.141.154 ON-GRID (Rooftop Installment)

3 PT. Unilever Indonesia. Tbk Consumer good Factory 1000 Cikarang West Java -6.290.763 107.146052 ON-GRID (Rooftop Installment)

4 PT. Unilever Indonesia. Tbk HPC Factory 1000 Cikarang West Java -6.291.349 107.128.993 ON-GRID (Rooftop Installment)

5 PT. Unilever Indonesia. Tbk Walls Ice cream Factory 1000 Cikarang West Java -6.292.149 107.133.224 ON-GRID (Rooftop Installment)

6 PT. Unilever Indonesia. Tbk Savory Factory (Siliwangi) 1000 Cikarang West Java -6.282.251 107.130.851 ON-GRID (Rooftop Installment)

Trans Theme Park (Shoping


7 CT Corp 8000 Bandung West Java -6.924.923 107.636.701 ON-GRID (Rooftop Installment)
Mall)
Trans Theme Park (Shoping
8 CT Corp 8000 Makasar South Sulawesi -5.160.349 119.394.261 ON-GRID (Rooftop Installment)
Mall)
Trans Theme Park (Shoping
9 CT Corp 8000 Cibubur West Java -637.555 106.902.705 ON-GRID (Rooftop Installment)
Mall)
Trans Theme Park (Shoping
10 CT Corp 8000 Denpasar Bali -8.702.528 115.184.857 ON-GRID (Rooftop Installment)
Mall)

TOTAL CAPACITY 44.500

*Base on average load peak on each location