● LINE LENGTHS :
JAKARTA KOTA-BOGOR = 54,8 KM
TANAHABANG-RANGKASBITUNG = 72,8 KM
● NETWORK LENGTHS :
JAKARTA KOTA-BOGOR +
MANGGARAI-BEKASI +
MANGGARAI-JATINEGARA
● HEADWAY NORMAL : 10
MENIT
DI LUAR WAKTU DI ATAS
BASIC OPERATING ELEMENTS
CAPACITY, WORK, AND UTILIZATION
● VEHICLE CAPACITY :
KAPASITAS DUDUK = 60 ORANG
KAPASITAS MAKSIMUM = 300 ORANG
KAPASITAS MAKSIMUM RANGKAIAN =
1800 PENUMPANG
● LINE CAPACITY
maximum number of spaces that can
be transported past a fixed point in one
direction during one hour (UNITS/HR)
BASIC OPERATING ELEMENTS
CAPACITY, WORK, AND UTILIZATION
● VEHICLE CAPACITY :
KAPASITAS DUDUK = 60 ORANG
KAPASITAS MAKSIMUM = 250-300
ORANG
KAPASITAS MAKSIMUM RANGKAIAN =
2500-3000 PENUMPANG
● LINE CAPACITY
maximum number of spaces that can
be transported past a fixed point in one
direction during one hour (UNITS/HR)
BASIC OPERATING ELEMENTS
TRAVEL TIMES