BY-SAWAN UPADHYAY
16JE001907
th
ELECTRICAL ENGINEERING 7 SEM
ACKNOWLEDGMENT
The flash point(min) and pour point(max) are 140 c to -6 c respectively. The
dielectric strength of new untreated oil is MV/m (RMS)and after treatment it
should be>24 MV/m (RMS)
Testing and oil quality
Transformer oils are subjects to electrical and mechanical stresses while a transformer is
in operation. In addition there is contamination caused by chemical interaction with
windings and other solid insulation, catalysed by high operating temp. As a result the
original chemical properties of transformer oil change gradually, rendering it ineffective
for its intended purpose after many years. Hence this oil has to be periodically tested to
ascertain its basic electrical properties,
These tests can be divided into
1. Dissolved gas analysis
2. Furan analysis
3. PCB analysis
4. General electrical and physical tests:-
colour and appearance
Breakdown Voltage
Water content
TRACTION
The loco uses a Pantograph, to make contact with the overheat contact
cable and draw electricity from it to power its motors.
The return path for the electricity is through the body of
the loco and the wheels to the tracks, which are electrically
grounded.
TRACTION MOTOR
The motor is run at 1500 rpm, if running is smooth the motor is run for 30 min.
The rotation of the motor is changed and run at 1500 rpm for another 30 min.
Steady state temp rise, should motor exceed 35 degree centi.
The speed is increased to 2000 rpm and run up to 15min.
The speed is increased to about 2725 rpm.
Temp rise in the zone should not exceed 50 to 60 degree centi.
APPARATUSUSED
PANTOGRAPH
MAIN TRANSFORMER
RECTIFIER
REVERSER
CLR
WINDING CHANGE-OVER SWITCH
BATTERY & BATTERY CHARGER
PROTECTION CIRCUIT AND RELAY
SWITCH GROUP 1& 2
DISC JUNCTION
CURRENT MAIN TRANSFORMER
PANTOGRAPH
TRANSFORMER
TAP CHANGER
SMOOTHING RECTIFIER
REACTOR
ADDITIONAL
SMOOTHING REVERSER MOTOR
REACTOR
BLOCK DIAGRAM