CONTENTS
1. Company Profile
2. Processes in Plant
3. Water Treatment Plant
4. Boiler System
5. Turbine section
6. Coal system
7. Bagasse system
8. Control Room
9. Safety
10.Conclusion
1. COMPANY PROFILE
Company Establishment Year – 2008
Company Product – 44 MW electricity generated from
steam.
Company Customers –
1. Sugar factory
2. Refinery
3. Distillery
4. MSEB
2. PROCESSES IN PLANT
Water Treatment System
Boiler Section
Turbine Section
Coal Feeding System
Bagasse Feeding system
3. Water Treatment System
Raw Water Tank-
Quantity: 2.
Capacity: 1. 11000 m3
2. 9000 m3
Feed Water Pump-
Flow rate: 362 m3/hr
Clarifier-
Chemical Dosing-
1. Hypo (NaOCL)
2. Feric (FeCL3)
3. Poly
Clarifier Water Storage Tank-
Capacity: 400 m3
•Filtration System-
1. MGF ( Multi Grade Filter)
2. Basket Filter
3. Ultra Filter
•Chemical Dosing-
1. NaOH
2. Hypo
3. HCL
•UFWS Tank-
Capacity: 156 m3
•Cartridge Filter
•RO Filter
•Degasser Water Storage Tank-
Capacity: 100 m3
•Dosing Tank-
1. SAC Tank
2. SBA Tank
3. MB Tank
•Morpholene Dosing
•DMS Tank-
1. 600 m3 2. 200 m3 (Make Up Tank)
4. Boiler System
De- aerator Tank
Boiler Feed Pump-
There are 3 feed pumps which are used
To supply Water to minimum Circulation
of water to avoid any damage to the pump
Boiler-
Intended Working Pressure: 127 kg/cm3
Hydraulic Test Pressure: 190 kg/cm3
Boiler Furnace Temperature: 880˚C
Steam Outlet Temprature: 540 ˚C
Heating surface of boiler: 1230 Sq-m
Furnace: 1606 Sq-m
HP heater
• Economizer
• Convection
• Furnace-
Type: Travelling Grade Furnace
Max Pressure: 98 bar
Motor: 5 HP
• Fans-
1. Induced Draft
2. Forced Draft
3. Cylinder Recovery Fan
• Compressor-
1. Service Air Compressor
2. Instrument Air Compressor
5. Turbine Section
Turbine-
Type: Impulse Reaction Turbine
Nominal Output : 44MW
Speed: 3909 rpm
Generator: 1500 rpm
Compounding of Turbine
1. 1st Extraction pressure: 21 Kg/cm2
2. 1st Extraction pressure: 14 Kg/cm2
3.1st Extraction pressure: 3 Kg/cm2
Governor-
1. High Pressure Governor
2. Low Pressure Governor
Gear Box-`
Speed Reduction Gear Box
• Condenser:
1. Consist 10200 tubes
2.Used to condense Steam leaving from turbine
• Hot Well:
1.Used to Supply Hot Water to DM Surge Tank
• Ejector:
1.Uesd to create Vaccum in turbine
• Cooling tower
1.Drift Element: Temprature reduction from 40 ˚C to32 ˚C
2.Fins :Temprature reduction from 32 ˚C to 8 ˚C
6. Coal System
Every boiler furnace there is a 4 coal bunkers, 4 coal screw feeders, 4 coal
sprayers.
Generally 5-10mm size of coal is used. Larger than 10mm size crushed in
crusher & then feed in belt.These size coals are easily sprayed.
7. Bagasse System