Qa =20000 BPD
D , 3 mill
?
Qd = 8000 BPD
Kapasitas pipa bc (baru) = 20000 + 8000 = 28000 BPD
141,5
0 x 62,4 = 51,4845 Lb /cuft
131,5 40
L = 4 x 5280 = 21120 ft
2 f L v2
PfBC =
gD
= 2 x 0,0074 x 21120 x 5,21512 x 51,4845
= 20387,8337 Lb/sec-ft
32,2 x 0,6667
Pipa AB, kapasitas pipa = 20000 BPD
D = 6/12 = 0,5 ft
Q1
v = 86400 x 0,785 x D 2 = 20000 x 5,615
86400 x 0,785 x (0,5) 2
= 6,623 ft/sec
Dvf 0,5 x 6,6230 x 51,4845
NRE = = = 16913,7819
0,01008
0,04 0,04
f= (N RE ) 0.172 = (16913,7819) 0,172
= 0,0075
PfAB = 2 f L v
2 2
= 2 x 0,0075 x 31680 x 6,6230 x 51,4845
gD 32,2 x 0,5
8000 x 5,615
Kapasitas pipa BD= Q1
86400
= 0,5199 cuft/sec
0 , 4106
PB D g 1,5
0,5 2 Q1
2,1506 L
NRE = 2,5
NRE = 12839.8030
Q
NRE = 0,785 D
Q
D= 0,785 N RE
0,5199 x 51,4845
D=
0,785 x 12839,8030 x 0,01008
D = 0,2635 = 3,162 in