You are on page 1of 17

Introduction to

Wireline

Schlumberger Private
Schlumberger Private
2
Phases of the Life of a Reservoir

Schlumberger Private
Exploration
Seismic & Development Production Abandonment
Appraisal

Wireline

Evaluation Well Test


Production
Monitoring / Enhancement
Brief History
 1912: Conrad Conceives the Idea of Electrical
Measurements

 1926: Société de Prospection Électrique

 1927: First log in Pechelbronn - France

Schlumberger Private
 1934: SWS is Founded in Houston (122 Eng.)

 1956: SLB Limited is Created


• 30’s Core Sample Takers
• 40’s SP, Improved Resistivity, Dipmeters
• 50’s Induction, Sonic,Fluid Samplers
 60’s: nuclear Meas (neutron, density)
 1977: Cyber Service Unit (CSU)
 1989: MAXIS Imaging System
 1990’s: Platform Express, CMR, DSI, MDT, OBMI

5
Pechelbronn-Alsace, 1927
Henri Doll, in a 500-meter deep well in the
Pechelbronn field (Alsace), recorded, point
by point, meter by meter, the first "electric
log," in the history of the petroleum industry.
The resistivity recordings proved to be

Schlumberger Private
perfectly repeatable in neighboring wells,
enabling precise correlation of formations
across an entire field.

6
Schlumberger Private
7
Historical SLB
Wireline in the 1930’s

Schlumberger Private
8
Logging Unit – Today
Schlumberger

Schlumberger

Schlumberger

Schlumberger

Schlumberger Private
MAXIS

9
View of a Logging Unit
Wireline Engineer Acquisition Equipment
Company Man
Unit Engine

Schlumberger Private
Winchman
Cable drum
Wireline cable to
downhole tools
Cable Drum
Depth and Tension

Schlumberger Private
Acquisition System

Logging Tool
CSU - Cyber Service Unit

Logging Cable
11
Acquisition System
Outside Logging Unit
DEPTH - IDW
TOOLS
Logging Cable TENSION - CMTD

Schlumberger Private
Inside Logging Unit
PROCESSOR WFMD
INTERFACE
WFAD
& DISPLAY
LOG
Tool Power
PRINTER

WFDD
Depth/Tension DISPLAY

12
Schlumberger Private
13
Wireline Set up
Wireline Log

Schlumberger Private
Linear Display Logarithmic

14
Wellsite Crews
Evaluation Services (Open Hole) Crew

• Engineer (1 or 2): organize/control/supervise-client interface-follow up and


reporting

Schlumberger Private
• Operator (1, 2 or more): assistance-operate truck/winch-mechanical
maintenance

• Specialists as required: special services-MDT, borehole seismic, borehole


coring

Production Services (Cased Hole) Crew

• Engineer or Technician

• Operator (1 , 2 or more)

15
Wireline Today
InterACT / RTO

Schlumberger Private
Pau

Balikpapan
A MAXIS service allowing real time transmission of logging data
from the wellsite to be viewed at the customers’ office PC.

16
Schlumberger Today
Intouchsupport.com
• What does it do?
– Leverages the knowledge of technology centers to directly support operations

Schlumberger Private
• Why?
– Increases efficiency by removing “clutter” between technology centers and the field
– Gives Schlumberger competitive edge in the support and deployment of technology
with user-friendly IT tools
– Creates a centralized knowledge-based organization

17
Formation Evaluation Domain /
Services
• PETROPHYSICAL
– Electrical : Fluid saturation Sw
– Nuclear : Porosity Ø, Lithology, Shaliness Vsh
– Acoustic: Porosity Ø, Mechanical properties

Schlumberger Private
– Magnetic Resonance: Porosity Ø, Permeability k
• GEOLOGY
– Imaging: Dips, Facies
• GEOPHYSICS
– Seismic
• RESERVOIR
– Formation Testing / Sampling: Permeability k, Physical
samples 18

You might also like