Professional Documents
Culture Documents
Presentation 10 3 05
Presentation 10 3 05
Group 7
History of Casting
Group 7
Advantages
• Complex forms, low cost
• Certain shapes cannot be
machined
• One piece parts vs. multiple
piece parts
• Design changes are easily
incorporated
• High volume, low skilled labor
• Large, heavy parts can be made
easily
Group 7
Disadvantages
• Problems with internal
porosity
• Dimensional variations due
to shrinkage
• Trapped impurities, solids
and gasses
• High-tolerance, smooth
surfaces not possible
• More costly than stamping
or extruding in some cases
Group 7
Expendable Molds
• Green Sand
• Dry Sand
• Shell
• Investment
• Plaster
Group 7
Expendable Molds
Group 7
Permanent Molds
• Die
• Centrifugal
• Pressure
• Injection
Group 7
Permanent Molds
Group 7
Cupola Furnaces
Five Zones
• Stack
• Charging Zone
• Melting Zone
• Tuyers (Air Intake)
• Crucible or Hearth
Group 7
Induction Furnaces
• Magnetic field
• Rapid melting rate
• Low pollution
Group 7
Foundries
• Pattern and Mold Making
– Computer Aided
Design
– Manufacturing
– Rapid Prototyping
• The Casting Process
– Metal Melting
– Metal Compositions
– Impurities
– Pouring into molds
Group 7
Foundries
Group 7
Foundry Automation
Group 7
Reasons For Automation
• Increased Manufacturing
Efficiency
• Reducing Costs
• Reliability in Harsh
Environments
• Release of Skilled Man
Power
• Maximize Space
• Improved Quality
Group 7
Why Fluid Flow?
Group 7
Fluidity of Metals
• Viscosity
• Surface Tension
• Inclusions
• Mold Design
• Degree of Super Heat
• Mold Material
- Thermal Conductivity
- Surface Roughness
• Heat Transfer
Group 7
Tests for Fluidity
Group 7
Heat Transfer
• Heat transfer is important
in many aspects of
casting
- Pouring
- Solidification
- Cooling rate
- Rate is a function
of Volume and
surface area
Group 7
Design, Materials and Economics
Group 7
Design Considerations in Casting
• Design of the part
• Casting process and
material
• Locate parting line
• Locate design gates
• Locate mold features
such as sprue, screens
and risers
Group 7
Design Consideration of Cast
• Corners, angles,
Parts
section thickness
– Avoid sharp corners
angles and fillets
– Stress raisers,
cracking, and tearing
– Sections should be
blended smoothly
Group 7
Design Consideration of Cast Parts
Group 7
Design Consideration of Cast Parts
• Flat Areas
– Large flat areas may
warp during cooling
– Poor surface finish from
uneven flow in pouring
– Resolve with ribs, and
serrations
• Circles and Rounds
– Lower cooling rate in
circles induces hot spots
– Shrinkage cavities and
porosity
Group 7
Design Consideration of Cast Parts
• Shrinkage
– to avoid cracking during
the cooling process
there should be
shrinkage allowance
– Staggered ribs, change
the intersection
geometry
• Patternmaker’s Shrinkage
Allowance
– 10-20 mm/m
Group 7
Design Consideration of Cast Parts
• Draft
– Used to enable easy
removal of pattern
without damage to mold
– Range from 5 to
15mm/m
– Angles of 0.5° to 2°
• Dimensional Tolerances
– As wide as possible
within limits of good
performance
– Letters and markings
Group 7
Locating the Part Line
• Part line
– separates upper and
lower mold
– Flat plane, along
corners or edges
– This will avoid flash
at the parting lines
Group 7
Locating and Designing Gates
• Gates
– Connections between
runners and the part
– Multiple gates preferred
– Feed into thick sections
of the castings
• Runners
– Distribution channel for
molten metal from the
sprue into the gates
Group 7
Casting Alloys
• Nonferrous Alloys
– Aluminum, magnesium,
copper, zinc, tin, lead
– Good electrical
conductivity and
resistant to corrosion
– Most of these alloys
share characteristics of
good machinability and
can all be welded
Group 7
Casting Alloys
• Ferrous alloys
– Cast irons
• Largest quantity of all
metals cast
• Good wear
resistance, hardness
and machinability
– Cast Steels
• Material used under
extreme heat
conditions
• Railroad, mining and
construction
Group 7
Casting Economics
• Cost
– Depends on materials,
equipment, and labor
– Preparations require raw
materials, time and effort
– Melting, pouring, heating,
cleaning, inspections
– Equipment cost lowers
with large # of castings
– Solutions to alleviate
unneeded cost are being
looked into
• Rapid prototyping
Group 7
Molten Metal Pour
Group 7
Solidification
Group 7
Solidification Temperatures
Group 7
Dimensional Change
Group 7
Pinholes
Group 7
Blowhole
Group 7
Scab
Group 7
Pinholes
Group 7
Rough Surface
Group 7
References
Group 7