• Purpose:
Backup protection to trip remaining equipment (eg. PA Fans)
0 sec – INSTANT.
• Protection Check:
Keep oil manual isolating valves in any one elevation any one corner (done by OPN), simulate
status of manual valve (done by C&I), then give sequence start command to that corner
• Purpose:
To stop fuel firing under explosive tendency of furnace
Prevent furnace structural distortion
• Protection Delay:
0 sec – INSTANT.
• Protection Check:
Simulate from protection instrument, or by actual
pressurization if agreed by Operation Head.
• Purpose:
To stop fuel firing under implosive tendency of furnace
Prevent furnace structural distortion
• Protection Delay:
0 sec – INSTANT.
• Protection Check:
Simulate from protection instrument, or by actual
depressurization if agreed by Operation Head.
• Purpose:
To prevent water carry over to superheater headers and subsequently to turbine
• Protection Delay:
10 sec.
• Protection Check:
Actual (increase feed water flow slowly until level
reaches trip limit).
• Purpose:
To prevent waterwall tubes starvation
To prevent BCW pumps starvation
• Protection Delay:
5 sec.
• Protection Check:
Actual (decrease feed water flow slowly until level
reaches trip limit).
• Purpose:
Anticipatory protection for Drum Level Very Low
To prevent economizer tubes starvation
• Protection Delay:
10 sec.
• Protection Check:
Simulate OFF contact of all BFP from BFP control panel
• Purpose:
Preventing poor furnace combustion due to low secondary air temperature
• Purpose:
Preventing damage to waterwall tubes due to insufficient cooling flow/circulation
• Purpose:
Ensuring absolute minimum required quantity of air flow even during startup
• Purpose:
Ensuring absolute minimum required quantity of air flow even during startup
• Purpose:
If 24V fails, the processors cannot execute any logic, leading to unsafe condition
• Protection Delay:
0 sec – INSTANT.
• Protection Check:
By 24V breaker simulation in MFT panel.
• Purpose:
If 220V fails, backup protection for 24V failure will be unavailable.
• Protection Delay:
2 sec.
• Protection Check:
By 220V breaker in MFT panel.
• Purpose:
This ensures that at least 2 processors are in healthy condition at any point of time
when boiler is in service.
• Purpose:
This ensures that at least 2 processors are communicating properly at any point of
time when boiler is in service.
• Protection Delay:
0 sec - INSTANT.
• Protection Check:
By actually isolating network connections of the processors.
• Purpose:
This facility allows the operation desk engineer to directly trip the boiler in case of any operational emergency eg.
Boiler Tube Leakage, Furnace excessive Clinkering, HFO oil leakage during startup, turbine related emergencies etc.
• Protection Delay:
0 sec - INSTANT.
• Protection Check:
By actually operating push buttons/through PC.
April 21, 2020 PMI Revision 00 26
POST-TRIP PURGE FANS TRIP
• Arming:
Boiler not firing fuel for 5 min (MFT may or may not be reset)
• Logic:
If furnace pressure very high > 150 mmwc OR very low < -175 mmwc (AND)
Air Flow > 30% THEN
TRIP all ID Fans and FD Fans
• Purpose:
This protection safeguards furnace against furnace pressure very high OR very low
when boiler is NOT firing.
• Protection Delay:
0 sec – INSTANT (5 min delay in arming circuit)
• Protection Check:
By simulation at source.
Mills are tripped one by one starting from top running mill, at 2 sec delay, until 4
running mills from bottom remain.
• Purpose:
This interlock achieves the fastest possible load reduction, and requires NO
intervention of desk engineer
• Protection Delay:
Varies from 1 sec to 1 min according to type of auxiliary
• Protection Check:
Simulated at initiating point.
PERMISSIVES