1.0 SCOPE
2.6 Cross section drawing of power plant showing bunker bay details with
elevation of tripper floor, width of bunker bay etc.,
2.8 Design guide for preparation of flow diagram of coal handling system
– TCE.M6-ME-563-015.
(b) Compressed air supply terminal point for air blaster system,
and bag filter cleaning with range of pressure in case
compressors for air supply are not included under Vendor’s
scope. In this clause, the total quantity of service air that will be
supplied shall be stated with a stipulation that the Vendor shall
supply two compressors (1 operating + 1 standby) in case the
demand is higher than that envisaged.
ISSUE
R2
ISSUE
R2
(g) Local controls for equipment like travelling trippers, travel drive
of shuttle feeders, plough feeders, etc
ISSUE
R2
(b) Dust concentration in the air exhausted from bag filters of dust
extraction systems shall not exceed 100 mg/N.cu.m
(f) Buildup and choking inside the transfer chutes shall not occur
(h) The belts of conveyors shall run truly in the center without any
sway
(i) Crusher shall crush and give specified throughput and of size
specified.
(l) The air flow in all the grills of ventilation system shall be
checked for its proper distribution
(p) All chutes, feeders, equipment etc shall be completely dust tight
(iii) Bid drawings like plan, flow diagram, and section drawings
(h) Weigh bridge shall be located outside the wagon tippler shed.
- Electronic load cell type with digital weight display
recorder and totalizer
(j) Type and holding capacity of wagon tippler hopper and its
details
ISSUE
R2
(o) The control of the machine shall be using PLC in auto / manual
mode.
3.4.3 Crushers:
(c) Type of drive and coupling shall be of scoop tube fluid type. It
should also be mentioned that scoop type fluid coupling should
not be used as a speed variation device. Any speed variation
required should be achieved through a belt device.
(m) For FBC boilers type of crushing system and crusher shall be
as per basic study.
3.4.4 Screens
(f) The minimum thickness of the rolls above the reference line
shall be specified and the same shall be minimum 25mm.
(d) Idler style and its minimum roll diameter for various services
(e) Idler lubrication, shaft diameter and its spacing for various
services
(g) Type and No. of belt clearances (external / internal) for each
conveyor / belt conveyor
- Two (2) Nos. of external scraper with one sprung blade type
and one torsion arm type and one(1) internal scraper of ‘V’
plough type
(n) Coupling type for high speed / low speed sides and its
requirements
(p) Belting details like belt width, duck material, cover grade, top
and bottom cover thickness, No. of plies and its breaking
strength, edge type, etc., for all conveyors / belt feeders.
(a) Type, designation and location of dust extraction (D,E) & dust
suppression (D,S) system
(l) Capacity of main water storage tank for these services and
their details
(a) All tunnel ventilation systems shall be of supply air system type
with exhaust fans and the fan capacity shall be sized based on
minimum 12 air changes per hour plus the dust extraction
system capacity (if provided in that area) from the concerned
suction points. In case no dust extraction system is provided in
the tunnel, then the minimum number of air changes per hour
shall be considered as 15 for ventilation fan capacity sizing.
(d) Wall mounted exhaust fans for various places like pent house,
access shafts, toilets, etc. shall be specified.
(a) Three bunkers of each unit (for 210MW Units) shall be provided
with one bunker ventilation system for PF boilers. For FBC
boilers, since each boiler will be provided with a bunker, each
bunker shall have a bunker ventilation system.
(b) The type of the system shall be dry type with bag filters
(c) Dust concentration in the outlet air should not exceed 100
mg/N.cu.m. at the exhaust.
(d) 12 air changes per hour of the bunker empty volume shall be
specified as minimum fan capacity
(e) Dust collected in the collecting hopper of bag filters shall be fed
back into the bunkers through rotary feeder and discharge
chute work
(b) Wagon tippler shed shall be provided with EOT crane for
maintenance of wagon tippler components and its
accessories. The standard detail of EOT crane (write up, data
sheets A,B and C) shall be furnished.
ISSUE
R2
(a) Items like sector gates, rack and pinion gates etc., shall be
listed out with their major design requirements.
4.1 For general details refer the general check list for procurement
activities for material handling system / equipment TCE.M12-ME-CL-
670-085.
4.2 The following items shall be checked specifically apart from that
indicated in the check list No.TCE.M12-ME-CL-670-085 during the
review of bids and shall be evaluated suitably.
ISSUE
R2
(d) Gallery width and height considered and tunnel cross section
along with walkway widths.
(j) Side plate angles of chutes and hoppers, Chute and skirt
board construction.
4.2.3 Capacity of fans and head for all dust extraction and ventilation systems if
furnished by Bidder. Otherwise confirmation should be obtained, that
these should be got approved during detailed engineering stage.
4.2.4 Capacity and head of pumps for dust suppression and service water /
plant cleaning system if furnished by Bidder. Otherwise confirmation
should be obtained that these will be got approved during detail
engineering.
4.2.5 List of manually operated / electrically operated hoists with capacity & lift.
Unit rates shall be obtained for addition / deletion of hoists of different
capacity and lift.
4.2.6 Adequacy of size and model and motor rating of primary and secondary
crushers and screens quoted by bidders. Drive arrangement of
ISSUE
R2
4.2.8 Stacker reclaimer machine boom length, luffing and slewing angles,
stockpile height considered, accessories as per specification
requirements, controls, etc.
4.2.10 Travelling tripper travel length and bunker feeding arrangement with cable
reeling drum. Wheel size of tripper shall also be checked.
4.2.11 Liner material and extent of lining for chutes and hoppers