NEW QC EVALUATION SYSTEM

FY 2020
QAQC DEPARTMENT
PT. SBCK AND SHIMIZU CORPORATION JAKARTA OFFICE
NEW QC EVALUATION SYSTEM FY
2020
• WHAT WE HAVE ?
Defect List Breakdown.

• POINT SYSTEM
1 STRUCTURE A C D E F
1 Foundation
1 PC Pile
1 Material stock arrangement
2 Pile verticality control (before - during driving)
3 Joint welding quality
4 Protection around driven piles
1 STRUCTURE A C D E F
1 Foundation
1 PC Pile
1 Material stock arrangement
2 Pile verticality control (before - during driving)
3 Joint welding quality
4 Protection around driven piles
POINT SYSTEM
• LEGEND
1 STRUCTURE A C D E F 1 STRUCTURE A C D E F
1 Foundation 1 Foundation
1 PC Pile 1 PC Pile
1 Material stock arrangement 1 Material stock arrangement
2 Pile verticality control (before - during driving) 2 Pile verticality control (before - during driving)
3 Joint welding quality 3 Joint welding quality
4 Protection around driven piles 4 Protection around driven piles

1. Defects those are judged by inspector’s


visual/ appearance acceptance and
1. Good sample for reference. basically it’s not so functional featured –
2. Selected defects with light items.
blue color on the defect list 2. Can be rectified without hacking/special
breakdown are meet the procedure
expectation as required. 3. All defect with no color on the defect
list breakdown.
POINT SYSTEM
• LEGEND
1 STRUCTURE A C D E F 1 STRUCTURE A C D E F
1 Foundation 1 Foundation
1 PC Pile 1 PC Pile
1 Material stock arrangement 1 Material stock arrangement
2 Pile verticality control (before - during driving) 2 Pile verticality control (before - during driving)
3 Joint welding quality 3 Joint welding quality
4 Protection around driven piles 4 Protection around driven piles

1. Defect occurance on the structure and 1. Defect occurance on the items that
temporary structure items as basic might lead to the serious complaint.
Urgent consideration to rectify
requirement or common sense. Can be immediately. Design review / design
rectified, no need to special procedure change may necessary, need special
or hacking procedure or hacking and affect small
amount of cost.
2. All selected defects highlighted with
dark green 2. As the impact of didn’t follow
/considered the requirement (No MoS,
3. All selected defects highlighted with No Ind. Meeting, insufficient Shop Drwg)
orange are not meet the basic 3. All selected defects highlighted with
requirements dark green
POINT SYSTEM
• LEGEND
1 STRUCTURE A C D E F
1 Foundation
1 PC Pile
1 Material stock arrangement
2 Pile verticality control (before - during driving)
3 Joint welding quality
4 Protection around driven piles

1. Defect occurance on the items related


Leakage, floor finishing peel off, structural
defect. Urgent consideration to rectify
immediately. Design review / design change
may necessary, need special procedure or
hacking and affect big amount of cost.
2. As the impact of lack of awareness,
supervision, worker’s skills and wrong
material selection
3. All selected defects highlighted with red are
not meet the basic requirements