INTRODUCTION

 Southern expressway extension project has been commensed and


completed to make a link between the Colombo and Mattala

International Airport, Hambanthota Harbour which became a major

part of the country’s development process

 It is looked forward to rate the expressway according to the


GREENROADS rating system considering the ESEP-S4
GREENROADS RATING SYSTEM
It is a tool for accessing the sustainable performance of the
transportation infrastructure.
This system is based on the five core areas such as,

 Water & Environment


 Materials & Resources
 Construction Activities
 Access & Livability
 Utilities & Control
GREENROADS RATING SYSTEM

 Water & Environment


No Check list item Allow.Point Y N Point
1 Env. Management System 2 √ 1
2 Runoff flow control 1-3 √ 2
3 Runoff flow quality 1-3 √ 2
4 Storm water cost analysis 1 √ 0
5 Site vegetation 1-3 √ 3
6 Habitat conservation 3 √ 2
7 Ecological Connectivity 1-3 √ 3
8 Light Pollution 3 √ 2
21 15
GREENROADS RATING SYSTEM

 Materials & Resources


No Check list item Allow.Point Y N Point
1 Life Cycle Assessment 2
2 Pavement Reuse 4-5 √ 0
3 Earthwork Balance 1 √ 1
4 Recycled Materials 1-5 √ 2
5 Regional Materials 1-5 √ 4
6 Energy Efficiency 5 √ 2
23 9
GREENROADS RATING SYSTEM

 Construction Activities
No Check list item Allow.Point Y N Point
1 Quality Management System 2 √
2 Environmental training 1 √
3 Site Recycling Plan 1 √
4 Fossil Fuel Reduction 1-2 √
5 Equipment Emission Reduction 1-2 √
6 Paving Emission Reduction 1 √
7 Water Use Tracking 2 √
8 Contractor Warrenty 3 √
13