OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

CONSTRUCTION ENVIRONMENTAL
MANAGEMENT PLAN
OAKLEAF PROPERTY GROUP LTD

PROJECT: CLAREMONT ROAD, DENTON (LW/20/0888)

Project/Contract Erection of 6 Homes (3 Semi-Detached Builds) part of Searchlight


Workshop Development LW/20/0888

Contractor details Main Contractor - Oakleaf

Site Address Searchlight Workshops, Claremont Road, Denton, Newhaven

Project Start Date ESTIMATED 1st June 2022

Expected Duration 12-18 months

Projected Completion Date May 2024 Deadline

Value of project GDV £2.4m

Name Title Signature Date

Document Author
T Stovold MR 1/3/2022

Checked by
J Willmott MR 1/3/2022

To be reviewed

1
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

TABLE OF CONTENTS

1 Description of Works ............................................................................................................................. 3


2 Contractor Details .................................................................................................................................. 3
3 Environment Policy ................................................................................................................................ 3
4 Site Specific Environmental Issues ........................................................................................................ 4
4.1 Erosion and Sediment Control ..................................................................................................... 4
4.2 Water Quality ............................................................................................................................... 5
4.3 Air Quality .................................................................................................................................... 5
4.4 Noise ............................................................................................................................................ 6
4.5 Hazardous Substances ................................................................................................................ 6
4.6 Contaminated Soil ........................................................................................................................ 7
4.7 Acid Sulfate Soil ............................................................................ Error! Bookmark not defined.
4.8 Waste Management ..................................................................................................................... 8
4.9 Flora and Fauna ........................................................................................................................... 8
4.10 Cultural Heritage .......................................................................................................................... 9

APPENDICES

A. Site Layout Plan


B. PBPL Soil Disposal Protocol 2012

2
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

1 Description of Works

This development covers 6 x Semi Detached Homes in 3 semi detached buildings. This scheme covers the 6
properties at the northerly end of the development on Claremont Road. The other part of the development is not
covered by this CEMP and remains with the original developer please contact Portway Homes.

• Please refer to site plans for location.


• The activities covered by this document are; Preparation, Demolition, Groundwork, Build,
Landscape, Sign Off
• Hired in Plant will include Excavators, Dumper Trucks, Compaction Equipment & Concrete Pump
• The primary Contactor is Target Timber Systems Ltd
• Commencement date is subject to change, estimated to be 27th April 2022
• Schedule of works as follows

Demolition Phase – April, May, June


Groundwork Phase – June, July
Build Phase – July, August, November, December, January, February, March
Landscape Phase - April
Sign off – June 2023

2 Contractor Details

Information regarding the contractors

Table 1.

Trade Company Contact Number(s) Email

Timber Frame Target Timber Gary.gooch@targettimber.co.uk


Systems LTD

Brickwork Bates Bricklayers Richard.bates@gmail.com

Groundwork Oakleaf Building tom@oakleafproperty.org.uk


Contractors

Scaffolding REEBO

Dry Lining S&L Plastering will@sandj.co.uk

3 Environment Policy

Please see attached EP

3
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

4 Site Specific Environmental Issues

4.1 Erosion and Sediment Control

Objective To manage construction activities with the potential to cause erosion and the
release of sediment

Actions Requirements Responsibility Timing


Installation of wash down OAKLEAF Prior to construction
drain at entry point commencing
Keep aggregate OAKLEAF During Works
separated and clean

Performance Indicators No mud/dirt visible on Site Manager Throughout construction


public roads due to works
construction works

Monitoring Daily visual inspections of Site Manager Throughout construction


works site and all erosion works
and sediment controls

Reporting

Corrective Actions

4
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

4.2 Water Quality

• Environmental controls (i.e., settlement ponds, rock check dams, etc)


• Re-use of stormwater on site (i.e., dust suppression)
• Activities that should consider stormwater and groundwater (i.e. refuelling, storage of hazardous
chemicals, waste, stockpiling, excavation)
• Any surface and ground water quality monitoring to be undertaken
• Sensitive receptors

Objective To appropriately manage stormwater and groundwater quality during construction


activities

Actions Requirements Responsibility Timing


Excavation of v- Site Manager Prior to construction
drains/settlement ponds commencing

Performance Indicators No untreated stormwater Site Manager Throughout construction


leaving site works

Monitoring Water quality monitoring Throughout construction


program or complaint works
based monitoring

Reporting Reporting to site manager All staff Throughout construction


and PBPL works
to Department of PBPL Throughout construction
Environment and Heritage works
Protection

4.3 Air Quality

• Dust suppression
• Stockpiles
• Truck loads
• Maintenance and operation of machinery/equipment/vehicles
• Other methods to prevent/minimise dust

Objective To manage construction activities with the potential to impact on air quality

Actions Requirements Responsibility Timing


Water carts will be used for Site Manager Throughout construction
dust suppression if needed works

Performance No complaints regarding dust Site Manager Throughout construction


Indicators from works
workers/neighbours/community
members

Monitoring As Above Site Manager Throughout construction

5
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

works

Reporting Reporting to site manager and All staff Throughout construction


PBPL works
Any reporting to Department of PBPL Throughout construction
Environment and Heritage works
Protection
Corrective Actions Corrective actions and Site Manager Throughout construction
implementation time frame works

4.4 Noise

• Noise generating activities


• Maintenance and operation of machinery/equipment/vehicles
• Work hours
• Specify any activities to be undertaken at night and why (if any)

Objective To appropriately manage noise during construction activities to minimise impact to


workers, neighbours and community members.

Actions Requirements Responsibility Timing


All significant noise Site Manager Throughout construction
generating activities will works
be undertaken between
Mon-Sat 8am to 6pm

Performance Indicators No complaints regarding Site Manager Throughout construction


noise from workers / works
neighbours / community
members

Monitoring Noise monitoring program Site Manager Throughout construction


or complaint based works
monitoring

Corrective Actions Throughout construction


works

4.5 Hazardous Substances

• Storage
• MSDSs
• Refuelling
• Spill kits and emergency spill response
• Spill kit training

Objective To manage construction activities with the potential to cause contaminated soil.

6
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

Actions Requirements Responsibility Timing


All chemicals will be Site Manager Throughout construction
stored in bunded, roofed works
areas with MSDSs kept
nearby

Performance Indicators No spills Site Manager Throughout construction


works

Monitoring Chemical storage areas Site Manager Throughout construction


and spill kits will be works
inspected on a routine
basis

Reporting Reporting to site manager All staff Throughout construction


and PBPL works
Any reporting to PBPL Throughout construction
Department of works
Environment and Heritage
Protection
Corrective Actions Corrective actions and Site Manager Throughout construction
implementation time works
frame

4.6 Contaminated Soil

• No contamination expected

Objective To manage construction activities with the potential to cause or disturb


contaminated soil.

Actions Requirements Responsibility Timing


No fill material will be Site Manager Throughout construction
imported to or removed works
from site

Performance Indicators No evidence of Site Manager Throughout construction


contaminated soil on site works

Monitoring Any contamination Site Manager / consultant Throughout construction


sampling works

Reporting Reporting to site manager All staff Throughout construction


and PBPL works
e.g. Any reporting to e.g. PBPL Throughout construction
Department of works
Environment and Heritage
Protection
Corrective Actions e.g. Corrective actions e.g. Site Manager Throughout construction
and implementation time works
frame

7
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

4.7 Waste Management

Include:

• Sensitive receptors
• Waste receptacles and servicing

Objective To appropriately manage waste during construction activities.

Actions Requirements Responsibility Timing


Appropriate waste Site Manager Prior to works
receptacles will be commencing
provided on site
Performance Indicators No waste deliberately or Site Manager Throughout remediation
unintentionally released works
Monitoring Waste receptacles will be Site Manager Throughout remediation
inspected daily and works
emptied weekly

Reporting Reporting to site manager All staff Throughout construction


and PBPL works
Any reporting to PBPL Throughout construction
Department of works
Environment and Heritage
Protection
Corrective Actions Corrective actions and Site Manager Throughout construction
implementation time works
frame

4.8 Flora and Fauna

• Activities with potential to interfere with flora/fauna (both terrestrial and aquatic)
• Removal of flora and relevant environmental approvals
• Importation of fill free from Red Imported Fire Ants
• Landscaping works

Objective To appropriately manage construction activities with the potential to disturb flora and

8
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

fauna.

Actions Requirements Responsibility Timing


No significant vegetation Site Manager Throughout construction
will be disturbed works

Performance Indicators No harm to local flora Site Manager Throughout construction


and fauna works

Monitoring Visual monitoring Site Manager Throughout construction


works

Corrective Actions

4.9 Cultural Heritage

• Any known areas of Cultural Heritage Significance


• Steps to be undertaken if cultural heritage artefact is uncovered (“cultural heritage duty of care”)

Objective To appropriately manage construction activities with the potential to disturb/uncover


cultural heritage sites/artefacts.

Actions Requirements Responsibility Timing


All contractors will be Site Manager Throughout construction
educated on their cultural works
heritage duty of care
Performance Indicators No cultural heritage Site Manager Throughout construction
artefacts uncovered works

Further information and supporting documents are available from Oakleaf Property Group by
emailing tom@oakleafproperty.org.uk or calling 07795007760.

Signed:

Directors
Oakleaf Property Group LTD (J. Willmott / T. Stovold)

9
OAKLEAF PROPERTY GROUP LTD – CEMP – CLAREMONT ROAD 1-6

Date: 1/2/2022

Other Signatory

Health & Safety Advisor – Angus Atherton Palmer