KCC MALL OF COTABATO CITY

69KV SUBSTATION DESIGN AND BUILD

10 QUEZON AVE. ROSARY HEIGHT 2, COTABATO


CITY, 9500 MAGUINDANAO

Contractor : ALTERNATIVEPOWER SOLUTIONS, INC.


Methodology Flow Chart
Methodology Flow Chart
Substation’s Primary Parts
 Disconnecting Switch (DS)
 Lightning Arrester (LA)
 Current Transformer (CT)
 Potential Transformer (PT)
 Gas Circuit Breaker (GCB)
 Power Transformer 10MVA
 XLPE Cable
 Grounding System
 MVSG (by owner)
Standard Substation Composition
Standard Fallow in Constructing Substation

 The project documents, the approved drawings


 The End Client Standard Civil Works, sets out the majority of
the requirements for civil design and construction
 National Building Code of the Philippines
 Philippines Electrical Code
 Environmental Compliance Certificate of the Philippines
 National and Locally Permits and bylaws
 Department of Public Works and Highway (DPWH)
 Manufacturer and other standard which is Internationally
accepted
Substation Yard Requirements
 Materials; Base Course, Sub Base, Subgrade, and Selected fill 
 Sealed base course; Fine crushed rock (FCR) layer consisting of base
course material as per acceptable standard of NBC/DPWH
 Unsealed base course; natural gravel layer consisting of unsealed
material
 Sub-base course; FCR layer(s) below base course and overlaying
subgrade or select fill consisting of sub-base course material
Standard
 Sub-grade; Soil below the sub-base course and must be either
suitable in site material or must be built up using select fill
 Select fill; Material free of vegetable and other deleterious matter,
free of clay lumps
Compaction Table
Safety Protocol
 Safety issue on the builders area are typically
nominated on the plan, it must be
verified/identified by the Substation
Construction Safety officer during the pre-
start meeting
 The Safe Work Areas must be demarcated by

the appropriate barrier (i.e. fences, bunting,


flags) as defined in OSHA, EH&S contruction
safety standard
 Excavations
Extreme caution must be exercised when excavating inside or
adjacent to substations to avoid damage to or contact with
existing underground services. Excavation inside/outside the
substation a Permit to Dig is required for all excavations
>300mm
SAFETY MEASURE
 APSI Worker are required to wear PPE
 APSI fallow International Safety Standard
also with the end client safety & electrical
standard

 APSI exercise OSHA’s Electrical & Safety


Standard, NFPA 70E Electrical safety
requirements for workers and workplace.
Electrical Safety Test Prior to Energization

 Power Quality Analyzer


 Protection Relay Testing
 CT and PT Testing
 Hi pot Testing
 Power Circuit Breaker Test
 Insulation Resistance Test (IR)
 Ground Resistance Test
Proposed Construction Schedule
Manpower Schedule
Equipment/Tool Schedule
THANK YOU