PROGRESS UPDATE
LOCATION
LOCATION MAP
MAP
2
Site Plan
3
Progress
Progress Summary
Summary up
up to
to 27
27thth April,
April, 2017
2017
Elapsed Time
Start Date 05-Feb-2017 Elapsed Duration 82
Data Date 27th April , 2017 Contract Project Duration 546
0 100 200 300 400 500 600
Start Date 05-Feb-2017
Completion Date 04-Aug-2018
Contract Dates
Drainage Approved
PWA
Roads Approved
Water Approved
KH
Electrical Approved
5
Barwa
Barwa Village
Village Extension
Extension Planned Actual%% Variance
Planned%%Actual Variance %
%
VJ 01 TO
08
3
VH01 TO
08
VA 01 TO VC 01 TO
VE 01 TO
12
Substation 1 04 05 Zone 4 04 VG 01 TO
08
Planned % Actual % VB 01 TO
Variance
04
Planned VF
VD 01 TO %01 TOActual % Variance
05 04
14.66%
27/Apr/2017 14.17%
14.00% planned 1.99%
Actual 3.19%
100%
12.75%
12.00%
80%
10.00% 9.66%
8.07%
8.00% 60%
7.09%
6.00%
5.18%
4.97% 4.97% 4.95% 40%
4.00% 3.72%
3.26%
2.68%
20%
2.00% 1.69%1.62%
1.58%
1.35%
0.53%
0.15%
0.12% 0.01% 0.00%
0.00% 0%
6
77
800 4500
Manpower S _ Curve
699 4000
700
661
3500
600
513 3000
504
500
446
2500
400
335 2000
300
1500
206
200
169 1000
147 143
115 117 123
100
100
500
54
40 37
12 4
1 2 0
0 0
8
Equipment
16 100
14 90
14
80
12
12
11 70
10
10
60
9 9
8 8
8 50
6 40
6
30
4 4
4
3 3 20
2 2 2 2
2
10
1
0 0 0
0 0
9
Variance Chart
Weekly Variance
1.4
1.38
1.35
1.31
1.3
Variance
1.25
1.2 1.2
1.15
1.1
10 11 12
10
Elapsed Time
Elapsed Duration 82
Contract Project Duration 546
50% 50 %
42%
58%
11
Major Activities Look A Head
STRIP BUILDING - Block 1 Start Finish
Ground Beams Concrete Casting 2/May/17 2/May/17
slab-on-grade -Concrete Pouring 10/May/17 10/May/17
Ground Floor Columns.- Concrete Casting 15/May/17 15/May/17
Mezzanine Floor Slab - Concrete Casting 22/May/17 22/May/17
STRIP BUILDING - Block 2 Start Finish
Ground Beams Concrete Casting 14/May/17 14/May/17
slab-on-grade -Concrete Pouring 24/May/17 24/May/17
Ground Floor Columns.- Concrete Casting 29/May/17 29/May/17
Mezzanine Floor Slab - Concrete Casting 5/Jun/17 5/Jun/17
STRIP BUILDING - Block 3 Start Finish
Footing-Concrete 9/May/17 10/May/17
Neck column-Concrete 16/May/17 17/May/17
Waterproofing For Footings & Column Necks 20/May/17 23/May/17
STRIP BUILDING - Block 4 Start Finish
Footing-Concrete 21/May/17 22/May/17
Neck column-Concrete 28/May/17 29/May/17
STRIP BUILDING - Block 5 Start Finish
Excavation On Going
Blinding Concrete Pouring On Going
Footing-Concrete On Going
12 12
Project Obstacles
Activity Status
Re-routing of Existing Fiber optic Cables (approx.. length 150 LM) In progress
13
Area of Concerns
Proposed Mitigation
S.no Description
Coordination with MOI traffic department/ Closer Follow Up from all concerned
1 ASHGHAL for road closure/ traffic diversion. project parties with the Authorities and
client support required
KM additional scope (not covered under Client to issue site instruction to the
2 connection fees) & relocation of existing contractor
services
Cavity discovered in zone 5 during - More site investigation by ICT & ACES
3 excavation - ACES Revised Geotechnical report
- Designer review and recommendation
14
Summary for NCR’s
15
HS&E Summary Report
Till 25/04/2017
16
Zone 1, 2 and 3A
17
ZONE#1A Ground beam formwork and ZONE#1A Ground beam waterproofing &
Reinforcements formwork & reinforcements
20