Maintaining HT/LT motor greasing plan/schedule completion record.
Temperature monitoring/scanning of HT motor, panel, transformer, bushing and
turrets.
HT motor preservation by 90 ̊ clockwise rotation, IR/PI checking and space heater
current checking.
HT motor space heater healthiness checking and monitoring.
Hydrogen plant cell replacement/handling trolley.
Review of PM/Defect fortnightly.
Numbering of HT panels on both front and back side in order to avoid any kind of
accident/ mishappening.
Spare breaker readiness and operation checking.
Spare LT feeder readiness.
Availability of drawings in every MCC and DC motor Panels (JOP, EOP, SOP AND
SCANNER)
HT/LT breaker handles display board and availability of panel keys.
BEST MAINTENANCE PRACTICE
Two step Wooden stand for working in HT/LT panels.
HT/LT motors, panels, transformers marshalling box and JB spare gland hole
sealing.
Use of bi-metallic washers in Cooling Tower motors, 11 replaced in DMCW
motors and Admin chiller compressor which resulted in Extension of life of
lugs and reduced breakdown frequency.
Plant earth pit measurement.
Rubber mat availability in all panels.
All extension boards are provided with ELCB and Plug top.
Battery capacity test done in every AOH duration 02 Years.
Routine relay audit done of all panels and motors.
Routine EMS data monitoring done.
Lift/Elevators load test done in every Six months.
BEST MAINTENANCE PRACTICE
All lifting tools routine testing done.
DC lighting availability ensured.
ESP opacity checking done as per environment norms.
Disposal of hazardous wastes.
Used transformer oils re-used in ILMS.
LT breaker handling trolley availability in all MCC.