Effectiveness :
Availability : K1 = "closure" rate = B1* / A
K1 = time when the line is closed (planned stoppage but not for maintenance)
(lack of orders, strikes, other unproductive time)
/ Calendar time
This KPI is not really in S2 process, but should be followed in order to
check that the planned unavailability of the line corresponds to the
real commercial load.
1
Definition of KPI’s
Efficiency :
Planned maintenance : K2 = Planned Maintenance Ratio = C1* / A
K2 = Time when the line is stopped for planned maintenance
(included Annual shutdown and Major relines/overhaul)
/ Calendar Time
not to be confused with "planned maintenance ratio" of the GTB : K2 includes the annual
shutdown
Repairs & Maintenance Cost : €/T HRCeq.
€/RAV E3
2
Definition of KPI’s
3
Definition of KPI’s
4
Definition of KPI’s
5
Definition of KPI’s
6
7
Copyright © ArcelorMittal
Une machine fonctionne 365 jours / an
Elle test tombée 6 fois en panne
Calculer le MTBF
Une machine fonctionne 365 jours / an
Elle test tombée 6 fois en panne
Calculer le MTBF
Panne 1 : 2h
Panne 2 : 3h
Panne 3 : 3h
Panne 4 : 4h
Panne 5 : 4 h
Panne 6 : 2h
Calculer le MTTR
La machine est arrêtée 4H
tous les lundis matins
pour maintenance
Calculer le K2
Calculer le KM