2 INTRODUCTION

 Under reamed piles are made by C.B.R.I.( Central Building Research Institute).

 They are made of R.C.C.

 In the bottom portion of the pile, enlarged portion is given which is called ‘under reamed’
or ‘bulb’.

 If pile has one bulb, it is called single reamed, if the pile has two bulbs then it is called
double reamed, and if there are more than two bulbs, it is called multiple under reamed
piles.
3

SINGLE AND DOUBLE UNDER REAMED


PILES
4 FEATURE
S
 Dia. Of the pile = 20 to 50cm
 Dia. Of the bulb = 2 to 3 times of dia. of pile
 Length of the pile = 3 to 8m
 Spacing between two piles = 2 to 4m
 Spacing between two bulbs = 1.25 to 1.5 times of bulb dia.
 Load carrying capacity = 20 to 40 ton
5 APPLICATIONS

1. Black cotton soil expands as it comes in contact with water and it gets contracted as it is
dried out. Because of this reason, there may be a chance of cracks in the structure. To avoid
such damage, under reamed pile are used in black cotton soil.

2. When the soil doesn’t have much load carrying capacity, under reamed piles are used to
increase the capacity.

3. It is used when the water level in sandy soil is high.

4. When there are lifting forces acting, it should be used.


6 INCREASING LOAD CARRYING
CAPACITY
1. By putting more bulbs

2. By increasing the dia. of bulb

3. By increasing the length of pile

4. By providing proper reinforcement


7 Construction of under reamed pile

 Under reamed piles are mostly constructed by manual work.

 The machine for the construction of pile is made by C.B.R.I. Rurki.

 The machine is easy to use and it is light weighted.


 It consists of three tools :
1. Spiral Auger
2. Under – reamer
3. Boring guide
8

 Spiral auger is used to make a hole in the land for the under reamed
pile.

 The auger contains special cutter at the bottom to dig the


land.

 The soil that is dug is taken out by the


bucket.
9

SPIRAL AUGER INSERTED THROUGH TRIPOD IN VERTICAL


DIRECTION
10

BUCKET PROVIDED TO TAKE OUT THE


SOIL
11

REINFORCEMEN
T
12

CONTRUCTED UNDER REAMED


PILE
13

 Special cutter is used for making the bulb. By putting enough pressure, we can increase the
dia. of bulb.

 The auger is kept through the tripod and after than the digging is done. So the digging
is
done in the vertical direction.

 After digging the desired depth, the auger is pulled out. The reinforcement is then inserted
in the hole. Concreting is done. If more than one pile, beam is constructed which connect
the piles and make them act like a single unit. The wall is than constructed on the beam.
14

PILE CAP CONNECTING ALL THE


PILES
15 ADVANTAGE
S
1. It is 15 to 20% cheaper than the strip footing.
2. Less material required.
3. Digging is normal so the work is carried out for anytime of the year.
4. No back filling is required.
5. Shoring is not required.
6. Dewatering is not necessary.