Professional Documents
Culture Documents
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
Fundamentals of OBM
OBM: A fluid in which the oil represents the continuous phase while water the
discontinuous phase.
Composition
• Continuous Phase
• Diesel
• Crude Oil • OWR (80/20, 85/15, or 90/10)
• Mineral Oil
• Water droplets act as colloidal solids.
• Discontinuous Phase
• Water • These water droplets play a vital role
in making an effective filter cake.
• Additives
• Emulsifiers
• Viscosifiers Emulsion
• Weighting Agent
• Fluid Loss Control
• Rheology Modifier
2
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
Fundamentals of OBM
3
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
Fundamentals of OBM
Plastic Viscosity
Yield Point
Low Share
Rheology
• Higher the HC, lower the PV
Properties OWR
• Thinning the Base Fluid, Lower the YP
Lime
• Higher the OWR, Lower the ES
Electrical Stability
Oil Wetting
4
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
HPHT Drilling Fluid Challenges
High Pressure High Temperature (HPHT) Wells: Having pressure more than 300°F and use the Well Pressure Control
Equipment with 10K ratings are termed as HPHT wells.
5
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
HPHT Drilling Fluid Challenges
PVT Analysis
6
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
HPHT Drilling Fluid Challenges
ECD
7
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
HPHT Drilling Fluid Challenges
8
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
HPHT Drilling Fluid Challenges
9
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
HPHT Drilling Fluid Challenges
10
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
HPHT Drilling Fluid Challenges
11
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
Critical Review: HPHT Drilling Fluid Challenges
Use of Oil Based mud in HPHT wells Use of Water Based mud in HPHT wells
12
Group Number 2 | Wahaj Ahmad Khan | Muhammad Idrees | Muneeb Tahir | Usman Muneer | Ashir Naeem | Noman Raza
Thank you
13
We Are Expecting Some
Really Good Question
14