Professional Documents
Culture Documents
Management System
(IMS) –
Vendor
RDMP JO
BALIKPAPAN
What is IMS?
Login to
ims.rekayasa.com
Choose
account type:
vendor
Login with PO
No. and
Password
Illustration After Vendor Login
Pre-
Inspection If vendor invite Rekind & Client for PIM, vendor shall make AFI through IMS for ‘Pre-Inspection
Meeting Meeting’
(PIM)
Inspection Vendor shall make AFI through IMS for ‘Inspection’ when vendor invite Rekind to inspect materials
Material Vendor shall make AFI through IMS for ‘Material Verification’ when vendor invite Rekind to inspect
Verification incoming materials before start fabrication
Vendor shall make AFI through IMS for ‘In Process Inspection’ when vendor invite Rekind to inspect
In Process
Inspection incoming materials in the process of fabrication (Welding Inspection, Assembly Inspection, etc – as
per ITP)
Function Vendor shall make AFI through IMS for ‘Function Test (FAT)’ when vendor invite Rekind to inspect
Test (FAT) the function of the materials (Hydro-test, running test, balancing test, etc – as per ITP)
Final Vendor shall make AFI through IMS for ‘Final Inspection’ when vendor invite Rekind to inspect the
Inspection final check of equipment before shipment
MDR Vendor shall make AFI through IMS for ‘MDR review’, parallel when vendor send MDR document
Review via Aconex
2. Inspection Tracking
3. PO Update
• Click PO update to print IRC (Inspection Release Certificate) and view PO
status
• If the Inspection step are completed, vendor can print IRC with entry
validation code, which is auto-generated by system