You are on page 1of 21

Protecting Surfaces Against Severe

Sliding Abrasion

Extremely Hard Surfaces Provide the Best


Performance
Conventional Technology Benefits
- Rubber Lining - IMPACT
- Ceramic Tile Lining – High Velocity Sliding
- Hard Metal Welding – High Hardness
- Special Hard Metal Alloys – High Hardness

All Approaches Have Some Limitations:


- Cost
- Speed of Repair
- Limited Impact Resistance
- Not Repairable

Mining and Mineral Processing -1-


1
Erosion

This is fluid flow enhanced wear with or without entrained


solids in the flow stream. The flow is typically of moderate
to high velocity or is turbulent. The stress is therefore due
to higher flow rates but with low applied loads (entrained
solids).
Mining and Mineral Processing -2-
2
Grinding
Grinding // Gouging
Gouging

Mining and Mineral Processing -3-


3
Impact
Impact

Mining and Mineral Processing -4-


4
Design of Ceramic Reinforced
Composites for Severe Abrasion

Combines the Wear Resistance of Ceramics


With the Benefits of Composite Technology
Mining and Mineral Processing -5-
5
Design of Ceramic Reinforced
Composites for Severe Abrasion

Maximum Physical Reinforcement


 Minimum Exposed Matrix to Abrasion
 Maximum Wear Resistance
Mining and Mineral Processing -6-
6
Visual comparison between ARC and
other traditional coatings for
abrasion

ARC MX1 Competitive System

Mining and Mineral Processing -7-


7
Resulting Properties of the
Engineered Ceramic Composite

Ceramic Epoxy Resulting


Reinforcement + Matrix = Composite
 Abrasion Excellent  Good  Excellent
Abrasion
 Brittle / Cracking  Tough / Impact
 Energy
Resistant
Absorber
 Hard to Mold and  Easily Shaped
 Moldable
Shape and Molded
 Poor Adhesion  Excellent
 High Temperatures  Excellent  Moderate
 Moderate
Mining and Mineral Processing -8-
8
Ventilation
Ventilation Fans
Fans for
for Mine
Mine Shafts
Shafts Protected
Protected
against
against Corrosion
Corrosion and
and imbalance
imbalance

Mining and Mineral Processing -9-


9
Rotary
Rotary feeder
feeder unit
unit protected
protected by
by MX1
MX1
and
and ARC
ARC 855
855

Units lasting 1 year before


Being taken out of service for
touchup versus <12 weeks for
unprotected surfaces
Mining and Mineral Processing -10-
10
Rotary
Rotary feeder
feeder unit
unit protected
protected by
by
MX1
MX1 and
and ARC
ARC 855
855

Molded internals

Mining and Mineral Processing -11-


11
Rotary
Rotary feeder
feeder unit
unit protected
protected by
by MX1
MX1
and
and ARC
ARC 855
855

Drum after 1 year

Mining and Mineral Processing -12-


12
Rotary
Rotary feeder
feeder unit
unit protected
protected by
by
MX1
MX1 and
and ARC
ARC 855
855

End caps and rotary unit


after 1 year in service

Mining and Mineral Processing -13-


13
Acidic
Acidic slurry
slurry in
in tin
tin mining
mining damaged
damaged
rubber
rubber impellor
impellor inin 2-3
2-3 months
months

Damaged rubber lining

Impellor after removal


of rubber liner

Mining and Mineral Processing -14-


14
Impellor
Impellor life
life extended
extended by
by 3
3 times
times to
to
6+
6+ months
months
Impellor repaired prior
to preparing and coating

ARC MX4 coated


surface with ARC 855
topcoat

Mining and Mineral Processing -15-


15
Location of slurry pumps handling +6 mm, 75% solids
Niobium slurry

Mining and Mineral Processing -16-


16
Niobec Mines – Slurry Pump

Mining and Mineral Processing -17-


17
12”x10” slurry pump rebuilt with MX1 replacing Linatex rubber lining
which was lasting 3-4 months now last 12-15 months

Mining and Mineral Processing -18-


18
Niobec Mines – Slurry Pump

 Repair and maintenance costs reduced


from USD$ 25,400.00/year/pump to
USD$9,700.00/year/pump.
 $4,200.00 of MX1 consumed per pump
 Increased flow rate for pump from 5,000
liters/minute to 15,000 liters/minute.

Mining and Mineral Processing -19-


19
Zambian
Zambian Consolidated
Consolidated Copper
Copper ––
Mufulira
Mufulira Mine
Mine
Dust extraction fan, fan casing
sala-pump feed box, ball mill
feed box, hydroseal pump,
cyclone (upper and lower) cone,
Flyght light pump lower diffuser

Rubber linings were lasting


<4 months and required
shipment to offsite locations
for repairs often taking 4-6
Weeks before parts were
returned
Mining and Mineral Processing -20-
20
Cyclone
Cyclone parts
parts and
and flume
flume lines
lines
coated
coated with
with MX1
MX1

Mining and Mineral Processing -21-


21

You might also like