CO4:- Apply Principles of safety
management in activities.

UO3.2:- Prepare work permit to


conduct given maintenance activity.

MSBTE LEAD Learning at Your Doorstep.

Written by

ATUL G. WAGHULDE
LECTURER IN MECHANICAL ENGINEERING
Learning Objective :-

► To understand Permit to Work process.


► To prepare work permit for conducting maintenance activity.

Page 3 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Contents:-

1. What is Work Permit? “Always follow company rules, regulations and procedures.”
2. Features of Work Permit.
3. Elements of Work Permit.
4. Types of Work Permit.
5. Preparation of Work Permit. Atul G. Waghulde
Lecturer in Mechanical Engineering

Page 4 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
What is Permit-to-work?

1. A permit-to-work system is a formal written system used to control


certain types of work that are potentially hazardous.

2. A permit-to-work is a document which specifies the work to be done


and the precautions to be taken. Examples work in confined spaces,
work at height, high risk areas, to repair, maintain, or inspect the
electrical installations or to use the large or the complex equipment etc.

3. Permits-to-work form an essential part of safe systems of work for


many maintenance activities.

4. It is also a means of communication between different departments,


plant supervisors, operators, agencies etc.

Page 5 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Features of permit-to-work systems:-

A Standard Operating Procedure, job or method statement and information


The equipment and tools to be used
  
A hazard and risk assessment
   
Required precautions, mitigating actions and control
measures
 
  
All PPE requirements
 
  
The permit issue, extension and withdrawal details
 
  The names and signatures of those who are responsible
for the job
A Tool Box Talk signed  by all workmen

Page 6 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Elements of Work Permit System:-

 Issue: 1. It means pre job check,


2. Description of work to be carried out
3. Description of plant and location,
4. Assessment of hazards
5. Identification of controls.

 Receipt: 1. It means handover of permit,


2. Competent and authorized person issues permit to workers
3. Work can now start,
4. Workers sign to say the accept control,
5.Plant is now under the control of workers.

 Clearance: 1. It means hand back to permit,


2.Workers sign to say they have left the job site and equipment's can
restart.

 Cancellation: 1. Authorized person accept plant back and can remove isolation,
2. Plant is now returned to the control of the site.
Page 7 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Types of Work Permit:-

1. Hot work permit: It is any work that could create a source of


ignition that could result in fire or explosion. Examples: Spark
producing tools, hammering in high risk gas areas, explosives,
welding and torch cutting etc.

2. Cold work permit: a cold work permit shall be obtained for all
general work that does not involve activities related to hot work.
Example: Routine maintenance, inspection, hand tools.
Opening of process equipment such as, vessels, towers, pumps,
compressors, heat exchangers, filters, tanks, etc.

3. Electrical Permit: A work permit is required for work on electrical


systems where there is a possibility of contacting energized
electrical conductors.

Page 8 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Types of Work Permit:-

4. Confined Space Entry Permit: A work permit is required to allow personnel


to enter a confined space such as a tank, vessel, blade, trench, etc.

5. Ground Disturbance Permit: A work permit is required for any excavation or


ground disturbance activity that involves digging, trenching, excavating or
removing soil or ground.

6. Excavation: A process of moving earth, rocks or other materials with tools,


equipment or explosives. It includes earthworks, wall shafts, tunnelling and
underground work, using manual or mechanised methods.
For excavations more than 1.2 meters deep a Confined Space Entry
Authorization is also required.
► Responsible person: A person i.e Issuer, Executor and Field Operator
authorized by manager who will responsible for keeping his area and staff
safe.

Page 9 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Design of work to Permit:- Sample

Page 10 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Permit to work Activities for Maintenance of Grinding Machine.

C O L D W o rk P e r m it fo r M a in te n a n c e A c tiv ity
 
1 . W o r k D e t a ils
Permits Required :- Yes /No :- Acceptance of Permission /YES
L o c a ti o n o f C o l d W o r k : P r o d u c ti o n W o r k s h o p P e r m it N o . :- P W / 1 2 3  
N a m e s o f P e r s o n / s c o n d u c ti n g w o r k : M r . A n a n d B a k s h i , M a i n t e n a n c e E n g i n e e r Employers must ensure that workers are trained and follow this SAFE Work
Procedure
D e s c r i p ti o n o f W o r k : M a i n t e n a n c e o f G r i n d i n g M a c h i n e . Steps to perform this task safely:
E q u ip m e n t N o . 1 2 3 4 5 6 .  
P r i o r t o p e r m i tti n g t h e p e r s o n ( s ) i n t e n d i n g t o p e r f o r m c o l d w o r k , m a n a g e m e n t a r e t o v e r i f y t h a t 1.Only use the grinder in a manner specified by the operational instructions and
t h e p e r s o n ( s ) a re a d e q u a t e ly t r a in e d . always ensure the guards are in place
2 . H a z a r d s a n d R is k C o n t r o ls 2.Pre inspect grinder to ensure switches, cords, grinding stone or brush are in
Awkward / sustained postures – holding parts Personal protective equipment / devices required / other safety
good working order.
Forceful exertions – holding against grinder/brush considerations If there is damage or excessive wear and tear, do not use the grinder and inform
Repetitive movements a supervisor
Vibration – (hand arm) part against grinder - Gloves 3.Ensure the tool rest is not below the horizontal centre line and no more than
Compression - Safety footwear 3mm from the face of the wheel
Sharp points / edges – grinder wheels, brush - Eye protection / face shield 4.Hold the part firmly but do not apply excessive force of the tool / part against
Pinch points - Hearing protection the grinder
Materials falling - Secure loose clothing, hair, draw strings from hoods etc that
Surfaces causing falls could become entangled in wheel.
5.Do not try to hold parts that are too small so that there is a risk that your
Moving machinery fingers may contact the grinding wheel.
Chemicals 6.Attach and secure part to be grinded to another tool / extender such as vice
Biological pathogens grips
Electrical Safety Checks for compliance 7.Do not grind against the side of the wheel
Extreme heat – burns from hot parts Sr.No. 8.Grinding wheel shape and wear must be maintained as per manufacturer’s
Noise Is Electrical Work Permit Required ? YES specifications
1
Combustibles / flammables
Other _____________________ 2 Is Confined area permit required ? 9.For repetitive or long lasting tasks, take micro breaks or change tasks or
3 Is Height Work Permit Required ? positions to reduce stress on the same muscles
4 Is Cold Work Permit Required ? YES  
Is Excavation work permit required ?
10.Always turn off the grinder and unplug it / lock it out before performing
5
adjustments, maintenance or repairs
6 Is Process Isolation required ?  
If YES, take clearance form process Dept.  
 

Page 11 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Permit to work Activities for Maintenance of Grinding Machine. Cont.

3 . V e r i fi c a ti o n 

A l l p e r s o n ( s ) h a v e r e c e i v e d i n s t r u c ti o n i n t h e R i s k A s s e s s m e n t a n d / o r J o b S a f e t y A n a l y s i s ( J S A ) f o r Yes
t h e w o r k a c ti v i t y .
A l l p e r s o n ( s ) u n d e r s t a n d t h e p o t e n ti a l r i s k s i n v o l v e d i n t h e w o r k t o b e c a r r i e d o u t . Yes
A ll p e r s o n ( s ) u n d e r s t a n d t h e c o n t r o ls t o b e im p le m e n t e d . Yes

4 . A u t h o r it y

P e r s o n Is s u in g P e r m it : P e r s o n R e c e iv in g P e r m it : M r .A B C
M r.X Y Z S ig n a t u r e : S ig n a t u r e :
P e r m it V a lid f r o m : P e r m it V a lid t o :
D a t e :0 7 / 0 7 / 2 0 2 0 D a te 7 /1 2 /2 0 2 0
T im e : 1 0 A .M . T im e : 5 P .M .
5 . U p o n C o m p l e ti o n o f W o r k 

The above work is completed. Man power deployed is removed from the working site.

W a s t e m a t e r ia l h a s b e e n r e m o v e d a n d d is p o s e d o f s a f e ly
6 . A u t h o r it y I a c c e p t t h a t t h e w o r k s p e c i fi e d a b o v e i n t h i s p e r m i t h a s b e e n c o m p l e t e d .
P e r s o n w h o Is s u e d P e r m it : P e r m it w h o R e c e iv e d P e r m it :
M r.X Y Z S ig n a tu r e : M r .A B C S ig n a t u r e :

D a te : 7 /7 /2 0 2 0 D ate :
Time:10 A.M. 0 7 /0 7 /2 0 2 0
Time: 11 A.M.
Copy : (1) Production Workshop (2) Safety Office, (3) Office Record ( Retention Period 7 days)

Page 12 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
Summary:-

►Understanding of Work Permit?

►Features of Work Permit.

►Elements of Work Permit.

►Types of Work Permit.

►How to Preapare of Work Permit.

Page 13 Maharashtra State Board of Technical Education Tuesday, May 04, 2021
THANK YOU ALL

Page 14 Maharashtra State Board of Technical Education Tuesday, May 04, 2021