Installed 22 units
Installed units (15MW
(15MW xx 2)
2) Installed 1 unit (40MW) as Unit-5 Expansion
Expansion project
project for
for Unit-7
Unit-7 and
and
as Unit-1
as Unit-1 and
and Unit-2
Unit-2 Total Capacity 5 units: 150MW Unit-8 (40MW
Unit-8 (40MW x 2)x 2)
Total
Total Capacity7 units
Capacity7 units :: 235
235 MW
MW
2
Organization Chart of Nam Ngum-1 HPP
Director Deputy
Director (2 Person)
O & M Group
Safety
Manager
3
Maintenance Theory
Type of Maintenance:
- Preventive Maintenance (PM)
- Corrective Maintenance (CM)
- Predictive Maintenance (PDM)
Condition Base Maintenance Fixed Time Maintenance Unplanned Corrective Maintenance Planned Corrective Maintenance
(CBM) (FTM) (UCM) (PCM)
4
Maintenance Group (Electrical, Mechanical and Civil)
Maintenance Method
6
Preventive maintenance (PM)
Electrical Division (Monthly Inspection)
Replace new Carbon Brush of Generator ( Span life of equipment)
7
Preventive Maintenance (PM)
Electrical Division (Yearly Inspection)
Ratio and Polarity Test of CT (115kV) Insulation Resistance Test for Generator
Winding
8
Corrective maintenance (CM)
Electrical Division
້
ສ້ອມແປງ On Load Tap Changer (OLTC) ຂອງໝໍແປງ 7.5 MVA
9
Corrective maintenance (CM)
Electrical Division
Replace new Clamp Due to the Clamp and Conductor damaged
(Emergency case)
10
Corrective maintenance (CM)
Electrical Division
Repair Oil Leakage of Transformer by Overhaul all Gaskets
11
Preventive maintenance
Mechanical Division (Weekly Inspection)
Check Air Compressor System and Air pressure tank
12
Preventive maintenance
Mechanical Division (Yearly Inspection)
Measure Guide Bearing gap Measure Cavitation of Runner
13
Preventive maintenance
Civil Division (Daily Inspection)
Dam Monitoring
14
Preventive maintenance
Civil Division (Weekly Inspection)
Check Water Leakage and Pressure in Gallery
15
Preventive maintenance
Civil Division (Yearly Inspection)
Check Penstock
16