Observations
Observation Required Remark
1 Report Number 189413-18062020- 189413-180620- Avoid 4 digit year
01 01
2 Contract Code XXXX-XXXX- 400266 Only 6 digit numbers
XXXX-400266
3 Client For Loesche- ACC- Wadi This is second party
Loesche inspection .we need to
write client”s client
4 Supplier/Sub No error No error NA
supplier
5 Purchase Order No revision and Date Must If no revision indicate 0
and date
For package order write
sub order if package order
is not available
Inspected Items PO quantity – As per 100 nos and 30 nos Annexure not giving much
annexure accepted refer detail on accepted
annexure for detail /rejected/hold. Because most
of the cases it is from
supplier
8 Offered Loose, Shop floor Painted/ Unpainted Write the stage in which
condition Etc /Proof machined they offered. If not
/Final painted, it confirms
machines/Before Painting inspection not
Galvanising done by us
Painting check First coat, second coat , Every coat need to Ex. Coat 1. Observed 50 to 70
-DFT third coat followed is not meet minimum DFT, microns. 2 coat total DFT
meeting the requirement and Shade is a must observed 100 to 140 microns –
Ex 50 micron each this is wrong - Dicuss
Lube oil system Pressure readings, noise Photos has to be A tag plate can be introduced
level, vibration, coorelated with item indicating date of inspection, Sl
temperature photos seen inspected. Our product number of item, nearer to the
But not covering the should appear in gauges while taking photos
equipment photos
Base Frames Dimensions found as Need some brief Report says Required
per drawing and report on what dimensions – actual Found
acceptable checked and what same. It is like a
observed compliance report-
Discuss
Fabricated Report is silent on ITP calls for or not Mostly we need to check
items visual inspection Visual is a must 100%
Base frame Report same all are Length varies from Need to educate supplier
fabricated with in plus or minus 600 mm to
1mm 6000mm . This is
internal report
Cable Tray Huge quantities 100% Not possible To be discussed with client
checked
Pressure vessel 100% RT . Not clear Surveyor has to
Cir seam and whether it covers indicate what
L seam RT enter weld circum.- long
length and indicate
all areas are
covered
Pump with Direction of Pump Need to check the For higher HP motor it is
motor not indicated in report rotation of the fan important
direction in motors
Gear OD /Face Only run out on OD What is the This run out has to be
run out & Face checked and reference where checked with some
reported as OK this was made 000. reference ( For OD it is ID)
Is not indicated
Safety Shoe, Goggle, Gloves, Only applicable and For UT, ear plug not
compliance helmet, ear plugs , followed to be required, Many time in
nose mask indicated photos found with chapels
and no safety shoes and
unwanted photos / news
papers etc