You are on page 1of 16

Structured Cabling

Overview
The Six Sub-Systems of a
Structured Cabling System......

Telecommunications Electrical System


1. Building Entrance 1. Electrical Meter Pan
2. Equipment Room 2. Main Switch Board
3. Telecomm Room 3. Electrical Branch Panel
4. Backbone 4. Electrical Feeders (Riser)
5. Horizontal 5. Electrical Branch Circuit
6. Work Area 6. Electrical Duplex
Receptacles
Let’s take a look at each
subsystem individually!
Entrance Facility

Service
Provider

The entrance facility is the point where outside cabling and services
interface with backbone cabling. (The electrical equivalent would be
the meter socket/main disconnect switch.)
Equipment Room

The equipment room is the area of the building where incoming


cabling interfaces with electronic equipment. It is also the main
cross-connect (MC) to the backbone cabling. (The electrical
equivalent would be the Main Distribution Panel.)
Telecommunications
Room

Telecommunications Room is the area within a building that houses


telecommunications/networking equipment, as well as the cross-
connection (patch panels) between backbone and horizontal cabling.
I.e. Horizontal Cross-connect (HC) (The electrical equivalent would
be the circuit breaker panel.)
Backbone

Backbone consists of the pathways and cabling that provide the


interconnection between the Building Entrance/Equipment Room and the
Telecommunication Rooms. It consists of the mechanical terminations for
backbone-to-horizontal cross-connects. (The electrical equivalent would
be electrical feeders.)
Horizontal

Horizontal consists of the pathway and cabling that extends between


the Telecommunications Room and the Work Area. (The electrical
equivalent would be a branch circuit.)
Work Area

Work Area is where personal computers, telephones,


printers, etc are located. It also includes equipment
cords that connect the device to the horizontal cable.
Primary codes in North
America
● NEC
● National Electrical Code
● Produced by National Fire Protection
Association (NFPA)
● Revised every 3 years
● NESC
● National Electrical Safety Code
● Produced by IEEE
● Revised every 5 years
● CSA
● Primary code in Canada
● Closely harmonized with NEC
National Electrical Code
● Stated purposes of the NEC
● Ensures the safety of people and
property.
● Provides proper installation practices for
high
and low voltage systems.
● Adopted in whole or part by most
federal,
state and local municipalities.
● Identifies building space environments.
● Endorsed by the American National
Standards Institute.
● Deals with inside plant installations.
National Electrical
Safety Code
● Stated purpose of the NESC
● Safeguarding of persons, during
installation, operation, or maintenance
of electrical and communication lines
and equipment.
● Contains basic provisions for
safeguarding employees and the
general public under specific
conditions.
● The NESC is not intended as a
design specification or instruction
manual.
Building Codes
● The key purpose of these codes is
safety.
● Generally, the codes do not address
performance of our
telecommunications systems.
● The codes are promulgated as
models, which most local
municipalities adopt.
● Once adopted as ordinances, the
codes have the force of law and are
enforced through local building
inspectors.
NEC and Communications
NEC communications related
requirements

● Low voltage and power cables separation


● Cable supports above false ceilings
● Grounding requirements
● Protection equipment for exposed cables
● Firestopping
● Cable flame and smoke ratings
● 50 ft rule for un-rated (OSP) cable
● Removal of abandoned cable
Codes and standards--NEC
NEC: a model safety code for local
municipalities
air plenu
handler m
TR
plenum rating
CMP
OFNP

riser rating
CMR
OFNR
plus
Firestopping
general purpose
rating
CM
OFN
Some cable can’t meet any of
these tests: polyethylene (PE)
jacketed outside plant cable
50 foot maximum inside
building
Codes Vs. Standards

NEC
ANSI/TIA/EIA
75 Years+ 15 Years
Purpose: Safety
Codes Performance Standards
Compliance: Force of law Voluntary
Sanctions: Fines, halt in project Shorter useful life cycle

You might also like