Details of all the instruments used for construction of rigid pavements and works
which were carried out during the construction of rigid pavements are mentioned
in this report.
Acknowledgement
I would like to express my special thanks of gratitude to Mr. Faheemul Islam
Kirmani sir for continuous guidance and support throughout the
preparation of this Industrial Training Report. Competition of this report
would never have been possible without his constant support and guidance.
I would also like to extend my gratitude to Mr. Piyush Pandey sir for
coordinating with me throughout the preparation of this report.
Construction of Rigid Pavement
Slump: 15-25 , M30, Temperature of mixture – 27 Degree Celcius
Plough
• Membrane is put between Dry Lean
Concrete(DLC) and Granular Base.
• Height of DLC and Granular Base is 150 mm
• Granular Base is put below DLC.
Sensors
Dowel Bar Inserter
Inserted Dowel Bar