Professional Documents
Culture Documents
BARAMUNDA
ISBT, Baramunda
4. Operators
i) Odisha State Road Transport Corporation (OSRTC) (State Transport Undertaking)
• Responsible for management and maintenance
ii)Private Operators: Bhubaneswar Bus owners Association, Rajdhani Association,
Lingaraja Association, Mini Bus Owners’ Association
EXISTING BUS TRAFFIC CIRCULATION IN AND AROUND THE PROPOSED ISBT
UTILITY AND SERVICES PROVIDER AT ISBT BARAMUNDA
Current Current
Sl. No. Description Department Contact Person Designation Remarks
Supply Demand
Central Electricity
1 Electricity 89 KW 36 KW Mr. B.B Mohanty DGM (Elec.)
Supply Utility of Odisha
(CESU)
Supply limited to
Yes Public Health
2 Water Supply 80 KLD Mr. Sudhakar Swain AE-PHD 1 Admin building
Engineering
& Toilets
Organization (PHEO)
ENTRY 1 ENTRY 2
BUS STAND
PASSENGERS TERMINAL STAFF/VISITORS (REAL ESTATE
STAFF DEVELOPMENT)
OFFLOADING BAYS
TERMINAL CONCOURSE
WORKSHOP INFORMATION
CENTRE
BUS STAFF TICKETIN
IDLE PARKING
G
DORMITORY
CLOAK ROOM
DORMITORY
RESTING ROOM CANTEEN
ANCILLIARY
CANTEEN FUNCTION
DRINKING
WATER
TOILET
LOADING DRINKING WATER
BAYS SECURITY CHECK
POST
DEPARTURE
CONCOURSE
TOILET
EXIT 1 EXIT 2
PROPOSED LAYOUT PLAN – COMPLETE SITE PLAN
PASSENGER Total Site Area 15.5 acre
2 WHEELER EXIT BUS TERMINAL WITH SHOPS
PARKING
ISBT area 11.48 acre
AND ADMINISTRATIVE
FACILITIES(G+2) Dedicated commercial area 4.02 acre
CAR Terminal facilities in ISBT Area (G+2)(Mandatory)
PARKING
PASSENGER Platform area, ticket
ENTRY Ground Floor 7939.56 sqm. counters, waiting area and
shops(1210 sqm shops)
Food court and entrance
First floor (food court) 3430 sqm. lobby Includes VCEs, toilets
COMMERCIAL ENTRY/EXIT etc.
Dormitories for passengers
Second floor 4514 sqm + Administrative offices
BOARDING/ALIGHTING
BAYS(35 Nos.)
3 Nos. REPAIR BAY
Total 15883.56 sqm
5Nos. SERVICE PIT/FUEL Commercial facilities in ISBT Area (G+2)
STATION
COMMERCIAL/ RETAIL (G+2)
Basement 5130 sqm Parking + Services
BUS PARKING
171Nos. Entrance lobby and some
Ground Floor 1510 sqm. shops
Restaurants+ VCEs, toilets
First floor 5796 sqm. etc.
CITY BUS
Second floor 4935 sqm Retail / other offices
FOR DROP OFF/PICK-UP
Total 12241 sqm
BUS WASH
2 Nos. Total (terminal + commercial) 28124.56 sqm
TICKET COUNTER
ALIGHTING BAYS
BOARDING BAYS
KIOSKS
FIRST LEVEL PLAN @ 45.65 M LVL
RESTAURANTS
FOOD COURT
RETAI
L
DORMITORIES SECOND LEVEL PLAN
DORMITORIES
ADMIN
RETAIL
RETAIL
RETAIL
TYPICAL CROSS SECTION
15.15M
LVL 40 AMSL
3D VISUAL – BUS BAY AND PARKING SIDE
ART PANEL IN
VINYL PRINT
CURTAIN GLAZING PERFORRATED METAL ACP CLADDING ON ACRYLIC/
(CHAMPAGNE SIGN BOARD
ACP CLADDING CURTAIN GLAZING WITH WITH IKKAT PATTERN FRAME OVER CURTAON
SHADE) WITH PU COAT
(CHAMPAGNE METAL (GOLD FILM (CUSTOM MADE) GLAZING
SHADE) ANODISED)JALI COVERING
3D VISUAL – PASSENGER ENTRANCE SIDE
GLASS, STEEL
ACP CLADDING
AND
BACK LIT CURTAIN (CHAMPAGNE
ALUMINIUM CURTAIN GLAZING WITH
ACP CLADDING GLAZING COVERED SHADE)
FRAMED METAL (GOLD
(CHAMPAGNE WITH METAL CUTWORK
CANOPY ANODISED)JALI COVERING
SHADE) JALI
SUPPORTED
ON PILLARS
AND
SUSPENDED
FROM FAÇADE
WITH
TENSILE
STEEL ROPES
3D VISUAL – CITY BUS BAY
ART PANEL IN
VINYL PRINT
ON ACRYLIC/
SIGN BOARD
WITH PU COAT
PILLARS
ACP CLADDING CLADDED WITH
(CHAMPAGNE GRC JALI
SHADE) PANELS (BACK
LIT)
REFLECTIVE CURTAIN
GLAZING WITH METAL
(GOLD ANODISED)JALI
COVERING
3D VISUAL – CITY BUS BAY AND COMMERCIAL SIDE
GLASS, STEEL
AND
BACK LIT CURTAIN
ALUMINAM
GLAZING COVERED
ART PANEL IN FRAMED
REFLECTIVE CURTAIN WITH METAL CUTWORK
VINYL PRINT CANOPY
GLAZING WITH METAL JALI
ON ACRYLIC/ SUPPORTED
(GOLD ANODISED)JALI ON PILLARS
SIGN BOARD COVERING
WITH PU COAT AND
SUSPENDED
ACP CLADDING FROM FAÇADE
(CHAMPAGNE WITH
SHADE) TENSILE
STEEL ROPES
3D VISUAL – VEHICULAR LANES AT ENTRANCE
GLASS, STEEL BACK LIT CURTAIN
AND GLAZING COVERED
ALUMINIUM WITH METAL CUTWORK
FRAMED JALI
CANOPY
SUPPORTED
ON PILLARS
AND
SUSPENDED
FROM FAÇADE
WITH
TENSILE
STEEL ROPES
REFLECTIVE CURTAIN
GLAZING WITH METAL
ACP CLADDING
(GOLD ANODISED)JALI
(CHAMPAGNE
COVERING
SHADE)
3D VISUAL – EVENING VIEW
SITE DESCRIPTION
WATER
14. Total Water Requirement 1288 KLD
15. Fresh water requirement 772 KLD
16. Waste water Generation 979 KLD
17. Proposed STP Capacity 1000 KLD
18. Treated Water Available for Reuse 930 KLD
19. Recycled Water used 535 KLD
20. Surplus treated water 395 KLD
SITE DESCRIPTION (Contd.)
Sl. No. Description Details Unit
PARKING
21. Total Parking Required as / Building Bye 3738 (30 % of FAR) Sq mtr.
Laws
GREEN AREAS
25. Required Green Area 15 % -
26. Proposed Green Area 18 % -
WASTE GENERATION
27. Municipal Solid Waste Generation 9000 Kg/day
28. Quantity of Hazardous waste 2 Ltr/day
Generation
POWER
30. Total Power Requirement 3000 KVA
31. DG set backup 3 × 750 KVA
CONNECTIVITY
32. Rail Bhubaneswar railway station at 5 Km SE KM
INFERENCES
1. The bus stop has separate entry and exit for the ISBT busses.
6. As this is the Running Project , it has all types of facilities and Comfortabilites are
present as per mordern ISBT architectural design requirements.
THANK YOU