SAP PP Training Material

CONFIDENTIAL

Version 2009
Production Planning
Production Execution In Discrete
Manufacturing

Document Name
CONFIDENTIAL
Introduction

Contents

• Production Order Overview


• Production Order – Concept
• Elements of Production Order
• Different Ways of Creating Production Orders
• Order Creation with Planned Orders
• Data Flow in Order Creation
• Capacity Calculation
• Production Order Release Process

Document Name
CONFIDENTIAL
Production Order Overview

• Production order management is a


central component of a complex
process chain that starts with
independent requirements (planned
or customer requirements) and ends
in the issue of a finished product.

• Production order management only


controls the whole process of in-
house production.

• Production order processing includes


Goods Issue & Order Confirmation

Document Name
CONFIDENTIAL
Production Order Concept

• Production activities in Shop floor are executed with reference to


Production order

• SAP production order consists of

– Material to be produced
– Production Location (work center)
– Time (Start, Finish times, etc)
– Operation instructions, Components, PRT’s assigned to operations
– Planned production costs

Document Name
CONFIDENTIAL
Production Order Overview

• Orders are one category of business transaction.

• Orders are divided up according to order category, as it is possible to have different


orders within the different applications.Like PP production order , PP process order , PS
network & CO internal orders

• The system predefines fixed order categories for each application.

• An order type is used to control different processes

Document Name
CONFIDENTIAL
Production Order Overview – Master Data
• Master Data In Production Order

Procurement Type E – The material is produced in-house.

Procurement Type X – The material can be both produced in-house and procured externally

.
Procurement Type F – The material is procured externally Document Name
CONFIDENTIAL
.
Production Order Status
• Status Management

• Following are the status types which are being used in production order

– System Status –

• Internal system status


• Can not be influenced by the user
• Fixed quantity of predefined statuses
• Fixed sequences for the assignment of status

– User Status –

• Freely definable , with no limit to amount


• Set by user
• Linked via status profile

Document Name
CONFIDENTIAL
Production Order Cycle

Document Name
CONFIDENTIAL
Different Ways Of Creating Production Orders

Document Name
CONFIDENTIAL
Capacity Calculations

• Production Order calculates required capacity.

• Daily available capacity is calculated with reference to work center capacity


view

Document Name
CONFIDENTIAL
Material Reservation
• When production order is created, the components assigned to the production order are
reserved.
• The purpose of a reservation is to ensure that a material will be available when it is needed.
It also serves to simplify and accelerate the goods issue process and prepare the tasks at
the point of goods issue.
• A reservation for goods issue can be requested by various departments for various account
assignment objects (such as cost center, order, asset, etc.).
• In a reservation, information is stored that is relevant for the goods issue and for materials
planning, for example:
– What? (which material?)
– How much? (in which quantity?)
– When? (for which requirement date?)
– From where? (from which plant or warehouse?)
– To where? (to which recipient or customer?)
• When a reservation is entered, the following events occur in the system:
– The system creates a reservation document, which serves as proof of the request.
– In the material master record, total stock and unrestricted-use stock of the material
remain unchanged. Reserved stock is increased by the reserved quantity.
– In MRP, available stock is reduced by the reserved quantity. This is visible in the
current stock/requirements list. The reservation causes an entry to be made in the
requirements planning file.
Document Name
CONFIDENTIAL
Production Planned Cost

• Calculates cost before manufacturing


• Planned production cost is get calculated based activity cost and
production overheads.
• Planned Material cost get calculated from BOM and material
overhead.
Document Name
CONFIDENTIAL
Material Availability Check

• Material availability check for all BOM Components.

• You can carry out an availability check either for the entire order, or for an
individual material component in the order.

• The system carries out an availability check. If material components are not
available on their requirements date, the system activates the status "material
shortage" in the production order.

• If you make changes in an order, which could affect the availability of its
components (for example date or quantity changes), this does not
automatically trigger a new availability check. For up-to-date information on
any missing parts in an order, you should restart the availability check
manually after you have made the changes.

Document Name
CONFIDENTIAL
Production Order Release

• Once you released


production order following
activities can be performed :
– Shop floor papers can
be printed.
– Goods movements for
the order can be
executed
– Confirmations for the
order can be
executed.

Document Name
CONFIDENTIAL
Manual Creation of Production Order - With Material

• Path : Logistics->Production
->Shop Floor Control -> Order ->
Create

• T-Code : CO01

Document Name
CONFIDENTIAL
Create Production Order – Check Capacity

Enter Manually

Enter Order Quantity & Start or Finish Date manually.


Document Name
CONFIDENTIAL
Create Production Order – Check Capacity

Document Name
CONFIDENTIAL
Create Production Order – Check Material

Document Name
CONFIDENTIAL
Create Production Order – Release Order

Document Name
CONFIDENTIAL
Create Production Order – Release Order

Once you released the order status get changed to REL.


Document Name
CONFIDENTIAL
Goods Movements In Discrete
Manufacturing

Document Name
CONFIDENTIAL
Introduction

Contents

• Goods issue to production order (GI)


• Goods receipts to production order (GR)

Document Name
CONFIDENTIAL
Production Order Goods Issue (GI)

• SAP Slide

Document Name
CONFIDENTIAL
Production Order Goods Issue (GI)

• Goods Issue for production can done in one of the following way :
– Automatic (Backflush) – confirmation automatically post goods issue for
components
– Manual – Operator will post Goods Issue for production order

• Stock and consumption fields are updated at the storage location level.

• The component reservation is reduced.

• The actual costs are determined and updated in the order.

• If the material withdrawn does not have a reservation, then it is an unplanned issue.
Example: Material withdrawn as a replacement material.

• Goods issues can be posted only if movement for the reservation is allowed. For
example, an order status of created but not released, blocked or technically
complete disallows such movement.

Document Name
CONFIDENTIAL
Production Order Confirmation
• Production Order confirmation is used for entering activities carried out within your company for
an order.

• Production order confirmations enable you to monitor the progress of work carried out for a
production order.

• With a confirmation you specify


– The quantity in an operation that was produced as yield, scrap and the quantity to be
reworked
– How much work was actually done
– Which work center was used for the operation
– Who carried out the operation

• The following business transactions can be executed via confirmations:


– Updating order data (for example, quantities, activities, dates, status)
– Backflushing of components
– Automatic goods receipt (for one operation per order max.)
– Capacity reduction in the work center
– Updating costs based on confirmed data

Document Name
CONFIDENTIAL
Production Order Confirmation Types
• Most widely used confirmation are :

• For an Operation

– You have the following options:


• To confirm quantities, durations, activities or personnel data, enter a time ticket
confirmation or a progress confirmation.
• To make a confirmation at a particular point in time (for example, at the start of setup
or the finish of processing) enter a confirmation for a time event.
• When you confirm time events, the system calculates the required duration. For
example, the setup duration is the time between setup start and setup finish.

• For an Order

– If you enter a confirmation at order header level, the system confirms all the operations
that have a control key in which confirmation is optional or necessary. The quantities
confirmed in the operations are proportional to the quantities confirmed in the order
header.

Document Name
CONFIDENTIAL
Production Order Confirmation

Document Name
CONFIDENTIAL
Goods Movement

Document Name
- 30 -
CONFIDENTIAL
Goods Receipt From Production Order
• Goods receipt from production can be posted either manually or automatically.

• Automatic goods receipt can be controlled specific to either operation (operation


control key) or material (production scheduling profile).

• When we do goods receipt manually againt production order, we need to specify:


– Plant
– storage location
– stock type
– final delivery indicator

• Material and accounting documents are assigned according to their numbers.

• The delivered quantity can be updated in the order.

• The inward movement of material is valuated.

• The order is credited.

• The plant activity account is updated


Document Name
CONFIDENTIAL
Goods Receipt From Production Order

Document Name
CONFIDENTIAL
Goods Receipt From Production Order

Document Name
- 33 -
CONFIDENTIAL