THE VARIOUS SYSTEMS PRESENTLY USED ARE:
SAP
ERP
WMS
RFID
⚫ Perpetual Inventory
⚫ Bin Audit
⚫ Dock Audit
INVENTORY
Reduces Inventory MinI
N
changes
SUPPLIERS RECEIVING STORES
Card
Card Card Card Card
Card Card
Transport
CardCarCd
ard
Transport
CARD DROP
BOX & TRIGGER
Welding assy cell
ASSEMBLY
Fix “KANBAN CARD” On Carton Box
D1 Team
Small group
Product/process knowledge
Team leader
Team synergy
Remove ICA
Implement decision made at D5
Cross functional participation
Update all the documents, procedures etc
Train the workforce
Seek feedback from the customer
Objectives
D7 Prevent recurrence
Modify necessary systems (Practices/Procedures) to prevent
recurrence of
this problem or a similar problem
The goal is to change the system that allowed the problem to
occur in the first place
Enables lessons learned can be shared
Conserves resources by saving rework on other problems
D8 Recognize Team
Complete the team experience
Sincerely recognize both team and individual contributions
Encourage a repeat of the behavior
Title
G8D Report-Illustration Date Opened Last Updated
Multi m o d e l part shipment. 12-10-2001 15-10-2001
Product/Process Information Organization Information
Receiving Pr o ce ss TVSLL-KDPP
Dø Symptom(s) Multi m o d e l part w a s sh ippe d a s S e a
D ø E m e r g e n c y R esp o n se Action(s) % Effective Date Implemented
1. Intimated S C M 100% 12-10-2001
2. Reversal of S E A shipment.
D1 Te a m ( N a m e , Profs, Dept., Pho n e) D2 Problem Description
Champion: Prasad, M P & L Mult i- mod el p art n o X S 6 1 - 1 8 K 5 7 9 - D C 1 8 0 n o s sh i p p e d in
Tea m Leader: S e a container instead of multi-model shipmen t
Arunachalam Tea m
Members:
S a m p a t h - M P & L analyst
H e m a n t h - Receiving Analyst
Parthasarathy - Receiving C h ec k e r
D3 Interim Co ntainment Action(s) % Effective Date Implemented
Followed up with S C M an d diverted 100% 12-10-2001
material f r o m M a i n Plant.
D4 Root Cause(s) % Contribution
L a c k of P r o c e s s c o n t rol m e a s u r e a f f e c t e d re c ei v i n g c h e c k e r ' s ability t o c o n c e n t r a t e 100%
D5 C h o s e n P e r m a n e n t Corrective Action(s) % Effective
1. Different receiving color t ags for multi m o d e l s h i p m en t parts.
2. Receiving Flag will b e r a i s e d in C M M S 3 b y M P & L analyst 100%
3. M P & L analyst will track the multi m o d e l parts
D6 I m p l e m e n t e d P e r m a n e n t Corrective Action(s) Date Implemented
1. Different receiving color t ags for multi m o d e l s h i p m en t parts.
2. Receiving Flag will b e r a i s e d in C M M S 3 b y M P & L analyst
3. M P & L analyst will track the multi m o d e l parts 15-10-2001
D7 Prevent Recurrence Date Implemented
1. Reg ul ar a w a r e n e s s training.
2. Multi m o d e l sh ip ment information to consolidators. 15-10-2001
D7 Systemic Prevent recommendations Responsibility
Multi m o d e l sh i p m e n t part labels to be color c o d e d b y supplier MH&PE
D 8 T e a m a n d Individual Re c og n i t i o n Date Closed Reported By
P e r s o n a l l y t h a n k e d all t he t e a m m e m b e r s 15-10-2001 A.Arunachalam