Controls & Planning Management Plan Short Form v4
Controls & Planning Management Plan Short Form v4
Page 1 of 2
PLAN Instructions: The red text identifies the areas for completion.
<Projects can modify standard C&P
Issue Date XX____________
Prepared By XX____________
PHASE
assign R/A/C/I> intentions>
LEVEL 1 Schematic Summary Program (SSP)
LEVEL 2 Summary Reporting Program (SRP)
EXE
R [insert Position from Org Chart] REQUIRED: Tender Final Review; At Project Baseline
R [insert Position from Org Chart]
REQUIRED: Tender Final Review; At Project Baseline
REP
PROGRAM PURPOSE: Key high level document to PROGRAM PURPOSE: Reporting planned and actual dates for
TIN
near critical paths as captured in the L3 IMP PROGRAM RELATIONSHIP: Dependent on Level 3 program
RESPONSIBILITY: Planner
VEL
SUMMARY
ATE
REQUIRED: Tender Final Review; At Project Baseline Establishment; Updated for Monthly Contract Review R [insert Position Title from Org Chart on P2]
M
PROGRAM RELATIONSHIP: Underpins forecast final cost. Sets framework for Level 4 and Level 5 A [insert Position Title from Org Chart on P2]
RESPONSIBILITY: Planner
GEM
FORMAT: Bar Charts using Primavera P6 and Key Production Measure S-Curves / Histograms generated using
L3
ENT
Primavera P6 / MS Excel
C [insert Position Title(s) from Org Chart on P2]
TYPICALLY DEVELOPED BY: Planner in consultation with functional leads (e.g. Design, Procurement,
LEVEL 3
LEV
INTEGRATED Construction). I [insert Position Title (s) from Org Chart on P2]
EL
MASTER PROGRAM
planning to support the coordination and PROGRAM RELATIONSHIP: Detailed L5 CEP to achieve L4 CEP
RK
delivery of logistics (e.g. Approvals, design, targets. Planning parameters set by L4 Execution Programs.
LEVEL 5 Construction Execution Program (CEP)
FRO
L4
LEVEL 4 Construction Execution Program (CEP)
procurement, materials, labour, etc) to RESPONSIBILITY: SPE / Project Engineer C [insert Position(s) from Org Chart]
[insert Position from
NT
EXECUTION PROGRAMS PROGRAM RELATIONSHIP: Planning TYPICALLY DEVELOPED BY: Project Engineer(s), Site
ANA
parameters set by L3 IMP. May Engineer(s), Design Team Leader(s) I [insert Position(s) from Org Chart]
GEM
Analysis
Schedule
Identify all KPMs across all phases to ensure
Production
Earthworks
Report Title
adequate performance management coverage
Performance
KPM S-Curves
KPM S-Curves
over the project life and list in this table>
Accommodation
<Review LCPL and BU Reporting Requirements
and list major / summarised requirements in this PHASE
[INSERT
PLAN
table. Note which Level it relates to and who
REQUIREMENTS
has the responsibility using the position title
Level
Level 5
Level 3
Level 4
Level 3
Weekly
Level 3
Level 3
Monthly
Monthly
Program
from the simplified org chart>
Level and
Frequency
INTERNAL REPORTING
in callouts.
BCM
Beds
KEY PERFORMANCE MEASURES
KEY PERFORMANCE MEASURES
Responsible
Area Planner
Area Planner
Lead Planner
Lead Planner
Also see promptsPROJECT
Design Planner
(Cut/Fill/Import)
Logistics Planner
Unit of Measure
XX
XX
Report Title
CRA/PCA Ref
REQUIREMENTS
REQUIREMENTS
XXXXX
Damages (LD’s)
XXXXX
Program
•Part E – Section 2 – LCPL Business Standard
Level and
Frequency
C&P CONTRACTUAL
Risk Issues
•(1/15 Delay; 1/24 Design .2 Client Review .5
EXTERNAL REPORTING Proceed at LCPL Risk 1/33.3 Work Rosters)
XXXXX
XXXXX
•Part B – Section 1 – Time and Cost
Entitlements; Section 5 Liquidated Damages;
Responsible
Section 7 Liability
CRA/PCR Comment
Scheduler
Scheduler
Lead Planner
Planner
Area
3
3
Engineers
Engineers
Direct
Direct
x
SPE’s x
<Insert a schematic month end progress cycle and in the R/A/C/I tables on page 1>
Construction
Construction
Area
Area
x
x33
CONTROLS & PLANNING MANAGEMENT
Area Design
Design
Leads
Leads
Coordinator’s
Coordinator’s
Design
Design
Design
Design
Manager
Manager
Manager
Manager
Procurement
Procurement
Logistics
and Logistics
Expediters
Expediters
XX
XX
Procurement
Procurement
Approved By XX____________
Prepared By XX____________
Issue Date XX____________
Revision No. XX____________
indirect FTE>