EcoStruxure Performance Dashboard

Formulas used to calculate values in the dashboard


February 2020

Confidential Property of Schneider Electric


Purpose

The purpose of this document is to explain how the bFO


data are sourced, filtered and transformed to show the
final figures in the EcoStruxure Opportunities dashboard.
For now, this detail of information is not directly accessible
from the dashboard itself.

Confidential Property of Schneider Electric | Page 2


General consideration on the technology
The dashboard is built with Einstein Analytics technology, which is the analytics tool imbedded in bFO.

The data is sourced exclusively from bFO. It’s gathered in a dataset which is calculated and updated every time the
dataflow runs.

On top of that, a lens is used to apply filters and grouping and generate the final results shown in a graph or table. The
lenses are built in SAQL language and are not directly visible from the dashboard. Here after some examples:

Example1: Lens definition for Scorecard EcoStruxure Won Opportunities

Example2: Lens definition for Closed Opps by Status

Confidential Property of Schneider Electric | Page 3


Technical field to recognize EcoStruxure Opportunities

According to EcoStruxure Business Rules, an Opportunity is recognized as EcoStruxure if


• CONDITION1: Its Opportunity Scope Attribute contains an EcoStruxure value
AND
• CONDITION2: One of its referenced Product Line is one of the Product Line or one of the Advisor recognized as
EcoStruxure

• CONDITION1 is easy to check. And there is an automatic EcoStruxure flag for Building, Machine, IT and Plant
domains.
• CONDITION2 is not direct and to overcome that we created 2 technical fields :
Opportunity EcoStruxure Domain and Opportunity Line EcoStruxure Domain.
• They are populated automatically by an overnight batch that check the value of the Product Line.
• They are valued by “EcoStruxure Grid”, “EcoStruxure IT” etc “EcoStruxure” word when there is at least one
Product Line that is defined as EcoStruxure according to EcoStruxure Business Rules
• They are hidden fields but can be accessed through reports
• They are updated when an Opportunity is cancelled or updated

Confidential Property of Schneider Electric | Page 4


Data filters
The following filters are applied in all the information shown in the dashboard

• Included in report: Dashboard shows only the opportunities marked as “Included in Reporting”
• To not delete: Dashboard shows only the opportunities marked as “To be deleted = false”
• Included in forecast: yes
• Opportunities whose Opportunity leader is inactive are ignored

• Opportunity Scope Attribute: It has to contain “EcoStruxure” word


• Opportunity EcoStruxure Domain: It has to contain “EcoStruxure” word. See Previous consideration on Data
• Opportunity Line EcoStruxure Domain : It has to contain “EcoStruxure” word. See Previous consideration on Data

• Other filters as Stages, Dates, Status etc are filtered differently in each report. Consult the help online Ii in the
dashboard itself as shown below as example:

Confidential Property of Schneider Electric | Page 5


Visibility & Exchange rate
• Visibility: Everybody see all the company’s data, except for Germany and China data :
• Germany: The Opportunities with Country=Germany are viewable and countable only for Users who belong to
Germany OR for the users who have a reportee who is part of the Opportunity’s team

• China: The Opportunities whom Country=China and Type=Standard are viewable and countable only for the
Users that belong to China OR for the users who have a reportee who is part of the Opportunity’s team

• EA Business Analyst  see all bFO data, including Germany and China. Similar to CEO role.

• Exchange rate : The amounts of the closed or open opportunities are converted from the original currency into a target
currency by using the current date exchange rate (and not the dated exchange rate in effect on the opportunity
close date). This is similar to what is done in bFO.

• Child / Parent:
• The revenue calculation takes into account all the parents which are respecting the rules
• Since July release, In Non-Compliance sections of the dashboard, we consider only the Opportunities lines
where Line type = Parent.

Confidential Property of Schneider Electric | Page 6


Example of bFO Report reproducing EcoStruxure dashboard
rules

In the example, we capture all the Opportunities related to EcoStruxure either in scope
attribute (5) or in Opportunity Line EcoStruxure Domain (6).

After the extraction, this report will typically require manipulating the data to recognize those
which:
- EcoStruxure-compliant (5 AND 6)
- “Non Compliant” (6 but not 5)

Confidential Property of Schneider Electric | Page 7


Data and dashboard refresh
If an Opportunity is modified in bFO, this opportunity will be represented accordingly in the dashboard 2 days after, accordingly to the below
schedule. Last dashboard updates datetime appear on the top right corner of the dashboard

Night Day 1 Night Day 2 Night


User
changes his
Oppty User see his
change

Batch Dash
Times in CET Start End 1am 5 am board 8 am
5am Dashboard 8 am refresh
refresh 3h To flag
(Data replication the
Oppty
during low with PL
activity)

Confidential Property of Schneider Electric | Page 8


Appendix

Confidential Property of Schneider Electric | Page 9


EcoStruxure Domains Triggers and Revenue

PTACB
PTACB OR
OR ESEEP
ESEEP IDSFT
IDSFT
SPSFT
SPSFT
Analytics,
Analytics, OR
OR
OR PTCCB
PTCCB OR ESSMS
ESSMS [[ Advisor
Advisor Digital
Digital Offers
Offers OR
OR OR ISX-Datacenter
OR ISX-Datacenter
Apps
Apps &&
OL)

OR
OR ESMON [[ Advisor
OR
OR PTLVS Advisor Digital
Digital Offers OR ISX-Small
ISX-Small IT
Parent OL)

PTLVS ESMON not


not under
under IDSFT
IDSFT or
or IDPAC
IDPAC Offers OR IT
Services OR Market
Market Segment
Segment = =
Services OR
OR PTFDA OR ESEPC
ESEPC not
not under
under IDOL2
IDOL2 or
or IDMST
PTFDA AND
AND IDMST
Electric OR EcoStruX
OR EcoStruX ITIT Asset
Asset Adv
Adv
OR PTLVB Electric Utilities
Utilities
(on Parent

OR
OR PTFDB OR PTLVB Account AND
PTFDB
OR Account =
= OEM
OEM ]] AND OR any
OR any of
of the
the smart
smart UPS
UPS
OR
OR PTPCL
PTPCL OR PTCTR
PTCTR Account
Account ≠ OEM]]
≠ OEM
OR
OR PTATS
PTATS AND
AND
cial
cial ref:
ref: SMT750C,
SMT750C, SMT750IC,
SMT750IC,
SMT750RM2UC,
SMT750RM2UC,
Whatever
Whatever the
the Market
trigger (on

Market OR OR SMT750RMI2UC,
SMT750RMI2UC, SMT1000C,
SMT1000C,
Segment
Segment SISGT
SISGT OR
OR INMVP
INMVP SMT1000IC,
DBPRD
DBPRD SMT1000IC, SMT1000RM2UC,
SMT1000RM2UC,
PLtrigger

OR DPENS
OR DPENS OR
OR INMVT
INMVT SMT1000RMI2UC,
SMT1000RMI2UC, SMT1500C,
SMT1500C,
OR DBSL2
OR DBSL2 IDOL2
IDOL2
Edge OR INSL2 OR INIBS
INSL2 OR INIBS OR DPENP
OR DPENP OR INSL2
INSL2 SMT1500IC, SMT1500RM2UC,
SMT1500IC, SMT1500RM2UC,
Edge Control
Control OR DBIBS
OR DBIBS
OR
OR INMVP
OR
OR IDPAC
IDPAC
OR
SMT1500RMI2UC, SMT2200C,
SMT2200C,
OR INMVT OR INMVP
INMVT OR INIBS
OR INIBS OR DPSOL
OR DPSOL SMT1500RMI2UC,
EcoStruxure PL

OR
OR INMVE
IDMST
IDMST SMT2200IC, SMT2200RM2UC,
SMT2200IC, SMT2200RM2UC,
OR PTEQP OR INMVE
OR PTEQP OR INMCP
OR INMCP OR PTEQP
OR PTEQP SMT2200RMI2UC,
EcoStruxure

SMT2200RMI2UC,
OR DPENP
OR INMCP OR DPENP
OR INMCP OR INMVE
OR INMVE OR ENSFT
OR ENSFT -- SMT3000C,
SMT3000C, SMT3000IC,
SMT3000IC,
OR DPENS
DPSOL OR DPENS
OR DPSOL
OR OR DPIBS
OR DPIBS SMT3000RM2UC,
SMT3000RM2UC,
OR DPIBS SMT3000RMI2UC, SMC1000C,
SMT3000RMI2UC, SMC1000C,
OR ENSFT OR DPIBS
OR ENSFT SMC1000IC, SMC1000-2UC,
SMC1000-2UC,
Connected
Connected SMC1000IC,
SMC1000I-2UC, SMC1500C,
SMC1000I-2UC, SMC1500C,
Products
Products For
For Non
Non Elec
Elec Utilities
Utilities SMC1500IC,
SMC1500IC, SMC1500-2UC,
SMC1500-2UC,
Market SMC1500I-2UC
Market Segment
Segment SMC1500I-2UC

EcoStruxure
EcoStruxure revenue
revenue Sums
Sums the
the revenues
revenues of
of the
the Parent
Parent Oppty
Oppty lines
lines with
with References
References mentioned
mentioned above
above
declaration
declaration

Total
Total revenue
revenue declaration
declaration All
All Parent
Parent Opportunity
Opportunity Lines
Lines
(including
(including pull-through)
pull-through)

New product line


EcoStruxure
Confidential domain
Property of Schneiderflag automation
Electric | Page 10
Document information
Version Date Dashboard version Author Description of changes
Mikhail Bednyakov
1.0 Feb 2019 Feb Release Initial version
Francette Dunyach

Modify the visibility section to reflect the changes implemented in April


Refresh timeline change (3h instead of 20 hours)
1.1 June 2019 July Release Francette Dunyach
Note on Child / Parent
Business Rules updated

Updated with the new EcoStruxure rules: automatic EcoStruxure flagging for
1.2 Feb 2020 Feb Release Gabrielle Lair
Building, Machine, IT and Plant.

Confidential Property of Schneider Electric | Page 11