Professional Documents
Culture Documents
Jakarta KPI Monitoring Batch2!4!20160601
Jakarta KPI Monitoring Batch2!4!20160601
Roll Out inactivity timer & Trial L2U and U2L parameter
Counters Observation Summary
Roll Out inactivity timer
Reduce Inactivity timer to 10s resulted Service drop rate significantly improve 36 % due to user more
frequently on idle state.
Cell DL throughput slightly degraded, continue monitoring to get more samples.
CPU Load trend increased but still below 50%.
Other KPI are maintained.
All Network, excl Roll Out inactivity timer and monitoring CPU Load after
Batch-2 KOTA DEPOK implementation.
Batch-3 KLP GADING CEMPUT PUSCH Power control and PRACH power optimization
SUNTER will be trial on bigger cluster
Batch-4 KOTA DEPOK Trial L2U and U2L parameter on bigger cluster
Preparation
Execution
Monitoring
3
Summary of Changes Batch-1
Roll Out inactivity timer
4
Summary KPI
Before After
KPI Delta (%) • The statistics exclude weekend,
30-May 31-May
DL Traffi c Volume (MByte) 3243583.54 3208062.78 -1.10 • Filter Busy Hours (5-10 PM)“
UL Traffi c Volume (MByte) 319100.11 332104.77 4.08 • DL and UL Traffic slightly improved.
CSSR (%) 99.83 99.87 0.03
SDR (%) 0.27 0.17 36.12 • Service drop rate improve 36 %.
RRC_Setup SR (%) 99.95 99.96 0.00 • Cell DL throughput slightly degraded.
IFHO (%) 99.70 99.67 -0.02
Cell Downlink Avg Thp (Mbps) 12.40 12.01 -3.17
• User number trend improved.
Cell Uplink Avg Thp (Mbps) 1.33 1.29 -3.33 • CPU Load trend increased but still below 50%
DL Resource 13.85 14.08 1.64
• Other KPI are maintained
UL Resource 15.10 14.97 -0.86
Average User Number 7.05 7.84 11.13
Maximum User Number 114.17 129.67 13.58
5
Traffic Volume (Mbyte)
3500000 350000
3000000 300000
2500000 250000
2000000 200000
1500000 150000
1000000 100000
500000 50000
0 0
6
Cell Avg Throughput
14 1.4
12 1.2
10 1
8 0.8
6 0.6
4 0.4
2 0.2
0 0
• DL Cell average throughput slightly degraded. Continue • UL Cell average throughput slightly degraded. Continue
monitoring to see get more samples monitoring to see get more samples
7
CSSR & SDR
CSSR SDR
16000000 0.4
3.00E+21 100
14000000 0.35
2.50E+21 99.95
12000000 0.3
99.9
2.00E+21
10000000 0.25
99.85
1.50E+21 8000000 0.2
99.8
6000000 0.15
1.00E+21
99.75
4000000 0.1
5.00E+20 99.7
2000000 0.05
0 99.65 0 0
Sum of CSSR DEN Average of CSSR Sum of SDR DEN Average of Service Drop Rate
IFHO SR RRC SR
8000000 100 14000000 100
0 97.5 0 99.88
Sum of IFHO Den Average of IFHO Sum of RRC_Setup SR DEN Sum of RRC_Setup SR
9
User Number
12
150
10
8
100
6
4 50
2
0 0
Average of DL Resource Average of UL Resource Average of Average User Number Average of Maximum User Number
10
CPU Load
CPU Load
70
60
50
40
30
20
10
11
Summary of Changes Batch-4
Trial L2U and U2L parameter (Cluster Kota Depok)
12
Summary KPI
Before After
KPI Delta (%) • The statistics exclude weekend,
30-May 31-May
DL Traffi c Volume (MByte) 208020.81 212873.90 2.33 • Filter Busy Hours (5-10 PM)“
UL Traffi c Volume (MByte) 19202.92 20586.25 7.20
• DL and UL Traffic improved.
CSSR (%) 99.85 99.86 0.01
SDR (%) 0.31 0.39 -26.08 • Service drop rate degraded 26 %.
RRC_Setup SR (%) 99.97 99.97 0.00 • Cell DL and UL throughput degraded.
IFHO (%) 99.54 99.48 -0.06
Cell Downlink Avg Thp (Mbps) 13.38 12.39 -7.42 • User number and Resource trend improved.
Cell Uplink Avg Thp (Mbps) 1.39 1.25 -10.11 • Other KPI are maintained
DL Resource 13.57 14.67 8.15
UL Resource 15.42 16.35 6.07
Average User Number 7.39 8.63 16.72
Maximum User Number 65.00 78.67 21.03
13
Traffic Volume (Mbyte)
250000 25000
200000 20000
150000 15000
100000 10000
50000 5000
0 0
14
Cell Avg Throughput
16 1.6
14 1.4
12 1.2
10 1
8 0.8
6 0.6
4 0.4
2 0.2
0 0
15
CSSR & SDR
CSSR SDR
600000 0.6
1.80E+17 100
1.60E+17 500000 0.5
99.95
1.40E+17
99.9 400000 0.4
1.20E+17
1.00E+17 99.85
300000 0.3
8.00E+16 99.8
6.00E+16 200000 0.2
99.75
4.00E+16
99.7 100000 0.1
2.00E+16
0 99.65 0 0
Sum of CSSR DEN Average of CSSR Sum of SDR DEN Average of Service Drop Rate
IFHO SR RRC SR
450000 100 600000 100
400000 99.98
500000
350000 99.5 99.96
99.94
300000 400000
99 99.92
250000
300000 99.9
200000
98.5 99.88
150000 200000
99.86
100000 98 99.84
100000
50000 99.82
0 97.5 0 99.8
Sum of IFHO Den Average of IFHO Sum of RRC_Setup SR DEN Sum of RRC_Setup SR
17
User Number
Average of DL Resource Average of UL Resource Average of Average User Number Average of Maximum User Number
18
RRC and ERAB Drop Caused
0 0
Sum of LRRCSetupFailResFail Sum of LRRCSetupFailNoReply Sum of ERABAbnormRelRadio Sum of ERABAbnormRelTNL Sum of ERABAbnormRelCong
Sum of ERABAbnormRelMME Sum of ERABAbnormRelHOFailure Sum of ERABFailEstNoReply
Sum of LRRCSetupFailRej Sum of LRRCSetupFailResFailSRS
Sum of ERABFailEstMME Sum of ERABFailEstTNL Sum of ERABFailEstRNL
Sum of LRRCSetupFailResFailPUCCH Sum of LRRCSetupFailRejFlowCtrl Sum of ERABFailEstNoRadioRes Sum of ERABFailEstSecurModeFail
• RRC Setup Success Rate Maintained. • ERAB failure mostly caused by handover failure and
radio condition due to more user camp on LTE nerwork.
19