GEOTECHNICAL INVESTIGATION
Elevation (m)
60
50
30
PORT WORK RECLAMATION
WORK
20
N = 9 to 34
10 Elev. + 4.50 m Elev. + 4.50 m 42
48
Sea Level 60
0
to 14 > 60
N =2
-10 N = < 2 to 4 N = 3 to 7
N = 48
Soft & Loose Material deposits Elev. - 22.30 m 37
0 60
-20 N = < 2 to 6 7 to 1
BED ROCK N=
N > 60 BED ROCK
N = 28 to 41
-30 Elev. – 39.00 m
N > 60
N > 60 (Kampung Baru Formation)
-40
N > 60
-50
-60
PORT CONSTRUCTION
RECLAMATION WORK
Port Construction :
Steel Pipe Pile = 992 nos Reclamation Work :
Concrete = 15.059 cum Steel Sheet Pile = 725 nos
Fender = 123 unit = 20.300 lm
Bolard = 36 unit Concrete = 2.256 cum
Tie Rod = 120 nos
Embankment = 659.000 cum
Riprap = 13.700 cum
DREDGING WORK
Dredging Work : 67.979 cum
EARTH WORK
Elev. - 22.30 m
Elev. – 39.00 m
16
GENERAL PRESPECTIVE VIEW
Earth Work :
N W ORK
TI O
ECL AMA Dredging Work
R
C TI ON
NS T RU
O
Dredging Work
R TC
PO
BACK TO
LIST OF
CONTENT17
13
TEMPORARY FACILITIES :
1. Batching Plant
Ac
ce
11
ss
10 2. Work Shop Precast Area
Ro
ad
3. Contractor Office
To excavation area
9 4. Owner Office
6 8 5. Steel Pipe Pile Stock Yard
7 6. Prayer Room
3
4 7. Fuel Tank
12
8. Genset
Temporary Jetty
9. Ware House
Reclamation
tage 1
Barge
BACK TO
CONSTR.
METHOD
18
FILL
1.32 jt m3
CUT RECLAMATION
2.45 jt m3 660 rb jt m3
DUMPED
470 rb m3
19
+0,00
+4,00
+15,00
+25,00
+58,00
20 +11,00
21
PORT CONSTRUCTION EART WORK
22
RECLAMATION WORK
Elev. + 4.50 m
Elev. - 22.30 m
23
RECLAMATION WORK
Elev. + 4.50 m
Elev. + 2.60 m
Elev. - 22.30 m
24
RECLAMATION WORK
Reclamation up to 50 cm
Above + 2.60 MHWS
32,5
32,5 M
M
25
RECLAMATION WORK
1.00 m
1.00 m
SSP III
5.00 m
3.50 m
3.00 m
Reclamation up to 50 cm
20.00 m Above + 2.60 MHWS
SSP III
Concreting Anchor Block
26
RECLAMATION WORK
Elev. + 4.50 m
32,5
32,5 M
M
Elev. - 22.30 m
27
RECLAMATION WORK
Elev. + 4.50 m
Elev. ± 0.00 m
Elev. - 1.50 m
BACK TO
CONSTR.
METHOD
28
PILING WORK
CONCRETE WORK
ACCESSORIES WORK
29
FLOW CHART OF PILING WORK
START
Test !
Transport to Site
Piling
Test !
Finish30
METHOD OF PILING WORK
From Cilegon
From Surabaya
Stock Yard
Pipa Baja
Lounching Pipe
PORT CONSTRUCTION
Stock Yard OF
Steel Pipe
See Welding
35˚ Work
Piles to be
jointed
12 mm Backing
1.5 mm
1 – 2 mm
Back
12.0 mm
2.6 mm
LB 52
ROOT PASS WELD
1 – 2 mm 33
34
WHARF CONSTRUCTION
35
WHARF CONSTRUCION
CC
AA
SS
TT
II
NN
GG
PP
LL
AA
TT
36
WHARF CONSTRUCION
PRECAST SLAB
CAST IN SIDE
B
ST SLA
PRECA
1.500
PRECAST SLAB
2.000
Steel Pipe Pile
Dia. 711 mm Deep 12 mm
37
WHARF CONSTRUCION
38
WHARF CONSTRUCION
Cross Section A - A
CAST IN SITE
4.550 4.550
DETAIL B 39
WHARF CONSTRUCION
CAST IN SITE
Back
CAST IN SITE
40
ACCESSORIES WORK
41
ACCESSORIES WORK
42
ACCESSORIES WORK
INSTALLATION STEPS OF
AUXILLIARY FACILITIES
(BOLLARD)
43
GENERAL WORK
44
GENERAL WORK
i. Quality of Air
- CO, SO2, NOx Method : West Gaeka, Saltzman method
Equipment: Impinger, spectro photometer
- Dirt Method : Scattered light/filter weight method
Equipment: Digital Aerosol meter/Filter holder
B. Biology
Biota laut-kekeruhan Method : Residual weight of solid in filtered
Equipment : Photometer 45
GENERAL WORK
46
PELAKSANAAN PEMBANGUNAN
DERMAGA
DERMAGA PANARUKAN
DERMAGA PETIKEMAS
TANJUNG PERAK
DERMAGA PETIKEMAS TANJUNG
EMAS
DREDGING
PENGARUH PEMANCANGAN TIANG
PONDASI PADA LAPISAN TANAH
LEMPUNG DISEKITARNYA
Cohesive Soil
T = periode = 1 cycle
f = frequency = 1/T
A = amplitude
t = time
N = number of cyclic
Z = stress or strain
D
7 s/d12 D
D
3 s/d 5 D
Dipengaruhi oleh :
- Cation Exchange Capacity (meq / 100g)
2
- Specific Surface (m / g)
- Bentuk partikel (dimensi < 0,002 mm)
- Liquid Limit (%)
- Association & Orientation Of Particles
- Menurunnya kembali pore water pressure
WAKTU TUNGGU SEBAGIAN BESAR KEPULIHAN
KETAHANAN MEKANIS TANAH SETELAH SELESAI
DIPANCANG / DIBOR