Professional Documents
Culture Documents
• Alternators have to be run for a short time in parallel to change over load from one to another
• For synchronising, Voltage, Frequency and Phase sequence of the incoming generator has to
be same as that of the generator already connected to the busbars.
• Fine tuning of synchronising can be done with the help of Synchroscope and or Synchronising
Lamps.
• The total load on the busbars (KW and KVAR) is to be shared by the generators after
synchronising.