Session 1.8.1
:
Maintenance
Activities - ENTER LOGO
A simplified
approach
Copyright © 2018 by <enter author(s) and/or organization.> All rights reserved.
This presentation or any portion thereof may not be reproduced or used in any manner whatsoever without the express written permission of the author or rights holder.
AN INITIATIVE OF PRODUCED BY
C O N TA C T
ENTER LOGO
ENTER LOGO
Maintenance Works
High Risk Complex
Risk(Job
Detailed Assessment
Safety Study (RAS)
Analysis) Extensive
Result
Incomplete Unmanageable
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 3
Objective
The objective of this presentation is bi-fold:
1. To present a Risk Assessment Study (RAS) for
maintenance activities which will be as analytical as
possible but also, easy to compile, use and update
2. To present several tools for recording the results in a
user-friendly manner in the RAS Sheets
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 4
Maintenance Activities in Phases
Preparation Infrastructure works management
• Target (machinery, equipment, building, installations etc.)
• Procedures, guidelines
• Hardware (tools, chemicals, PPE, LOTOTO, spare parts etc.)
• Maintenance area preparation (evacuation, traffic control, signage etc.)
• Maintenance target (machinery, equipment, installation, building etc.)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 5
Maintenance works special
characteristics
Maintenance works
• Lack of housekeeping
• Mentally & physically demanding activities
• Specialized knowhow
• Task complexity
• Repeated tasks
• “Non-productive” work
Maintenance personnel
• Moves in all areas
• Move outside the premises
• They are potentially involved in all installations & equipment
• They believe that since they are usually highly skilled they possess
the knowhow to execute their works safely
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 6
Maintenance works (MW)
combination of risks
Risks Analysis
MW
Area- Job/Task -
hazard-
related related
related
Energy-related
Workstations
Regular • Physical
• Chemical
Non-working • Radiation etc.
areas
• Confined spaces
• Roofs etc. Non-regular Behavioral
Outdoor areas
Specialized
Psychosocial
Off-site knowhow
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 7
RA Methodology Process
Specifications
Maintenance-specific
Maintenance RA Special
Outside works Special works
works equipment
Laceration, burn,
fracture, death,
coma, …
Consequences
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 9
The Risk Assessment Decision Focus
Based on
1. Knowledge
2. Past
Probable experience
Incident
Scenario
Identification
Consequences
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 10
Hazard (Source) list
(accidents – occupational diseases)
1. Floors 11. Loads
2. Hot/ cold objects 12. Confined Spaces
3. Chemicals 13. Low density materials
4. Machinery 14. Pests, animals, rodents
5. Tools (hand, power) 15. Microorganisms
6. Equipment 16. Microclimate
7. Network lines (cabling, 17. Workplace organization
piping, ducts etc.) 18. Work organization
8. Installations (psychosocial)
9. Structural installations 19. Combustibles + ignition
sources
10. Vehicles
20. Behaviour
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 11
Danger list
(accidents – occupational diseases)
1. Slipperiness 11. Pressure 21. Low density
2. Obstruction of 12. Vacuum 22. Poor illumination
movement 13. Noise 23. Air draught
3. Height difference 14. Poor visibility 24. Vibration
4. Temperature 15. Radiation 25. Sedentary/ static
extremes 16. Electrical voltage work
5. Reactivity 17. Asphyxiating 26. Monotony
6. Movement/ Inertia atmosphere (lack 27. Stressfulness
7. Sharpness (edge/ of O2/ toxic 28. Intensiveness
point) substances 29. Storage height
presence) 30. Center of gravity
8. Particle release
18. Humidity position
9. Tension (belt/
19. Insufficient
spring) ventilation
10. Weight 20. Infectiousness
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 12
Probable Incident Scenarios list
(Maximum 17)
1. Slipping at (& falling at/ to/ from) 10. Swallowing of objects/
2. Tripping/ stumbling at (& falling chemicals
at/ from/ to) 11. Exposure to biohazards
3. Bumping/ knocking/ hitting into/ 12. Fire
against (protruding) objects/ 13. Explosion
surfaces at the same level 14. Entrapment/ asphyxiation by
4. Hit/ struck/ crushed by falling/ low density/ asphyxiant
moving objects materials
5. Falling from another level 15. Overexertion
6. Contact with elements under 16. Exposure to adverse working
voltage environment (microclimate,
7. Contact of the skin/ eyes with physicochemical agents)
sharp/pointed objects 17. Working under adverse
8. Contact of the skin/ eyes with psychosocial conditions
hot/ cold surfaces/ chemicals
9. Inhalation of chemicals
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 13
Risk Assessment Study
The 10-step process
1. Area/ Operations identification
ORGANIZATION +
2. Determination probable incident scenarios/ area & operation
ASSESSOR
3. Identification of the affected employees
MANAGE-
9. Implementation followup
MENT
10. Review & feedback
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 14
RA Measures Categories/ List
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 15
The RAS Process Stages
Per Area
Less
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 16
RA Sheet Example
Per Area (valid for all works performed in the area)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 17
RA Example
Per Area (valid for all works performed in the area)
18
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 18
RA Sheet Example
Per Hazard (valid for all works performed using the hazard source)
19
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 19
RA Example
Per Hazard Source (valid for all works using the hazard
source)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 20
RA Sheet Example
Per Task (valid for all Jobs conducted by all
Specialties)
21
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 21
Simplified RA Methodology for
Maintenance
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 22
•The
The Line of Thinking
Maintenance & the
Works RAS must Principle
specify preventive
measures for all Tasks performed
• Maintenance Job Tasks are more than one thousand
• However, the Probable Incident Scenarios are limited
(maximum 17)
• Some Probable Incident Scenarios are already
identified during the previous Risk Assessment Stages
and need not be repeated for each Task
• Therefore, one can develop a RAS per Probable
Incident Scenario which would include all
applicable Job Tasks of each specialty excluding
the scenarios already identified in the General
RAS.
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 23
Risk Assessment Study
The MW Task Analysis 10-step process
3 1.1.Specialties/ job positions recognition
ORGANIZATI
Area/ Operations identification
+
ASSESSOR ON
1.2. 2. Determination
Determination of all maintenance
of probable tasks/ area
incident scenarios/ job/ &
joboperation
position
ORGANIZATION
2. 3. Determination probable incident
3. Identification scenariosemployees
of the affected FOR ALL APPLICABLE
TASKS/ JOBS
4. Description of the health effects
ORGANIZATION +
ASSESSOR
5. Description of the recommended measures
MANAGE-
9. Implementation followup
MENT
10. Review & feedback
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 24
RA Sheet Example
Per Job (valid for all job tasks)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 25
RA Sheet Example
Per Task (valid for each Job)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 26
Total Risk Assessment Study
Number of RA
Number of RA
Sheets = few
Sheets = few 100eds
1000ands
(Avg. = 400)
(Avg.=13500)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 27
RA Sheet Example
Per Job (valid for all job tasks)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 28
RA Sheet Example
Per Job (valid for all job tasks)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 29
RA Sheet Example
Per Job (valid for all job tasks)
3,5,7,11,12,16,17,18,20
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 30
RA Sheet Example
Per Job (valid for all job tasks)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 31
RA Sheet Example
Per Job (valid for all job tasks)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 32
RA Sheet Example
Per Job (valid for all job tasks)
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 33
The simplicity of the updating
process
(through a RA Sheet Example)
If a job/ task is added, removed, changed, then …
1. Change the job/ task list
2. Add/ remove the incident scenario task list box
3. Update the data only in the applicable fields
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 34
Conclusions
• Maintenance activities are so complex that, in order for risk
assessment study (RAS) to be effective, it should be conducted
per Task, which demands excessive resources if conducted
with the conventional methodologies.
• These methodologies can be simplified if the safety expert
takes into account that, instead of conducting a RAS per Task,
they can instead conduct a RAS per Probable Incident Scenario
excluding the ones already covered by more general versions
of the RAS.
• The achieved volume as well as time savings may reach 80%
thus making the RAS easier to conduct as well as more
manageable by the target Organization.
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 35
Copyright © 2018 – Do not use without permission or proper licence from the author or rights holder. 36