Agenda

› Overview
› Ericsson High Capacity BSC
› Ericsson High Density BSC
› BSC Hardware Dimensioning Principles

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 1


Agenda
› Overview

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 2


GSM RAN

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 3


Market Drivers and Operators Challenges
• Networks
more
operational
efficient
› Market Drivers Efficiency
– Increased complexity on services
– Multivendor enviroment
– Shorter product life cycle Business Operators Network
– More advanced technologies growth challenges evolution

• by improving • to meet
subscribers current
revenue and future
demand

Growth, Efficiency and Network evolution


BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 4
Driving forces and benefits for the new BSC HW
Benefits
 Price pressure
› Reduced foot print
Competition – Smaller locations needed
– Saved floor space used for other
nodes.
› Less HW to handle
Increasing Drivers for Business
Use of IP new BSC
GSM
– Quicker installation
HW
– Reduced number of spare parts

 Expected  Expected
› New HW well prepared for future
growth Technology life time functionality growth
Evolution
– IP-connectivity HW integrated in the
BSC provides BSC IP environment for
 Allows higher current and future needs.
degree of – New AXE boards designed for future
integration
functionality growth without capacity
degradation

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 5


Ericsson GSM/BSC
Footprint evolution supporting 2048 TRXs

qm
0.5 s

BYB202 BYB501/AXE10 BYB501/AXE810 BYB501/AXE810


GS10/12 GS890 GS890
GDM GEM eGEM

1991 1995 2000 2008


BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 6
BSC PP Life Cycle Plan
Product Packaging

GDM/GEM expansions
High Capacity BSC / BYB501/AXE10 / Compact BSC

LTB 2010-12-31

EGEM expansions
High Capacity BSC / BYB501/AXE10
LTB not defined

Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2012 2013 2014 2015 2016 2017 2018 2019 2020

2009 2010 2011


Delivery period Last Time Buy General
End of HW support (EoHWS) Availability
Customer service support
End of spare part sales (EoSPS) Gn

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 7


Agenda
› Ericsson High Capacity BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 8


BSC AXE 810 History
› AXE 810 was introduced in BSC and BSC/TRC R9.1
› Major evolution with AXE 810 is the introduction of Generic
Ericsson Magazine (GEM)-concept, leading to numerous
benefits in terms of:
– Footprint
– Cabling
– Power savings
› BSC LAN Switch was introduced in R11
– BSC LAN Switch introduces an IP based LAN

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 9


AXE 810 System Components

› Generic Ericsson Magazine (GEM)


› Group Switch GS 890 – distributed and non-blocking
› CL 890 – new clock modules
› One board ET155-1
› Transcoder on CSPB platform
› Integrated RP (RPI)
› DLEB to connect GDM devices

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 10


AXE 810 system hardware

DL- 34

GS 890 RPI
RPI ET155-1

RPI
TRA-R7 RPI
Switch
MUX5
CLM Core
DLEB RPI
DLEB

RPB-S to/from RPI


• New Group Switch
SCB RPI
• New devices
• RPI on each circuit board RPB-S to/from CP

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 11


Generic Ericsson Magazine GEM Concept

AXE 810 Clock magazine


Switch magazine

GEM

Transcoder
ET155 magazine
magazine

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 12


GEM concept

› Based on BYB 501


› Board division: 15 mm
› Each magazine can house:
– Distributed Group Switch Modules (16 K capacity)
– 1-22 device boards (ET155-1, TRA, etc)
– CL 890 clock modules, in device slots
– A pair of maintenance processors
– RP control, support and Ethernet switch

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 13


GEM in BSC High Capacity
1536 Channels
768 Channels
GS 16K + 1CLM in first two GEM GS 16K
E E E E E E E E E E
S S S S
T T T T T T T T T T
C D D D D C C C
X 1 1 T T T T I C 1 1 T T T T C C X X 1 1 1 T T T T T T T T 1 1 1 T T T T T T T T X
B L L L L B B B
D 5 5 R R R R R G 5 5 R R R R D D D D 5 5 5 R R R R R R R R 5 5 5 R R R R R R R R D
- E E E E - - -
B 5 5 A A A A B B 5 5 A A A A B B B B 5 5 5 A A A A A A A A 5 5 5 A A A A A A A A B
R B B B B R R R
P P P P
WW P P WWW P P P

APZ / HSL APG / GDM GEM64K GEM64K PCU RPG

APG40C 3 ET155-1
(IOG20C) 16 TRA
7 PCU
FAN FAN FAN FAN FAN
2 HSL
16 RPG3 3 ET155-1 7 PCU
FAN
16 TRA
2 HSL 16 RPG3 7 PCU
FAN FAN FAN FAN FAN

2 HSL 4K DLEB
16 RPG3 3 ET155-1 7 PCU 16 RPG3
2 ET155-1
2 HSL 8 TRA
7 PCU 8 TRA 7 PCU 16 RPG3
FAN
FAN FAN FAN FAN FAN

APZ 7 PCU 4K DLEB 7 PCU 16 RPG3


3 ET155-1
212 33C 2 ET155-1
8 TRA
7 PCU 8 TRA 7 PCU 16 RPG3
FAN

BFZ 102 109 BFZ 102 105 BFZ 102 102 BFZ 102 102 BFZ 102 101 BFZ 102 101

Mandatory Cabinets Optional Cabinets


BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 14
Benefits with AXE 810

Compared with BYB 501:


› More than 50% reduction of footprint depending on
configuration
› 30 % decrease in power consumption
› 45% reduction of different board types
› 50% reduced number of internal cables

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 15


Highlights GS 890

› Strictly non-blocking
› Distributed, 16 kMUPs per GEM. Implemented as a single
15mm XDB board
› Maximal capacity at normal rate is 128K , scalable in steps
of 16K
› Maximal sub-rate capacity is 128K , scalable in steps of 16
K
› Redundant Architecture, meaning that single faults will not
affect traffic
› TS (Time/space) structure

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 16


Highlights GS 890

› Additional GEM magazines may be plugged in while traffic


is being processed – no traffic disturbances will be caused
› Each pair of DLEB boards has sufficient capacity for the
connection of four GDM magazines, corresponding to four
DL-3 interfaces

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 17


GEM – Group Switch parts

DLEB

DLEB
IRB

IRB
CGB

CGB
XDB

XDB
BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 18
GS 890 connection to GDM & GEM

DL2: 2 Mbps, 32 timeslots


ET155-1 STM-1
DL3: 48 Mbps, 512 timeslots
ET155-1 STM-1 DL34: 222 Mbps, flexible number
of timeslots up to 2688 in steps
GS890 of 128
(16k) TRA
GDM DL-2
Device
DLEB
DLEB DLHB
Device
DL-3
Device
GDM Device
DL-34 GEM
DLHB
CLM Device

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 19


ET155-1 SDH and SONET

Main features:
› One 155 Mbit/s SDH/SONET termination on one board
› ETSI (ITU-T) and ANSI standards
› Optical and electrical STM-1 interface
› Optical OC-3 interface
› 8kHz and 2Mb/s synch signals, with SSM carried by
incoming STM-1
› Network protection, MSP (Multiplex Section Protection)
1+1
› Equipment protection
› Power dissipation < 16 W
› MTBF > 80 years with protection
› EMC Class B

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 20


ET155-1 Connection to transport network

› Simplified connection to Transport Networks (SDH/SONET)


› 63 ETC-5 plus magazines replaced by one ET155
› Large DDF and Terminal Multiplexer not needed
› 126 PDH cables replaced by two cables or fibres

DDF ODF
ETC-E1
ETC-E1
ETC-T1
ETC-T1
ETC-T1
ETC-T1 ET155-1
ET155-1
ETC-E1
ETC-E1 ADM SDH ADM SDH
GS
GS
GS ETC-T1
ETC-T1
ETC-T1
ETC-T1 TM or Network ET155-1
ET155-1 or Network
GS
GS
SDXC SDXC
ETC-E1
ETC-E1
ETC-T1
ETC-T1
ETC-T1
ETC-T1 ET155-1
ET155-1

E1 E1 STM-1 STM-1STM-1

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 21


Transcoders

› Transcoders, TRA R7
› Based on a Common Speech Processing Board (CSPB
2.0)
– Reduced footprint (1 Board)
– Reduced Power (1/3 compared to TRA R5)
– Higher capacity (384 Channels/board)
– Supports all codecs used in GSM systems,
i.e. EFR, FR, HR, Adaptive MultiRate codec (AMR) and AMR-WB

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 22


GDM – half height, compact and flexible

› Regional Processors included


› Multiplexers for DL-3 Group Switch interface included
› Power supply via the backplane
› RP bus available in the backplane
› 16 slots for device boards

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 23


RPG3 Applications

› ITU-T C7
– 4 signaling links per board, 64 kb/s each
– ITU-T standard (Q.703 recommendation)
– Placed in GDM-H magazine
› TRH
- 1 RPG3 handles up to 32TRX’s

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 24


RPP applications

• HSL High Speed Signalling Link ETSI


1 signaling link per board, 2048 kb/s
The link is accessed on a ETC5 board or on a
tributary in ET 155-1
ITU-T standard (Q.2110 (SSCOP), Q.2140
(SSCF) and Q.2144
Placed in GDM-H magazine

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 25


RPP applications

GPH (PCU)
- PCU is needed for GPRS/EGPRS
- 1 RPP board normally handles 150 channels (16Kbit/s) or,
up to 64 channels (64 Kbits/s)

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 26


BSC LAN Switch

The BSC LAN Switch is required:


› Gb over IP
› Abis over IP
› O&M application RPMO
› O&M application GMlog
› SIGTRAN

The BSC LAN Switch is a third party


1 Pair of switches per BSC node.

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 27


High Capacity BSC Block diagram

BSS 06A:
• PGWB is a new HW CP
APZ 212 33C
GS
GS890

introduced to support RP-bus (RPB-S)

Abis Optimization and BSC LAN

Abis over IP
LAN
IO switch ET TRA SIGTRAN PGW
APG40 Summit 48si ET155-1 TRA R6/R7 SLI PGWB

BSS 06B: DLEB

• SLI Board, signalling Payload


Gb/IP
O&M A A” Gb/FR

terminal IP required to A”/IP

support SIGTRAN DLHB DLHB DLHB DLHB


• TRA R7 two times TRA Note: Not all HW shown
GEM

R6 capacity TRH
GPH C7
HSL
(PCU)
GDM
RPG3 RPP
NB
RPG3 RPP

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 28


Agenda
› Ericsson High Density BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 29


High Density BSC
Overview

› Scalable and Expandable


– Up to 4095 TRXs
– Up to 18000 Erlang

› IP Support on all Interfaces

› Excellent In-Service Performance


– Redundant hardware and transmission

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 30


New BSC HW in 07A, overview
› Old HW is replaced with new HW optimized to fit AXE810 building
practice.
› The existing BSC LAN Switch HW is replaced with new HW integrated
with the rest of the BSC HW.
› Next Step in the AXE 810 Evolution
› Hosted in Enhanced Generic Ericsson Magazine (eGEM)

R12 07A
APZ / HSL APG / GDM GEM64K GEM64K PCU RPG BSC LAN Switch
FAN FAN
APG40C 3 ET155-1 TRH,PCU
(IOG20C) 16 TRA IP-conn. TRH,PCU
7 PCU Signaling
FAN FAN FAN FAN FAN
2 HSL FAN FAN
16 RPG3 3 ET155-1 7 PCU
FAN FAN FAN FAN
16 TRA
2 HSL 16 RPG3 7 PCU
Transm. Transm.
FAN FAN FAN FAN FAN Transm.
TRC TRC
2 HSL
16 RPG3 4K DLEB 7 PCU 16 RPG3
3 ET155-1
2 ET155-1 FAN FAN FAN
2 HSL 8 TRA
7 PCU 8 TRA 7 PCU 16 RPG3
FAN FAN FAN FAN
FAN FAN FAN FAN FAN
APZ 7 PCU 4K DLEB 7 PCU 16 RPG3 Transm.
3 ET155-1 CP & IO Transm.
212 33C 2 ET155-1 TRC
8 TRA
7 PCU 8 TRA (2 HSL) 16 RPG3
FAN FAN FAN FAN

BFZ 102 109 BFZ 102 105 BFZ 102 102 BFZ 102 102 BFZ 102 101 BFZ 102 101

Mandatory Cabinets Optional Cabinets Mandatory Optional Optional


Cabinet Cabinet Cabinet

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 31


High Density BSC
Overview

› Low Total Cost of Ownership


– Small footprint
› 1 cabinet BSC supports 1024 TRXs
– Reduced power consumption
› More than 10 % power consumption savings/TRX
› Max 280 mW per Erlang
– Less cooling equipment
– Less cabling

› Latest Generation Plug in Hardware


– APZ 212 55
– APG 43
– TRHB
– GPHB
– GARP2
– STEB
– NWI-E
BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 32
Enhanced Generic Magazine (E-GEM) Subrack with Main
Switches

BYB501
– 19” ETSI
GEM compatible
Dual Fan trays
24 user slots
– 15 mm width
– 50 W
Ethernet stars
– 2 x 1GE/slot
– 2 x 10GE/2 slots Benefits:
 Optimized capacity vs. footprint

 Excellent ISP levels

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 33


High Density BSC
eGEM Technology

› APZ 212 55 as Central Processor


› APG 43 as I/O System
› GPHB for the PCU application
› TRHB for the TRH application
› GARP2 for the PGW application
› GARP2 for the AGW application
› STEB for SS7 Signaling
› NWI-E as Ethernet Interface

Supported from BSS 07B

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 34


APZ 212 55 and APG43
CP and I/O Systems

› CP and I/O Systems in the same magazine

› Ethernet RP bus

› Serial RP bus support as option

› eGEM Technology

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 35


GPHB
GPRS Packet Handler Board

› Plug in HW for PCU Application


R R R R
– Replacing RPP P P P P
P P P P G
P
H

› Capacity (channels per board) B

– 256 EGPRS
– 512 GPRS

› Enabling Future EDGE/GPRS Growth

› eGEM Technology

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 36


TRHB
Transceiver Handler Board

› Plug in HW for TRH Application


– Replacing RPG3 R R R R R R R R
P P P P P P P P
G G G G G G G G
3 3 3 3 3 3 3 3 T
R
H
› Capacity (per board) B

– 256 TRXs

› eGEM Technology

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 37


GARP2
HW Platform used for Packet Gateway

› Plug in HW for PGW application


– Replacing PGWB
G
P P

GARP 2
GARP 2
A
G G
R
W W
P
› Capacity (per board)
B B
2

– 200 TRXs

› eGEM Technology

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 38


GARP2
HW platform used for A over IP interface

› Plug in HW for AGW application

› Capacity (per board)


– 900 SCC

› eGEM Technology

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 39


STEB
Signaling Terminal Enhanced Board

› Plug in HW for SS7 Signaling R R R R R R R R


– Narrow-Band NB SS7
P P P P P P P P
G G G G G G G G S
3 3 3 3 3 3 3 3 T
– High Speed Link E
R R R R B
– Replacing RPP/RPG3 HSL SS7 P P P P
P P P P

› Capacity per Board


– All BSC SS7 signaling needs

› eGEM Technology

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 40


NWI-E
Network Interface - Ethernet

› Plug in HW for Ethernet Interface


– BSC Ethernet traffic entry/exit-point BSC LAN Switch
N
W
in I
DataCom cabinet -
E

› Replaces Extreme Summit 48Si


– DataCom cabinet not needed

› GEM and eGEM Technology

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 41


APZ 212 55 and APG 43

e-GEM Magazine
Two monoliths each occupying one
BYB501 magazine 06B 07B
S S
C C A A C A A C
A
B P P P M P P P B
L
APZ - U U A U U -
APG40 A
21233C R B B disk U B B disk R
R
P - - - B - - - P
M
/ A A A B B B /
4 4

CP+AP in one eGEM magazine

• APZ 212 55 is an EGEM based magazine


• APZ 212 55 will be housed besides APG43 in EGEM magazine.
• SCB-RP/4 board is required

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 42


High Density BSC Block diagram
• GPHB for GPH Application
provides the GPH with 4 times the
capacity compare to RPP CP GS
GS890
APZ 212 33C

• TRHB for TRH Application, RP-bus (RPB-S)

provides the TRH with 8 times the BSC LAN

capacity compare to RPG-3


Integrated
GPH
IO LAN ET TRA TRH PGW
• Signaling on GEM HW,
Signaling
(PCU)
switch
STEB

STEB
APG40C ET155-1 TRA R7 TRHB GPHB or SLI PGWB

New HW for SS7 NB signaling and


Payload
HSL Applications, one STEB Gb/IP
O&M A A” Gb/FR
A”/IP
provides all SS7 signaling needed GEM
for any BSC Configuration

• E-GEM Magazine Note: Not all HW


shown

• New IP infrastructure,
substituting the Extreme Switches

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 43


eGEM Boards - Example 1
BSC/TRC 1024 TRX
eGEM 16K GS
S S
eGEM C T T T T T T T T C
E E E E
FAN
B RRR R R R R R B
Clock, AGW X T T I C A T T P P P P C C X
- AAA A A A A A -
TRA R7 D 1 1 R G G 1 1 G GG G D D D
R R
ET155, PGW B 5 5 B B W5 5 WWWW B B B
P RRR R R R R R P
5 5 5 5
FAN
/ 7 7 7 7 7 7 7 7 /
Signaling 4 4
Clock, TRH
PCU, AGW
FAN

eGEM 16K GS
FAN

S S
APZ 212 55 C C
APG43 E E E E
B S S T T T T T G G GG B
X T T I C T T A A C C X
- T T R R R R R P P P P -
FAN
D 1 1 R G 1 1 G G D DD
R E E H H H H H H H H H R
B 5 5 B B 5 5 WW B BB
P BB B B B B B B B B B P
5 5 5 5
/ /
4 4

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 44


eGEM Boards - Example 2
BSC/TRC 2048 TRX
eGEM 16K GS
S S
eGEM eGEM C T T T T T C
E E E E
FAN FAN
B G G G G R R R R R B
Clock, PCU PGW, AGW X A T T I C A T T CC X
- P P P P A A A A A -
ET155, PGW TRA R7 D G 1 1 R G G 1 1 DDD
R H H H H R
AGW ET155 B W5 5 B B W 5 5 BBB
P B B B B R R R R R P
5 5 5 5
FAN FAN
/ 7 7 7 7 7 /
Signaling PGW, AGW 4 4
Clock, ET155 TRA R7
TRH, PCU ET155
FAN FAN

eGEM 16K GS
FAN FAN

PGW, AGW S S
APZ 212 55 TRA R7
APG 43 C T T T T T T T T T C
ET155 E E E E
B R RR R R R R R R B
X T T P P P T T AA A A X
FAN FAN - A AA A A A A A A -
D 1 1 G GG 1 1GGG G D
R R
B 5 5 W WW 5 5 WW W W B
P R RR R R R R R R P
5 5 5 5
/ 7 7 7 7 7 7 7 7 7 /
4 4

eGEM 16K GS
S S
C C
E E E E
B S S T T T T T T T T T G G B
X T T I C T T C C X
- T TR R R R R R R R R P P -
D 1 1 R G 1 1 D D D
R E EH H H H H H H H H H H R
B 5 5 B B 5 5 B B B
P B BB B B B B B B B B B B P
5 5 5 5
/ /
4 4

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 45


eGEM Boards - Example 3
BSC/TRC 4095 TRX
eGEM 16K GS
S S
eGEM eGEM eGEM C T T T C
E E E E
FAN FAN FAN
B S S T T T T T T T T RR R B
Signaling TRA, ET155 X T T I C T T C C X
TRA, ET155 - T T R R R R R R RRAA A -
Clock, ET155 PGW, GPHB D 1 1 R G 1 1 D D D
GPHB R E E H H H H H H HH R
TRH, TRA AGW B 5 5 B B 5 5 B B B
P BB B B B B B B BBRR R P
5 5 5 5
FAN FAN FAN
/ 7 7 7 /
Signaling TRA, ET155 TRA, ET155 4 4
Clock, ET155 PGW, GPHB PGW, GPHB
TRH, TRA AGW AGW
FAN FAN FAN

eGEM 16K GS
FAN FAN FAN

TRA, ET155 TRA, ET155 S S


APZ 212 55 PGW, GPHB PGW, GPHB C T T T T T T T T T T T T T C
APG 43 AGW AGW E E E E
B R R R R R R R R R R R R R GGG B
X T T T T X
- A A A A A A A A A A A A A P P P -
D 1 1 1 1 D
FAN FAN FAN

R HHH R
B 5 5 5 5 B
P R R R R R R R R R R R R R BBB P
5 5 5 5
/ 7 7 7 7 7 7 7 7 7 7 7 7 7 /
4 4

eGEM 16K GS eGEM 16K GS


S S S S
C T T C C T T T T T T C
E E E E E E E E
B S S T T T T T T T T T R R B B R R R R R R GG B
X T T I C T T C C X X T T P PP P A AT T A A X
- T T R R R R R R R R RA A - - A A A A A A P P -
D 1 1 R G 1 1 D D D D 1 1 G GG G GG1 1 GG D
R E E H H H H H H H H H R R H H R
B 5 5 B B 5 5 B B B B 5 5 W WW W WW 5 5 WW B
P BB B B B B B B B B BR R P P R R R R R R B B P
5 5 5 5 5 5 5 5
/ 7 7 / / 7 7 7 7 7 7 /
4 4 4 4

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 46


Ericsson High Density BSC
Summary

› Highest Capacity per Volume on the Market


– Up to 4095 TRXs
– Up to 18000 Erlang

› IP Support on all Interfaces

› Minimal Footprint
– 0.24 sqm / cabinet

› Low Power Consumption


– Max 280 mW per Erlang

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 47


Agenda
› BSC Hardware Dimensioning Principles

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 48


General BSC dimensioning
BSC interfaces

SMPC
(SMLC)

A-bis (Remote) Lb
BSC
(A)
A-ter MSC
MSC
TRC A
A

BSC
PCU SGSN
A-bis Gb

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 49


General BSC dimensioning
BSC Traffic and Signalling,Simplified!

TRX
EPDCH P 64
Locating
TCH T S
CP
TCH T S
etc
GS,
TCH
TCH
T S
T S TRHs TRAs ETCs,
BPDCH P 16
S RP bus
SDCCH S etc
T
BCCH S
A-if
Abis-if
T T
No7
S P T
T
P MSC
... ...
SGSN
One 64 Kbps TS on a 2 Mbps PCM link P
can carry 8/16/32/64 Kbps bit-streams
T = CS traffic Gb-if
S = CS signalling (LAPD)
P = PS traffic/signalling PCU Ethernet

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 50


General BSC dimensioning
GPRS Packet Handler Architecture !
Gb-if
(IP)

RPP High Capacity HW

ETC

Ethernet
RPP
Gb-if
(Frame High Dense HW
Relay) “All in GEM”

GPHB

64 Kbps TSs,

X ETC
each with
- 4 BPDCHs
or
- 1 EGPDCH

GS Abis
BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 51
General BSC dimensioning
Abis Optimization/IP!

Abis OPT
ETC TRA TRH
(without IP)

GS

PSTU, PGW GPH


SIU,...
Abis IP IP

IP LAN-switch & Ethernet


BTS STN BSC
Abis Optimization: Typically 25-35% bit rate saving (traffic dependent) by
statistical multiplexing gains, no sending when silence, no sending of
spare bits etc.
Abis over IP: Utilizing IP technology and products. Goes well together
with Abis Optimization.
Þ Abis Optimization and Abis IP features requires PGW HW!
Þ Abis IP requires a ”BSC LAN switch”!
BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 52
Transcoder

Transcoder board capacity

BYB501
R5B 24 channels per board

AXE810
R6A 192 channels per board
128 ch/board for TFO
64 channels AMR-WB (TFO)

R6B 192 channels per board


128 channels AMR-WB

AXE810
R7 384 channels per board
256 channels AMR-WB
BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 53
Transcoder
› Total traffic in the BSC 5000 erlang
Percentage Full Rate 40%
percentage Enhanced Full rate 40%
Percentage Half Rate 20%

› FR traffic 2000erl.
EFR traffic 2000erl.
HR traffic 1000erl.

› FR 2094*) devices 88 TRA R5 boards/11 TRA R6 boards/6 TRA R7 boards


EFR 2094*) devices 88 TRA R5 boards/11 TRA R6 boards/6 TRA R7 boards
HR 1071*) devices 45 TRA R5 boards/ 6 TRA R6 boards/3 TRA R7 boards

Totally: 221 TRA R5 boards or


28 TRA R6 boards or
15 TRA R7 boards

*) GOS 0.1%

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 54


Transcoder

› Fixed Half Rate


Distribute the traffic as in the example

› Dynamic Half Rate


The pools for EFR and FR must be
dimensioned based on that these TRA-
pools also should include HR traffic
capacity.

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 55


Product Packaging Constraints
Transcoder

› High Capacity BSC

› High Density BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 56


Transceiver Handler
RPG board capacity (memory limitation)
BYB501
RPG2 24 TRUs per board
16-18 more realistic

AXE810
RPG3 31 TRUs per board R R R R R R R R
24-25 more realistic P P P P P P P P
G G G G G G G G
3 3 3 3 3 3 3 3 T
R
AXE810 H
TRHB 256 TRUs per board B

Can (will) be lower depending on the traffic model, LAPDC/SDCCH, size of BTSs and
size of Location Area.
Calculation formulas included in dimensioning handbook

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 57


Product Packaging Constraints
TRH

› High Capacity BSC

› High Density BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 58


signaling link capacity

BYB501
RPG2 4 C7 signaling links per board

AXE810 Nb SS7
RPG3 4 C7 signaling links per board R R R R R R R R
P P P P P P P P
G G G G G G G G S
3 3 3 3 3 3 3 3
T
AXE810 E
R R R R B
STEB 128 C7 per board P P P P
STEB 4 HSL P P P P

HSL
BYB501/AXE810
RPP 1 HSL (ATM or TDM) per board

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 59


C7 connections, BSC-TRC, BSC-MSC

C7 ETC ETC C7

C7 ETC ETC ETC ETC C7

BSC TRC MSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 60


C7 calculation, MSC-BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 61


C7 calculation, BSC-MSC

Number of C7 connections:
Total octets/sec(TDM) / ( 8000 * 0.3)
alt.
Number of HSL(ATM)
Total octets/sec (ATM) / (240000 * 0.4)
alt.
Number of HSL(TDM)
Total octets/sec (TDM) / (240000 * 0.4)

The number of links should be in the quantity 2, 4, 8 or 16

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 62


C7 calculation, BSC-TRC

Number of subscribers connected to the BSC A


Busy Hour Call Attempts per subscriber B
Number of handovers per call C

Octets per BH& sub= A * B * (76 + (C * 109)) = D

Bit/s per sub = (D * 8) / 3600

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 63


Product Packaging Constraints
C7 Signaling

› High Capacity BSC

› High Density BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 64


E1- requirement, A’’ interface, BTS-BSC

Simplified TS calculation for Abis over TDM.


Number of TS required for each TRU 3
Number of TS required for each TRU(LAPD concentration) 2.25
Number of TS required for each TRU(LAPD multiplexing) 2
Number of TS required for each Cell (with Abis optimization), use Abis Optimization tool
(ALEX)

Example:
Number of TRUs connected to the BSc 1000
Number of TS connected 3000
Utilization degree of the E1 70%*)
Number of E1 required = 3000 / (31 *70%) 139

*) Depending on usage of chaining in DXU or usage of other cross-connect equipment

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 65


E1- requirement, A’’’ interface, BSC-TRC

Calculation example:

Total traffic from the connected TRUs 2000 erlang


Grade of Service for A’’’ interface 0.1%
Number of C7 links, BSC-TRC 4
Number of C7 links, BSC-MSC 8
Number of TS(64kbit/s) required for traffic = 2095 / 4 524

Number of E1 required = (524+4+8) / 31 18

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 66


E1- requirement, A-interface, TRC-MSC

Calculation example
Remote BSC1 500 erlang/2 C7
Remote BSC2 1000 erlang/4 C7
Remote BSC3 1000 erlang/4C7
Number of E1 for BSC1 = (555 + 2) / 31 = 18 E1
Number of E1 for BSC2 = (1072 + 4) / 31 = 35 E1
Number of E1 for BSC3 = (1072 + 4) / 31 = 35 E1

Total requirement = 88 E1

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 67


ET155 (STM-1)

Capacity of ET155

BYB501 Max utilization: 56 E1 per ET155

AXE810 Max utilization: 63 E1 per ET155

Redundancy of ET155
The ET155-1 supports two types of protection mechanisms:
– network protection (MSP 1+1)
– equipment protection.
One GEM magazine, up to 8 working ET155-1 and 8 protected (to
achieve full protection) ET155-1 can be fitted.

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 68


Product Packaging Constraints
ET-155

› High Capacity BSC

› High Density BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 69


PCU – Gb calculation
Gb over FrameRelay:
Gb Timeslot calculation =
Throughput kbit/s(IP level) *1.21 / 64k * 0.8
(1,21= IP overhead, 80% utlization of each TS)

Number of Gb links (E1) = Gb TS / 31 + 1


(including redundant link)

Gb over IP calculation:
Throughput kbit/s(user plane IP level) *1.37 * 0.8
(1,37= IP overhead, 80% utlization)

Number of E1 req. for Gb FR = Gb links

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 70


PCU – PDCH calculation
Calculation example for PDCH:

Total subscribers in network 250 000 subs.


% packet capable users 40%
% sim. attached and actively downloading users 10%
”SAU” 10 000
Total Gb traffic 1350 MB / Busy Hour
Traffic per subscribers => 135 kB per Busy Hour Subscribers per cell
33 subs. / cell
Total cells in network 300
Traffic per cell (Gb traffic/#Cells) 4.455 MB/cell = 9,9 kbps
Assumed PDCH throughput = 10 kbps
Calculate (E)PDCH per cell
(Traffic per cell)/(capacity per (E)PDCH) => 1 PDCH per cell
Calculate # of (E)PDCH per network => 300 PDCH

Note1! General 0.5-1 PDCH/E-PDCH per Cell are sufficient and reasonable to use in the BSC dimensioning, however
sometimes high number of PDCH/E-PDCH per Cell are required then this could be considered as a peak rate requirement.
The BSC dimensioning approach could in this case be to dimensioning for an average load of PDCH/E-PDCH, assuming
PDCH are dynamically set-up and all cells don’t peak simultaneously.

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 71


PCU, Capacity
RPP Capacity (used in High Capacity PP)
Gblink size BPDCH GEPDCH R R R R
P P P P
0 150 62 P P P P G
P
8 150 54 H
B
16 150 46
24 118 38
31 90 31

Gb link size 31 (FR), 300 BPDCH, 71 Gb TS =>

71 / 31 = 3 Gb RPP’s
300 – 3 x 90 = 30 BPDCH requiring one more RPP
3 Gb RPP + 1 A” RPP + 1 redundancy = 5 RPP’s in total (7 RPP in PP)

[300 EPDCH => 3 Gb RPP + 4 A” RPP + 1 red = 8 RPP’s (14 RPP in PP)]

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 72


PCU, Capacity
RPP Capacity (used in High Capacity PP)
R R R R
Gblink size BPDCH GEPDCH P P P P
P P P P G
0 150 62 P
H
8 150 54 B

16 150 46
24 118 38
31 90 31

GPHB Capacity (used in High Dense PP)

X/2 * PDCH + Y * EPDCH = 256 x 64 kbps GSL channels


Where
X = number of PDCH 16 kbps GSL channels
Y = number of EPDCH 64 kbps GSL channels
Gblink size is always 256 dedicated GB TS (64 kbps) per GPHB.

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 73


Product Packaging Constraints
PCU

› High Capacity BSC

› High Density BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 74


Group Switch, AXE810

Applications in SW
Applications in SW
STM-1
TRAB GSPU ET155
Generic speech Generic 155 Mbit
processing unit SDH Exchange Terminal
EC

GEM
4 * DL-3
RPBs 16 K MUP RPBs
A-plane B-plane
Interface

22 pos.
DLEB Device boards
DL3 MUX
GS plane A GS plane B
BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 75
PGW dimensioning

The Packet Gateway (PGW) is needed for the features Abis


Optimization and Abis over IP, to handle the communication of
the packet Abis (i.e. Abis Optimization and AbisIP) in the BSC.

Following PGW limitations should be considered in the HW calculation:


› Maximum number of TRUs running Abis OPT supported by one PGW is
100 TRUs!
› Maximum number of TRUs running Abis over IP supported by one PGW is
127 TRUs! (100 TRU if Abis Opt. is used)

› The capacity of PGW/2 is twice more than PGWB (Only for HD BSC)
› Maximum 32 PGWB for High Capacity BSC, and 21 PGWB for High Dense
BSC.

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 76


Product Packaging Constraints
PGW

› High Capacity BSC

› High Density BSC

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 77


Processor capacity

Main parameters required for processor capacity calculations:

- Originating- and terminating traffic per subscriber


- Mean Holding Time for originating- and terminating calls
- Originating- and terminating Short Messages per sub&BH
- Location Update frequency (number of LU per sub&BH)
- Handover frequency, inter-MSC,inter-BSC, intra-BSC
- Number of Location areas
- SIGTRAN or C7
- GPRS
etc.

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 78


Processor capacity
Capacity example(1.2 BHCA, TFO…..):
APZ 212 33C 580 000 subs, 698 000 BHCA

Please note the limitation of 512 TG, 1024 cells and/or


2048 TRU per BSC.

SIGTRAN impact, capacity same profile


APZ 212 33 492 000 subs, 591 000 BHCA (-15%)

BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 79


Load Distribution (CP)

100% ~ 5% Loadability Margin


To stay in the safe zone
Traffic Load
Calls, registrations, handovers,
paging, SMS point-to-point
~ 80 % (including margin for traffic
peaks ...)
Usage Load
Commands, operation &
maintenance in general

~ 5%
Idle Load
Basic load when no traffic or
O&M; size (HW) dependent
~ 10 %
0%
BSC HW Dimensioning Workshop | Commercial in confidence | 2010-08-11 | Page 80