You are on page 1of 46

L&T Heavy Engineering

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 1/46
L&T Heavy Engineering

What is Energy?
• Energy is capacity to do work.
• It can neither be created nor destroyed, only
converted from one form to another.

• Energy comes in different forms:


• Heat(Thermal)
• Light (Radiant)
• Motion (Kinetic)
• Electrical
• Chemical
• Nuclear Energy
• Gravitational

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 2/46
L&T Heavy Engineering

Energy Used at L&T - HZMC

• Electricity

• LPG & NG

• Diesel

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 3/46
L&T Heavy Engineering
Hazira Manufacturing Complex
INCREASING ENERGY DEMAND – WORLD SCENARIO

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 4/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Development – More the Energy use

45%

18%
14%
7%

%age of Energy use in India in Industrial, Transportation, Residential, Agriculture


19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 5/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Power Stations burn coal and produces smoke

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 6/46
L&T Heavy Engineering
Hazira Manufacturing Complex

More Power Stations more smoke

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 7/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Global CO2 emission


25.2 Billion Tons

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 8/46
L&T Heavy Engineering
Hazira Manufacturing Complex
Effect of CO2 emission

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 9/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Climate Change

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 10/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Climate Change

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 11/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Climate Change

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 12/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Limited Natural Sources – Reserves (Years)

Coal Natural Gas Oil


World 122 60 42
India 114 36 20

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 13/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Govt. of India Initiatives


• Enactment of Energy Conservation Act
• Formation of Bureau of Energy Efficiency (BEE)
• Formation of SDA
• Standards and Labeling program
• Demand Side management
• Bachat Lamp Yojana (BLY)
• PAT (Perform Achieve & Trade)
• Certification of Energy Manager/Auditor
• ECBC
• Designated consumers
• …many more
19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 14/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Frost Free refrigerator, Tubular Fluorescent Lamps


Room Air Conditioners, Refrigerator
Distribution Transformer, Induction Motors
Pump Sets, Ceiling Fans
LPG Gas stoves, Electric Geysers, Television
19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 15/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Energy Management
at
L&T HZMC

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 16/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Energy Management at HZMC


Top
Monitoring Technical
Management Strategy Plan
System Ability
support
• Corporate • Energy Policy • Monthly • Qualified staff
EHS review & work force
• Corporate
meeting
• HZMC CS level • Experienced
head Mr. objectives • Six monthly cross
K. Ram (VP) review in EHS functional
• HZMC level
chairs every MRC team
Energy objectives members
• Energy Audit
meeting • MP on Energy • Trainings and
conservation • Audit by CSR
awareness
in EHS system programs

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 17/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Electricity Consumption in HZMC


18000000 Ship-
build-
16000000 ing
9% Piping
14000000 LMB 5% MHC & Hostel
CTC
1%
(Boile 2% Heavy
12000000 r) Engg
14% 36%
10000000
8000000
6000000
4000000
2000000
0 LMTG MFF
17%
(Tur-
bine)
16%

2012-13 (4.8 Crore units, Rs 34 Crore )


19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 18/46
L&T Heavy Engineering
Hazira Manufacturing Complex

Electricity Consumption in HE
Extrapolated
25000000
Electricity consumption-
Generated (KWH)
20000000
Electricity consumption-
Purchased (KWH)
15000000

10000000

5000000

0
2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13

HE West started in 2008-09

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 19/46
L&T Heavy Engineering

Energy Scenario in HE (2012-13)

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 20/46
L&T Heavy Engineering

Energy Scenario in HE (2012-13)

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 21/46
L&T Heavy Engineering

Purpose of ISO 50001


• An EnMS enables an organization to achieve
continual improvement.
• Assist organizations in making better use of their
existing energy-consuming assets
• Create transparency and facilitate
communication on the management of energy
resources
• Promote energy management best practices and
reinforce good energy management behaviors
19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 22/46
L&T Heavy Engineering

Purpose of ISO 50001

• Assist facilities in evaluating and prioritising


the implementations of new energy-efficient
technologies.
• Provide a framework for promoting energy
efficient throughout the supply chain
• Facilitate energy management improvements
for GHG emission reduction projects
• Allow integration with other management
systems
19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 23/46
L&T Heavy Engineering

EnMS Concern

• Rising cost of energy


• Energy policies
• Corporate Social Responsibility
• Sustainability
• Global Warming

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 24/46
L&T Heavy Engineering

Benefits of ISO Energy Management Standard

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 25/46
L&T Heavy Engineering

Benefits of ISO Energy Management Standard

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 26/46
L&T Heavy Engineering

ISO 50001 Structure

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 27/46
L&T Heavy Engineering

Energy Management System Model

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 28/46
L&T Heavy Engineering

Declaration by Top Management

• Declaration to go for ISO 50001: 2011 Energy


Management Standard by top management in the
company FY 2012-13 Objectives .
• Set Target date to achieve ISO 50001:EnMS by May 2013

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 29/46
L&T Heavy Engineering
Hazira Manufacturing Complex

HE Energy Policy

HE Energy Policy is
Signed by Mr. Y S Trivedi,
Released on 1st March 13
Revision: R0

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 30/46
L&T Heavy Engineering

Formation of Apex Committee and MR

Mr. Mahesh Joshi,


Head - Maintenance is
Nominated as
“Management
Representative” ( MR )- EnMS

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 31/46
L&T Heavy Engineering

Management Program (MP’s)

• EnMS-OM-MP-01 (Reduction in Natural Gas


consumption for Pre Heating)

• EnMS-OM-MP-02 (Reduction Energy


consumption for HVAC)

• EnMS-OM-MP-03 (Reduction in Energy


consumption in ESSC Process)

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 32/46
L&T Heavy Engineering

Energy Base Line

• Quantitative reference providing a base for


comparison of energy performance
• An Energy baseline reflects a specified period of time
• The Energy baseline is also used for calculation of
energy savings, as a reference before and after
implementation of energy performance improvement
actions.

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 33/46
L&T Heavy Engineering

Definitions
• Energy Consumption:
Quantity of energy applied.

• Energy Efficiency:
Ratio or other quanitive relationship between an output
of performance, service, goods or energy, and an input of
energy.
Example: Conversion efficiency: energy required/energy
used; output/input; theoretical energy used to
operate/energy used to operate.
Note - Both input and output need to be clearly specified in
quantity and quality, and be measurable.

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 34/46
L&T Heavy Engineering

Definitions
• Energy Management System (EnMS):
Set of interrelated elements to establish an energy policy
and energy objectives, processes and procedures to achieve
those objectives.

• Energy Performance Indicator (EnPI):


Quantitive value or measure of energy performance, as
defined by the organization
Note – EnPIs could be expressed as a simple metric, ratio or
a more complex model.

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 35/46
L&T Heavy Engineering

Significant Energy Use


• Significant Energy Use:
Energy use according to substantial energy consumption
and/or offering considerable potential for energy performance
improvement
• In L&T Heavy Engineering following processes are energy
intensive.
• Welding, ESSC/SAW
• Machining
• Plate Rolling
• Lighting
• Pre Heating/Post Heating
• Material Handling
• Heat Treatment
19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 36/46
L&T Heavy Engineering

EnPI Measurement for EnMS


Sr.No. Energy usage in Process EnPI Energy Source

1 HVAC kWh/Sq.ft area Electricity NG

2 Lighting kWh/Sq.Mtr Electricity

3 Canteen kWh / food cooked for nos. of persons Electricity NG

4 Air compressor kWh/CFM Electricity

6 Machining kWh/SMH Electricity

7 Welding KWh / Kg. of electrode consumed Electricity

8 HEAT TREATMENT SCM / Cycle Time in hrs Electricity NG

9 Power generator sets Fuel consumed /Kwh generated Diesel NG

10 Flux Heating kWh/Kg Electricity

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 37/46
L&T Heavy Engineering

Energy Objective and Target

1) Increase 15% energy savings YOY by Continuously identifying and implementing new
methods of energy conservation and efficiency as below:

a.      Use of alternate sources ( use of natural & renewable energy – use of daylight, solar
energy, solar pipe lights, bio-gas, wind energy, etc.)
b.      Use of new technologies (e.g. use of LED lights instead of conventional lights,
occupancy sensors, Variable frequency drives, welding inverters etc.)
c.       Enabling behavioral change (monitoring consumption for a building and taking
measures like increase in AC temperature, switching off lights when not necessary)

2) Reduce 5-10% Carbon Footprint YOY (Reduction in Total Energy Consumption in


offices and shops.

3) Identify the best measure for Specific Energy consumption and reduce the same
every year by 5%

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 38/46
L&T Heavy Engineering

Role of Production Supervisor in EnMS

• Maintain Equipment list in their shop.


• Using Energy Efficient machines.
• Stop Energy Wastages.
• Ensure that no machine run in idle.
• Do energy review, Prepare energy forecast
for their shop process.
• Provide justification (CAPA) for energy
consumption if deviated from forecast.

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 39/46
L&T Heavy Engineering

Role of Purchaser in EnMS

• Prepare & document Energy purchasing


specification, as applicable for effective energy
use.
• Calculate Life Cycle Costing of Equipment before
procurement.
• Procurement criteria to be evaluated on basis of
energy performance.
• Purchase Energy Efficient Equipment. i.e Energy
star, Energy Efficient motors etc.

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 40/46
L&T Heavy Engineering

Audit for ISO 50001

• Internal Audit for ISO 50001 is planned during


22nd April to 25th April.
• Audit will be conducted by internal audit team
in manufacturing shops, yard and all other
departments.
• Audit plan, audit guidelines and checklist will be
sent shortly.
• Internal Audit will be followed by External Audit
by DNV on 30th April 2013.

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 41/46
L&T Heavy Engineering

Equipment wise Energy Consumption


Equipment Idle Running Energy in KW Cost of 1 Hour idle running in Rs.
Fan and Blower 2.2 15.4
FLUX RECOVERY 2.2 15.4
AIR COMPRESSOR 15 105
HAND LAMP 0.06 0.42
LED Hand Lamp 0.008 0.056
HELOGEN LAMP 0.5 3.5
Tractor lamp 24VAC 0.6 4.2
PORTABLE OVEN 0.25 1.75
TUBE LIGHT 0.04 0.28
Over head light 0.4 2.8
Office celling FAN 0.06 0.42
Air Cooler 0.2 1.4
Air Conditioner 2 14
Memco Welding M/c 0.25 1.75
Fronius Welding Machine 0.1 0.7
AC 1200A Power Source 2.5 17.5
DC 1000 Power Source 2.7 18.9
DC 1500 Power Source 3 21
Power Wave SD 1000A 0.2 1.4
Tig M/c pump 0.35 2.45

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 42/46
L&T Heavy Engineering
Hazira Manufacturing Complex
National Energy Conservation day

Competitions on Energy
posters, Quiz and Slogan

Display of energy efficient


equipment

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 4346
L&T Heavy Engineering
Hazira Manufacturing Complex
National Energy Conservation day

Chief guest
Mr. H S Patel, IAS (MD DGVCL)

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 44/46
L&T Heavy Engineering
Hazira Manufacturing Complex
Energy Conservation Awards

1999-00 2005-06

2003-04 2009-11
19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 45/46
L&T Heavy Engineering

Using Energy is Our Right,


but
Conserving Energy is Our Responsibility.

Thank you

19th April,2013 © 2012 Larsen & Toubro Limited : All rights reserved 46/46