Name of the scheme: Construction of right bank embankment on
river Pagladia from Jartaluk to Niz Borsiral via G.K. Ali
including anti erosion measures at different reaches under BTC area.”
Name of the Division : Baksa W.R. Division, Mushalpur.
Name of the Sub–Division : Mushalpur W.R. Sub Division

Estimated Cost: Rs. 1499.30 Lakh


Name of District : Baksa.

No. and Name of LAC: 62 Barama LAC.


Problem: Bank erosion at Chapatal, Bherbheri and Niz Barsiral.
Flood innundation in entire Uzirghat, Chapatal, Bherbheri,
Garbhitar, Barakhat, Niz-Barsiral, Majusiral, hataibari,
Khorkuchi, Dhamdhama, Balitara, Namati, Baragra etc. including
North side of NH-31 Crossing area
Reference of TAC: 84th special TAC
B. C. Ratio: 1.87 :1
Benefited area: 100 Hectare
Population Benefited: 50,000 Nos.
Provisions: -
• Reach length = 7500 M
• Bank revetment with A-type Geo Bag over Geo-Sheet as filter
media.
• 6M Type-B Geo bag apron
• Toe-key (1.50M x 0.90m) in cage.
• PSC porcupine 3 rows on up-stream and down stream of
revetment and in front of apron.
INDEX MAP
SATELLITE IMAGERY MAP OF THE LOCATION ON 02/052021.
COMPASS PLAN
TYPICAL CROSS SECTION
TYPICAL CROSS SECTION
PHOTOGRAPH OF PROPOSED SITE
PHOTOGRAPH OF PROPOSED SITE