Manual Track Renewal IRSE
Manual Track Renewal IRSE
N.R.Kale (AXEN/1)
Classification of Renewal
1. Complete Track Renewal (Primary)- C.T.R.(P)
2. Complete Track Renewal (Secondary)- C.T.R.(S)
3. Through Rail Renewal (Primary) – T.R.R.(P)
4. Through Rail Renewal (Secondary) – T.R.R.(S)
5. Trough Sleeper Renewal (Primary) – T.S.R. (P)
6. Trough Sleeper Renewal (Secondary) – T.S.R. (S)
Contd. ….
52 Kg 8.00
90 R 5.00
Contd. ….
Lateral Wear
90 R 250 GMT -
CS No. 130 dated 16.11.2012
Corrosion
Beyond 1.5 mm in web & foot zone may be
possible)
P&C- Thick web Switches, CMS Crossings on fan
shaped layouts
Minimum sleeper density to be
proposed as per CS No.130 dated
16.11.2012
Location Sleeper density
All Main line irrespective of traffic 1660 nos /KM
density
Deep Screening
on same day
Work during block period
Remove remaining fastenings and bolts ,no sooner the
block is allowed.
Dismantle old track & keep it on opposite side.
Do not disturb centre line pegs.
Level ballast in sleeper bed.
Spread new sleepers to correct spacing & link new
rails over sleepers, using correct expansion liners.
Provide only two central bolts & tighten lightly,rails
straightened up,roughly aligned & spacing adjusted
( as per marking on new rails)
Contd. …
Base rail first aligned & keyed. Opposite rail
then linked to correct gauge.
At the end of predetermined length,insert
rail closure & connect old & new tracks.use
junction fish plates if required.track then
lifted & packed
Remove block allowing traffic at 20kmph
after ensuring that all sleepers are
supported
Works during post block period
90 R 60.00 mm
75 R 54.00 mm
Chamfering of bolt holes