You are on page 1of 16

Internship

(Besi Apac Sdn.


Bhd.)
Name: Muhammad Akmal Naim bin Ramrouse Mazlan
(2170225)
Lecturer Supervisor: Ir. Dr. Balamurugan a/l Annamalai
Gurunathan
Industry Supervisor: Encik Syarafuddin Abd Samad
Introduction

Between July 26th, 2021 and Besi Apac Sdn Bhd. in the location Inspection by Off (IBO)
October 1st, 2021 of Seksyen 26, Shah Alam under Department.
Encik Syarafuddin Abd Samad.
examine each module assembled and do
standard testing on specific modules.
Objectives

Expose students To adopt the Exposed student Introduce Help student


with the working students to the learned students towards improve self-
environment. Engineering theory in working confidence and
practice and university into organization soft skills as a
professional real working structure and preparation
attitude. situation. management before been
procedure. absorbed to
working industry.
Scope

 Observe working organization, management and administration


 Inspection and quality control
 Designation and Consultant
 Undergo testing works
Background

End 2020, Besi employed a


total staff of 1,618 fixed and
BE Semiconductor Industries
temporary personnel of Besi Apac Sdn Bhd was
N.V. (Besi) is a global
whom approximately 68% situated in Shah Alam,
company with headquarters
were based in Asia and 32% Selangor, at Seksyen 26.
in Duiven, the Netherlands.
were based in Europe and
North America.

Besi is engaged in one line of


Besi's assembly equipment
business: the development,
product portfolio is primarily
manufacturing, marketing,
designed and developed in
sales and service of
Europe and manufactured in
semiconductor assembly
Asia.
equipment.
Organizational Structure
Vision and Mission of Besi Apac

Vision Mission
The first choice for employees, customers,  Provide high-tech solutions to enable
suppliers, shareholders, Besi and all innovation & enrich people’s lives.
interested parties.  Exceed industry average benchmarks of
financial performance.
 Operate its business in a sustainable way
respecting both the environment and
society.
 Become the world’s leading supplier of
semiconductor assembly equipment for
advanced packaging applications.
 Create long-term value for its stakeholders.
Work Culture

 Working hour for trainee is from


0830H to 1730H
 Working day is from Monday to
Friday.
 To avoid creating excessive electric
fields, each employee must wear
the ESD smoke supplied before
entering the assembly area
 Even before getting to the location,
we need put on safety shoes and PP
cover shoes
 We need to access ESD Tester door
check before entering the area.
General role
 The program at Besi Apac Sdn. Bhd. has assigned me to IBO in the assembly module.
 inspecting and testing assembly products and ensuring that they meet both mechanical and
electrical designs as well as perform to a certain standard.
 Student assessment requires daily reports in the form of logbooks which must be filled
with daily activities.
 Job descriptions:
 examining all modules assembled by assemblers,
 analyze and repair the modules that do not meet specifications,
 conduct standard testing of many different modules using Test Unit,
 following the guidelines for the materials and products by examining drawings and
instruction manuals,
 evaluating whether modules should be accepted or rejected based on the test unit or
drawings.
Before
 Open SAP Items windows.
 Fill in the materials number which
display on the Job Card of a module.
 Observe if the module has Assembly
Check (ASSCH) or not.
 Observe the mechanical drawing and
electrical drawing of the modules
according to Bill of Materials (BOM)
list.
During
 To make sure wiring of the module is
operational, it must be checked using a
multimeter.
 Ensure that the labels are placed
properly on the different parts of the
module, because there are many wires
and components.
 We start up the Test Unit via the PC
only once we have finished all the
connections and follow the instructions
given.
Example Module
Ring illumination substrat
Bondforce sensor camera
Example Module
Buffer line Wafer stretcher
After
 The modules need to be put back in
their packaging and recorded.
 Record the module in the SAP items.
 Place the green ‘ACCEPTED' label on
the package and keep it in a separate
area for transportation.
If the sound not coming from the multimeter while
testing the machine because the wiring is messed up
or the cable is not properly connected, and we pass
the modules, it may lead to devastating results.

Precautionary The electrical drawing must be understood clearly so


that any wiring mistakes may be found early.
Measure
Ensure that labels and stickers are accurately applied
to the product, depending on the job order and
manufacturing amount on the job card.
Conclusion

My internship in Shah Alam at Besi Apac Sdn Bhd has been a


success.

Most of these experiences are important for me to be ready


and well-prepared when I am entering the real jobs in the
future.

The lessons I learned from all these experiences showed me


that top-level and lower-level management must work
together to ensure the seamless execution of all projects.

You might also like