Find the :
1.Current generated by Generator A
2. Current generated by Generator A
Find the :
1.Apparent(S) Power used by Consumer A
2.Apparent(S) Power used by Consumer B
4. Reactive(Q) Power of Load of Consumer A
5. Reactive (Q) Power of Load of Consumer B
6. % Loading for Generator A
7.JILAN
% Loading
ANAK for Generator
GAWING A L1-L3 EIC
CH00870
7 C01023
Effects Low Power Factor
-Power losses in cable
Find the :
1.Power losses in cable for Consumer A
2. Power losses in cable for Consumer B
JILAN ANAK GAWING CH00870 L1-L3 EIC
8 C01023
Effects Low Power Factor
-Voltage drops increased in cable, any contact, conductor.
Find the :
1.Voltage Drops in cable for Consumer A
2. Voltage on consumer A
3. Voltage Drops in cable for Consumer B
4.Voltage on consumer A
JILAN ANAK GAWING CH00870 L1-L3 EIC
9 C01023
Capacitor Bank in MSB
A bank for capacitor group and assemblies for
power factor correction.
There are :
1. Three Capacitor
2. PFR and Auxiliary
3. Bus bar
4. Bleeder Resistor (If any)
5. Reactor (If any)
6. Circuit Breaker or Fuse
Find :
1. I3 at PF =0.7
2. I1 at PF =0.7
3. Total Reactive Power of capacitor bank.
4. Current of Capacitor bank (I2)
5. I1 at PF =0.9
JILAN ANAK GAWING CH00870 L1-L3 EIC
23 C01023
Exercise :
Given MSB 500KVA,Three Phase,415V,50Hz,estimated
PF =0.75 Lagging, system compensation required at
PF = 0.85 Lagging. Find :
1-Total Reactive Power of Capacitor Bank to fulfill that
system.
2-Define total step for Capacitor Bank(Capacitor 10KVAR)
Example :
Given 12 Step Capacitor Bank which 10KVAR per Step,
specify sufficient :
1.MCCB size for a capacitor in step.
2. Main MCCB for whole steps.