Pre-Con Meeting - Survey
Pre-Con Meeting - Survey
Contents
Filling work
Access road
Temporary fence
TOA-WASKITA-WAKACHIKU-HUTAMA-ABIPRAYA JOINT OPERATION (TWWHA JO)
PATIMBAN PORT DEVELOPMENT PROJECT (II)
PACKAGE 5: CAR TERMINAL CONSTRUCTION
6. Passenger Jetty
7. Survey
7. Survey
Pre-Construction Survey
1. Pre-Topographic Survey
2. Pre-Hydrographic Survey
7. Survey
7. Survey
7. Survey
Topographic Survey Hydrographic Survey
7. Survey
Dredging, CDM and CPM
Disposal Area
• Pre-Hydrographic Survey terminal
dredging area and disposal area (SBES
and MBES)
• Interim Hydrographic Survey terminal
Terminal Area
dredging and disposal area (SBES and
MBES)
• Post Hydrographic Survey terminal
dredging area and disposal area (SBES
and MBES)
2. Project Location
Approx. 120km
3. Site Condition
Current Condition
Upon Completion
PKG5 & PKG6
3. Site Condition
8 . ORGANIZATION