Professional Documents
Culture Documents
Network Diagram
Legend
Switch RG BTU
Fiber Customer’s
1 Meter 1 Meter
If any Installation
TM to provide
Customer’s Rack
Scopes
Two types of site installation
School with 1 Unifi service
Others
Ensure all installers to dress according to the dress code & bring along their pass card
Abide to all OSH guideline for safety purposes
All submission of MOE’s UAT documents should reach below contact persons within one week of site completion
Work Instruction
1 Receive order via SWIFT tablet
2 Refer to account name (MOE) for customer verification and login for exact location
4 Call & brief to the customer on the project (Projek Perkhidmatan Internet Interim di Sekolah & Agensi KPM)
5 Confirm with customer on exact location (ensure it is installed near existing LAN Switch Rack, if available)
8 Installer to proceed with another round of UAT based on MOE’s UAT format. Scan and email to aishah@tm.com.my;
qayyulhamri@tm.com.my; norhafizah.mhanif@tm.com.my; nhani@tm.com.my
9 Post the MOE’s UAT hardcopy form to TMONE contact person (as per previous slide)
10 For Non Standard Installation payment VDM will provide the required process and method for claiming purpose
Unifi Installer Special Work Instruction - Attachment
It is expected for UI to perform additional UAT based on Manual UAT Form and
MOE UAT FORM as per below attachment.
Microsoft Word
Document
Adobe Acrobat
Document
Thanks