CONTRACT DOCUMENTS FOR

THE CONSTRUCTION PROJECT


Administrasi dan Kontrak Konstruksi

Embun Sari Ayu


01 AGREEMENT

02 GENERAL CONDITION
DOKUMEN
KONTRAK
03 SPECIAL STIPULATION

04 TECHNICAL DRAWING

05 TECHNICAL SPECIFICATION
1. Contract Value (Nilai Kontrak)
2. Term of Payment (Aturan Pembayaran)
3. Contract Duration and Timing
THE 4. Contract Signing
AGREEMENT 5.

Other Related Documents
Instruction to bidder
• Bid form
• Bond form

3
Standar Form of General Condition
•AIA (American Institute of Architect)
•AGG (American General Contractors)
GENERAL •EJCDC (Engineer Joint Contract Document Committee)
CONDITION •FIDIC (Federation International Des Ingenieurs Counceils)
•ICE (Institution for Civil Engineers)
•AV-41 , SU- 41
• Scope, ownership
• Owner
• Contractor
• Contract Administration : responsibility during
construction
GENERAL • Claim and Dispute
CONDITION • Arbitration

CONTENT • Subcontractor
• Change
• Time and Progress
• Method of Payment
• Protection against labor and property
• insurance and bond
1. Define the uniqueness of particular
project
2. This part functions to strengthen and add
SPECIAL those of general condition
3. Content :
STIPULATION • Owner supply material
• Construction star date
• Special procedure abd (as built drawing)
1. Technical Specifications and Drawing are each
complementing the other
2. Specification maybe ineffective TECHNICAL
• It specified model/type of item that is not DRAWING AND
available any more
SPESIFICATION
• Provisions of quality are vague ar contradicting
CONTRACTOR’S OBLIGATION
DURING CONSTRUCTION

1. Submittal of Report (as required in


special provision)
2. Guideline for operation and maintenance
3. ABD (as built drawing)
THANKS!