Reported By
Md. Samnoon Runaf, EHS Advisor
Sheikh Ariful Haque, Production Supervisor
Reinstate of fallen bags
Reinstating the fallen bags of Barite (1.5 ton/bag) into the store with
Forklift or HIAB Agreed
The gap between these two warehouse is too close for forklift movement
Reinforce the supporting angle bar
Reinforce the impacted/damaged angle bar which used to support the shade structure.
As the begs leaning against the wall, it is pretty unsafe to go for reinforcement given condition.
The first thing we have to do is to reorganize the begs inside the warehouse to avert any
leaning against the wall and then go for reinforcement. Reorganizing requires adequate
manpower and equipments and is subject to management approval.
Repair the damaged portion
Damaged portion of the warehouse need to be repaired to keep the warehouse secure.
Reinforce the structure from outside to avoid disturbing the other chemical bags inside.
As the begs leaning against the wall, it is pretty unsafe to go for reinforcement given condition. The first thing we have to do is to
reorganize the begs inside the warehouse to avert any leaning against the wall and then go for reinforcement. Reorganizing requires
adequate manpower and equipments and is subject to management approval.
Hard barrier
Both the sides (South & North) of the gap in between two warehouses should be barricaded by fence
material, so that security guards can check during their patrolling. Agreed
Avoid the outer adjacent areas
Avoid the walkways very close
to this warehouse,
Need to install the Sign Post around the warehouse and make the
security guards aware about the potential hazards.
Housekeeping
3 ton Barite bags are kept on a wooden pallet which is getting deteriorated due to longer period of storage.
These could fall or disturbed by any movement, vibration or even for earthquake.
All the bags need to be kept in a proper manner to avoid any further collapse.
Reorganizing requires adequate manpower and equipments and is subject to management approval.
Observations
Chemical bags still rested on the shade/corrugated sheets inside the warehouse which is making stress on the
joints.
Reorganizing requires adequate manpower and equipments and is subject to management approval.
Observations
a b c d
A few holes were observed on the corrugated sheets which is the sign of damage. (Picture: a, b)
The corrugated sheets become corroded at the bottom part of the warehouse which is also a sign of
weakness of the structure. (Picture: c, d)