You are on page 1of 6

AIR CARGO LOGISTICS

UNIT 4 – PART 2 – AIR CARGO FACILITY ANALYSIS


FACILITY REQUIREMENTS
1) Air Cargo Buildings
2) Aircraft Parking Positions :
FACILITY REQUIREMENTS
3)Landside Effectiveness – Access to road

4)Truck Docks,Employee & customer parking


LAYOUT PLANNING ISSUES
• Below are the issues in planning Layout for the airport.

1)Land Use Issues - productive use of all airport property

2) Site Constraints - include topography, poor soil conditions,


environmental contamination etc.
Design Consideration
• Building Dimensions and Configuration
• The airport apron, apron, flight line, ramp, or tarmac is the area of
an airport where aircraft are parked, unloaded or loaded, refueled,
boarded, or maintained. This area should be designed effectively.
• Equipment Staging Areas should be provided adjacent to the
building.
• Airside Vehicular Circulation -Tug Roads provided
• It should meet Federal Aviation Administration standards.
THE END

You might also like